Loading...
AZ-12-012 Application ChecklistE IDIAN Mayor Tammy de Weerd City Council Members; Keith Bird Brad Hoaglun Charles Rountree IDAHO David Zaremba October 25,2012 Kevin Mccarthy Km Engineering, Llp 9233 West State Street Boise,ID 83714 RE: Tradewinds Subdivision (PP-1 2-015) Dear Mr. Mccarthy This letter is to inform you that the subject application is scheduled to be heard by the City of Meridian's Planning & Zoning Commission on November 15, 2012. The hearing will be held at the Meridian City Hall, 33 E. Broadway Avenue, in the City Council chambers at 7:00 p.m. In accord with UDC 11-5A-5D, a public hearing notice is required to be posted on the property under consideration on or before November 5,2072, not less than ten (10) days prior to the pubiic hearing. Proof of posting consisting of a notarized statement and a photograph of the posting is required to be submiued to the City no later than seven (7) days prior to the hearing attesting to where and when the sign(s) were posted. If you do not submit the certificate by such date, the hearing will be continued. Please refer to Unified Development Code 1 1-5A-5D for the appropriate posting requirements. Ifyou have any questions please feel free to contact our office at 884-5533. Thank you for contributing to the success of Meridian. Please help us serve you better in the future. Visit our web-site at www.rneridianci4r.org departments/planntng/comment card to fiIl out a customer survey and give us feedback on how we are doing. Sincerely, @o,io,*.Q/lgfd. Barbara Shiffer Administrative Assistant II Community Development 884-5533 Community Development Department 33 E. Broadway Avenue, Meridian, lD 83642 Phone208-884-5533 Fax208-BB8-6854 www.meridiancity.org d{rry Planning Department PRELIMINARY PLAT r Application Checklist Proiectname: Tradewinds Subdivision File+: lF-llO Applicant/agent: SDN, LLC / I(M Engineering, LLP All applications are required to contain one copy of the following: Note: Only one copy of the above items need be submitted when submitting multiple applications Additional Requirements for Preliminary Plat Applications: 33 E. Broadway Avenue, Suite 210 o Meridian, Idaho 83642 Phone: (208) 884-5533 o Facsimile: (208) 888-6854 o Website: www'meridiancity.org (Rev.6/02201 1) Applicant ({) Description Staff ({) x Completed & signed Commission & Council Review Application x Narrative fully describing the proposed project x Irgal description of the subject property (tot, Block, and Subdivision name if located in a recorded subdivision OR a metes and bounds legal description of the proag4t if not in a subdivision.) x Recorded warranty deed for the sub.lect property x Affidavit of Legal Interest signed & notarized by the property owner (If owner is a colporation, submit a copy of the Anicles of Incorporation or other evidence to show that the person signing is an authorized agent.) l./ x Scaled vicinity map showing the location oj t L/ x Pre-application meeting notes (All applications that require a public hearing are required to conduct a pre- aoolication meeting with the Planning Depanment.) x Neighborhood meeting sign-in sheet (Applicants are required to hold a neighborhood meeting to provide an opportunity for public review of the proposed project prior to the submittal of an application.) x CommitmentofPropertyPostingformsignedbythe x Fee (Please call Planning Department to calculate correct fee. Applications with incorrect fees will not be accepted.) Applicant ({) Description Staff ({) x Include the following additional information in the project narrative: the ordinance describing the particular provision, the variance requested, and the reason thereof development. (e.g., larger rear setback to buffer adjoining propeiqgq.g!9.) x Approval of the proposed subdivision name from the Ada County Surveyor's office x Preliminary Plat-* I copy (folded to 8 /2" x t l" size) The following items must be included on the preliminary plat: l,/ x a Proposed subdivision name (Do not use numbers in preliminary plat names.) x a Drafting date x a Section location and county (situate statement) x a North arrow x a Scale (not less than 1"=100') x a Name, address and phone number ofowner(s), applicant, and engineer, surveyor or planner who prepared the preliminary plat n/a a Proposed site(s) for parks, playgrounds, schools, churches or other public uses x a Streets, street names, rights-of-way and roadway widths, including adjoining streets or roadways (details on plan) x I Proposed and existing lot lines and blocks showing scaled dimensions and numbers of each x a Legend of symbols n/a a Minimum residential house size (for R-2 and R-4 ZSqgqq!y) x a Contour lines shown at 5' intervals where land slope is greater than l07o and at 2' intervals where land slope is lUVo or less, referenced to an established benchmark, including location and elevation x a Any proposed or existing utilities including, but not limited to, storm and sanitary sewers, irrigation laterals, ditches, drainage, bridges, culverts, water mains, fire