PP-13-009 TOUCHSTONE PLACEE IDIAN
Mayor Tammy de Weerd
City Council Members:
Keith Bird
Brad Hoaglun
Charles Rountree
David Zaremba
TRANSMITTALS TO AGENCIES FOR COMMENTS ON
DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN
To ensure that your comments and recommendations will be considered by
the Meridian Planning and Zoning Commission please submit your
comments and recommendations to [Vleridian City Hall
Attn: Jaycee Holman, City Clerk, by: 13-Jun-13
Transmittal Date: May 23,2013 File No.: PP 13-009 & CUP 13-003
Hearing Date:
Request: Public
June 20,2013
Hearing: Prelimi nary Plat approval consisting of 16 multi-fam lots and 6 common
lots on approximately 4.38 acres in an existinq R-lSzoning district AND Conditional Use Permit for
64 multi-familv dwellinq units in an existing R-l5 zoninq district for Touchstone Place
By: lron Mountain Real Estate, lnc.
Location of Propefi or Project south side of E. Fairview Avenue and west of
N. Stonehenge
_Joe Marshall(No FP)
_Scott Freeman (No FP)
_Steven Yearsley (No FP)
_ Michael Rohm (No Fp)
_ tVlacy tVliller (No FP)
_Tammy de Weerd, lVlayor
_Charlie Rountree, C/C
_Brad Hoaglun, C/C
_ Keith Bird, C/C
_David ZarembaClC
_ Sanitary Services
_ Building Department / Rick Jackson
_ Fire Department
_ Police Department
Citv Attornev
/Communigbevelopment
_City Planner
_ Parks Department
_ Economic Dev.
City Engineer
_ Meridian School District (No Fp)
_ Meridian Post Otfice lrene/SHp onty)
_Ada County Highway District
_Ada County Development Services
_ Central District Health
_COIVIPASS (Comp Plan only)
_Nampa Meridian lrrig. District
_ Settlers lrrig. District
ldaho Power Co. lrR,ee,cup/sHp only)
Qwest (FPIPP/SHp only)
I ntermountain Gas (Fp/pp/sHp onty)
-
ldaho Transportation Dept. (No Fp)
_Ada CountyAss. Land Records
Downtown Projects:
_ Meridian Development Corp.
_ Historical Preservation Comm.
1. PROJECT NAME
2. LOCATION OF
RT
f€ (/ c/'/ Jqv/l/?t /t.n <
\,-
WA o/<
3. LOCATION OF
+, IS A PRV REQUIRED FOR THIS PROJECT2-<YES-NO-
0F YES PLEASE INDICATED LOCATION ON MAP) , 1a , ./
FTREFLo\ry REer,.trREMENTs MET FoR REsTDENTT AL? /u l7H i',2 l'z
5. IS A FLUSH LINE REQUIRED?
6. IS ANY PART OF THIS PROJECT -YES-IN NO?THE FLOOD < PLAIN
(YES) (NO
7. IS THIS PROJECT
WATER LINES
d--
TO UPSZE/OVER DEPTH ON ANY
nrc,r2
-(ON
SITE / OFF SITE)
B. IS THIS PROJECT REQUIRED TO UPSIZE/ OVER DEPTH ON ANY
SEWER LINES
-(ON
SITE / OFF SITE)
/cre*
ruxJL
"*"**h
'P'l'e @
C Ca,\-- o*6nn- ,
//r/
'g.**u
WATER SEWER
South of RR / SW ft/eridian:
_NW Pipeline
_ New York lrrigation District
_ Boise-Kuna lrrigation District
Boise Project Board of Control / Tim Page
Your Concise Remarks
City Clerk's Office o 33 E. ldaho Avenue, Meridian, lD 83642
Phone 208-888-4433 o Fax 208-888-4218 r www. merid iancity. org