hydrants, streetlights, pressurized irrigation and their respective profiles. x a Any dedications to the public and easements together with a statement of location, dimensions and purposes ofsuch x a Master street drainage plan, including method of disposal n/a a Floodplain boundary as determined by FEMA or measures to amend this boundary x a Stub streets to provide access to adiacent undeveloped land or existing roadways x a Block faces not more than seven hundred fifty feet (750') in length without an intersecting, street or alley (residential districts only) '!a a Block lengths not greater than thirteen hundred feet ( I ,300') without a pedestrian connection (residential districts only) n/a a Cul-de-sac lengths not in excess of450' x Reduction of the preliminary plat (8 th" x 11") x Landscape plan - *1 copy (folded to 8 Vz" x I l" size) Planmust have ascale no smallerthan 1" = 50'(1" = 20'is preferred) and beona standarddrawing sheet, not to exceed 36" x 48" (24" x 36" is preferred). A plan which cannot be dra|n in its entirery on a single sheet must be drawn with appropriate match lines on fwo or more sheets. The following items must be included on the landscape plan: x a Date, scale, north arrow, and pro.ject name x Names, addresses, and telephone numbers ofthe developer and the person and/or firm preparing the plan x a Existing natural features such as canals, creeks, drains, ponds, wetlands, floodplains, high groundwater areas, and rock outcroppings. x Location, size, and species of all existing trees on site with trunks 4 inches or greater in diameter, measured 6 inches above the ground. Indicate whether the tree will be retained or removed. v x a A statement of how existing healthy trees proposed to be retained will be protected from damage during construction x a Existing buildings, structures, planting areas, light poles, power poles, walls, fences, berms, parking and loading areas, vehicular drives, trash areas, sidewalks, pathways, stormwater detention areas, signs, street furniture, and other man-made elements. a Existing and proposed contours for all areas steeper than20Vo slope. Berms shall be shown with one-foot contours. x a Sight Triansles as defined in 1 l-3A-5 ofthis ordinance. x a Proposed landscaping )t x a Proposed screening structures x Calculations of project components to demonstrate compliance with the requirements of this ordinance, including: > Width of street buffers, lineal feet of street frontage, and number of street trees Supplementary information at the discretion of the Director or City Engineer may be required to sfficiently detail the proposed development within any special development area, including but not limited to hillside, planned unit development, floodplain, cemetery, manufactured home parks, and/or hazardous or unique areas of development. *Once an application is accepted, staffwill contact you to let you know how many additional copies of plans are required. All plans are required to be folded to 8 /2" x I l " size. APPLICATION WILL NOT BE ACCEPTED UNLESS ALL APPUCABLE ITEMS ON THE CHECKLIST ARE SUBMITTED, THIS APPUCATION SHALL NOT BE CONSIDERED COMPLETE (NOR WILL A PUBLIC HEARING BE SET) UNTIL STAFF HAS RECEIVED ALL REQUIRED INFORMATION. x ) Mitigation for removal of existing trees x Reduction of the landscape plan (8 Vz" x 1 1") x Site report of the highest seasonal groundwater elevation prepared by a registered soils scientist ,,/ x Written confirmation that a traffic impact study is not required and/or has been submitted for review to ACHD. Please contact Mindy Wallace at 387-6178 or Christy Little at 387-6144 for more information. x Submit two (2) sets of conceptual engineering plans, including respective profiles to Public x Works Conceptual for approval elevations (208-of 898-proposed 5500). structures, including building materials 4 Electronic Submittal (Separate disks required) x (1) Disk with electronic version of the conceptual engineering plans in a format that complies with the Specihcations for Project Drawings found at: http://www.meridiancity.ors/public works/autocad standards/index.asp ,./ x ( 1 ) Electronic version of the preliminary plat & landscape plan in pdf format submitted on a disk with the hles named with project name & plan type (i.e. preliminary plat, landscape plan, etc.). We encourage you to also submit at least one color version for presentation pumoses. t/ t IAN Planning Department IDAHO ANNEXATIONiREZONE r Application Checklist Proiectname: Tradewinds Subdivision File #: A? | r otl Applicant/asent: SDN, LLC / KM Engineering, LLP Application is required to contain one copy of the following: Applicant (J) Description Sraff (J) x Completed & signed Commission & Council Review Application t/- x Narrative fully describing the proposed project x Legal description of the property to be annexed and/or rezoned o Include a metes & bounds description to the section line of all adjacent roadways, stamped & signed by a registered professional land surveyor, with a calculated closure sheet. r Scaled exhibit map showing the boundaries of the legal description in compliance w/ the requirements of the Idaho State Tax Commission Property Tax Administrative Rules IDAPA 35.01.03.225.01.h. o Ifrequesting more than one zoning designation, include a legal description for each zone along with an overall annexation/rezone boundary description. Also include the boundaries of each different zone on the map. 4Note: Wen also submitting a Preliminary Plat application, a separate legal description is required for the boundaies of the plat, excluding property to the section line as required for annexations/relones. x Recorded warranty deed for the subject property x Affidavit of Legal Interest signed & notarized by the property owner (If owner is a corporation, submit a copy of the Articles of Incorporation or other evidence to show that the person signing is an authorized agent.) x Scaled vicinity map showing the location of the subiect property x Provide concept plan (Roads, access points, parking, general layout of buildings and building elevations.) x Pre-application meeting notes (All applications that require a public hearing are required to conduct a pre- application meeting with the Planning Department.) ,,/ x Neighborhood meeting sign-in sheet (Applicants are required to hold a neighborhood meeting to provide an oppomrnity for public review of the proposed project prior to the submittal of an application.) x Commitment of Property Posting form signed by the applicant/agent x Fee (Please call Planning Department to calculate correct fee. Applications with incorrect fees will not be accepted.) Note: Only one copy of the above items need be submitted when submitting multiple applications Additional Requirements for Annexation/Rezone Applications: APPLICATIONS WILL NOT BE ACCEPTED UNLESS ALL APPLICABLE ITEMS ON THE CHECKLIST ARE SUBMITTED. 33 E. Broadway Avenue, Suite 210 o Meridian, Idaho 83642 Phone: (208) 884-5533 o Facsimile: (208) 888-6854 . Website: www.meridiancity.org (Rev. I 1/4/08) Applicant ({) Description Staff ({) n/a If this application is not accompanied by a plat, conditional use permit, or planned unit development application, submit a conceptual development plan and elevations for the property (also submit an electronic version of the plan(s) in pdf format on a disk with the file named with proiect name & plan type [i.e. conceptual development plan, elevationsl). P/n t t ,*tr l@Departmentrry, lrya Deve lopment Seryices a NI it*-aa"t ProjecUFile: Lead Agency: Site address: Commission Hearing: Commission Approval: Staff Approval Applicant: Representative: KM Engineering, LLP Kevin McCarthy, PE 9233 W State Street Boise, lD 83714 Staff Contact: Stacey Yarrington Phone: 387-6171 E-mail: svarrinoton@achdidaho.orq Tech Review: November 15,2012 A. Findinqs of Fact Tradewi nds/MPP-1 2-0 1 SIMAZ-I 2-01 2 This is an Annexation, Zoning and Preliminary Plat application to annex into Meridian City with an R-8 zone, consisting of 39 building lots and 3 common/other lots on 10.42 acres. The site is located on the southeast corner of E Victory Road and S Locust Grove Road, Meridian, ldaho. Meridian SE Corner E Victory Road & S Locust Grove Road December 12,2012 September XX,2012 SDN, LLC - Don Newell PO Box 1939 Eagle, lD 83616 ,l 2. Description of Application: This application is for Annexation into Meridian City with Zoning to an R-8, medium density zone and a Preliminary Plat consisting of 39 building lots and 3 common/other lots. The site is 10.42 acres, located on the southeast corner of E Victory Road and S Locust Grove Road, fvleridian, ldaho. Description of Adjacent Surrounding Area: Direction Land Use Zoning North Sageland Subdivision - Medium Density Residential R-8 South Rural-urban Transition (Ada County) RUT East Rural-urban Transition (Ada County) RUT West Rural-urban Transition (Ada County) RUT 1 DRAFTTradewinds/MPP-12-01S/MAZ-'t2-012 E 3. Site History: ACHD has not previously reviewed this site for a development application. 4. lmpact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. 5 Capital lmprovements Plan (ClP)/Five Year Work Plan (FYWP): Victory Road Bridge #296 is scheduled in the Five Year Work Plan to be widened and is currently an unfunded prorect. Victory Road is listed in the Capital lmprovements Plan to be widened to 3-lanes from Locust Grove Road to Eagle Road between 2017 and 2021 . Locust Grove Road is listed in the Capital lmprovements Plan to be widened to 3-lanes from Amity Road to Victory Road between 2o17and 2021. The intersection of Victory Road and Locust Grove Road is listed in the Capital lmprovements Plan to be widened to a dual lane roundabout with a southbound right turn bypass lane between 2017 and 2021 BConsideration Traffic Findinqs for 't. Trip Generation (if TIS not required): This development is estimated to generate 373 additional vehicle trips per day (0 existing); 39 additional vehicle trips per hour in the PM peak hour (0 existing), based on the Institute of Transportation Engineers Trip Generation Manual, 8th edition. 2. Condition of Area Roadways Traffic Count is based on Vehicles per hour (VPH) Roadway PM Peak Hour Traffic Count PM Peak Hour Level of Service Existing Plus Proiect Victory Road 432-feet lvlinor Arterial 403 Better than "D" Locust Grove Road 792leel [,4inor Arterial 675 Better than tr Better than .F" * Acceptable level of service for a two-lane minor arterial is "D" (550 VPH). 3. Average Daily Traffic Count (VDT) Average daily traftic counts are based on ACHD'9 most cunent traffic counts The average daily traffic count for Victory Road west of Eagle Road was 7,370 on 8/19/09. The average daily traffic count for Locust Grove Road south of Overland Road was 11,516 on 8/19/09. G. Findin s for Consideration Plans and Studies The South Meridian Transportation Plan (SMTP) is a long range planning tool used to identify future roadway, intersection, and corridor needs in the South Meridian Area. Providing a framework for future roadway improvements based on the land use designations. The plan was created in collaboration with the City of Meridian and was adopted by the ACHD Commission in September of 2009. 1 2 DRAFTTradewinds/MPP-12-015lMAZ-12-012 Frontage Functional Classification A capacity analysis was conducted to determine the arterial roadway needs in the year 2030. LOS E was used as the threshold for identifying needed improvements along principal arterial roadways while LOS D was used as the threshold for minor artenals, using the standards in ACHD's adopted ClP. COMPASS' peak hour forecasts were used as the basis for determining needs. Based on the travel demand, all principal artenals require s-lanes. All minor arterials require 3-lanes with the exception of Black Cat Road, Linder Road, and portions of Victory Road and Locust Grove Road. They either have demands that require 5- lane roadways or are being preserved for s-lanes. 2. Victory Road a. Existing Conditions: Victory Road is improved with 2-travel lanes, 26-feet of pavement and no curb, gutter or sidewalk abutting the site. There is 60-feet of right-of-way for Victory Road (2sjeet from centerline). The Victory Road/Locust Grove Road intersection was improved with a signal and left hand turn lanes in 2012. There is an existing drainage ditch adjacent to Victory Road abutting the site. b. Policy: Arterial Roadway Policy: Dishict Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the l\/aster Street Map and Livable Streets Design Guide. The developer or engineer should contact the District before starting any design. Street Section and Right-of-Way Width Policy: District Policies 7205.2.1 & 7205.5.2 state that the standard s-lane street section shall be 72-feet (back-of-curb to back-of-curb) within 96-feet of rightof-way. This width typically accommodates two travel lanes in each direction, a continuous center left{urn lane, and bike lanes on a minor arterial and a safety shoulder on a principal arterial. Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalks at least s-feet wide to be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. lileandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated righlof-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public rightof-way or wholly within an easement.). Frontage lmprovements Policy: District Policy 7205.2.1 states that the developer shall widen the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder adjacent to the entire site. Curb, gutter and additional pavement widening may be required (See Section 7205.5.5). ACHD Master Street Map: ACHD Policy Section 31 1 1 .1 requires the lvlaster Street lvlap ([ISM) guide the rightof-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Victory Road is designated in the MSM as a Residential Arterial with s-lanes and on-street bike lanes, a 7'l-foot street section within 97-feet of right-of-way. 3 DRAFT Tradewinds/IMPP-12-OlSllVtAZ-12-012 c. Applicant Proposal: The applicant is proposing to dedicate 46-feet of right.of-way at the site's east property line widening to ggjeet at the Victory/Locust Grove intersection. This includes right-of-way for the future roundabout. The applicant is not proposing any other improvements to Victory Road. d. Staff Comments/Recommendations: The applicant's proposal meets District Right-Of-Way Policy. The applicant's proposal does not meet District Sidewalk and Frontage lmprovements Policy, which requires the construction of a sidewalk along arterial streets. Staff is recommending a modiflcation of policy to require the applicant to provide 4 feet of additional pavement along Victory Road abutting the sile to total 17 feet of pavement from centerline, in lieu of sidewalk construction. The applicant should also provide a 3-foot wide gravel shoulder. Staffs recommendation is due to the proposed roundabout at the intersection of Victory Road and Locust Grove Road. Given the design constraints of the proposed roundabout, it is difficult to determrne the appropriate location for the sidewalk. The requirement for pavement widening will provide additional room for cyclists and pedestrians, while not requiring the applicant to construct a sidewalk that will most likely be removed and reconstructed, as part of ACHD's future roundabout project. Staff is also recommending that the applicant move the existing drainage ditch out of existing and proposed ACHD right-of-way. 3. Locust Grove Road a. Existing Conditions: Locust Grove Road is improved with 2-travel lanes, 26-feet of pavement, and no curb, gutter or sidewalk abuttjng the sile. There is so-feet of right-of-way for Locust Grove Road (2s-feet from centerline). The Victory Road/Locust Grove Road intersection was improved with a signal and left hand turn lanes in 2012. b. Policy: Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map and Livable Streets Design Guide. The developer or engineer should contact the District before starting any design. Street Section and Right-of-Way Width Policy: District Policies 7205.2.1 & 7205.5.2 state that the standard s-lane street section shall be 72-feet (back-of-curb to back-of-curb) within 96-feet of right-of-way. This width typically accommodates two travel lanes in each direction, a continuous center left{urn lane, and bike lanes on a minor arterial and a safety shoulder on a principal arterial. Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalks at least s-feet wide to be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. lvleandering sidewalks are discouraged. A permanent righlof-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public righlof-way or wholly within an easement.). 4 DRAFTTradewinds/lVlPP-12-015lMaZ-12-012 Frontage lmprovements Policy: District Policy 7205.2.1 states that the developer shall widen the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder adjacent to the entire site. Curb, gutter and additional pavement widening may be required (See Section 7205.5.5). ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street lvlap (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Locust Grove Road is designated in the MSM as a Residential Arterial with s-lanes and on-street bike lanes, a 71-foot street section within g7-feet of right-of-way. c. Applicant Proposal: The applicant is proposing to dedicate 46jeet of right-of-way starting at the site's south property line widening to gg-feet at the Victory/Locust Grove intersection. This includes right-of-way for the future roundabout. The applicant is not proposing any other improvements to Locust Grove Road. d. Staff Comments/Recommendations: The applicant's proposal meets District RighfOf-Way Policy. The applicant's proposal does not meet District Sidewalk and Frontage lmprovements Policy, which requires the construction of a sidewalk along arterial streets. Staff is recommending a modification of policy to require the applicant to provide 4 feet of additional pavement along Locust Grove Road abutting the site to total 17 feet of pavement from centerline, in lieu of sidewalk construction. The applicant should also provide a 3joot wide gravel shoulder. Staffs recommendation is due to the proposed roundabout at the intersection of Victory Road and Locust Grove Road. Given the design constraints of the proposed roundabout, it ts difficult to determine the appropriate location for the sidewalk. The requirement for pavement widening will provide additional room for cyclists and pedestrians, while not requiring the applicant to construct a sidewalk that will most likely be removed and reconstructed, as part of ACHD's future roundabout project. 4. lnternal Streets a. Existing Conditions: There are no existing public roadways within this site. b. Policy: Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for improvtng all local street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way widths for all local streets shall generally not be less than so-feet wide and that the standard street section shall be 36-feet (back-of-curb to back-of-curb). The District will consider the utilization of a street width less than 36-feet with written fire department approval. Standard Urban Local Street-36-foot to 33-foot Street Section and Right-of-way Policy: District Policy 7207 .5.2 states that the standard street section shall be 36-feet (back-of-curb to back-of-curb) for developments with any buildable lot that is less than 1 acre in size. This street section shall include curb, gutter, and minimum s-foot concrete sidewalks on both sides and shall typically be within so-feet of right-of-way. The District will also consider the utilization of a street width less than 36-feet with written fire department approval. Most often this width is a 33-foot street section (back-of-curb to back- of-curb) for developments with any buildable lot that is /ess lhan 1 acre in size. Continuation of Streets Policy: District Policy 7207.2.4 states that an existing street, or a street in an approved preliminary plat, which ends at a boundary of a proposed development shall be extended in that development. The e)dension shall include provisions for continuation of storm drainage facilities. Benefits of connectivity include but are not limited to the following: 5 DRAFTTradewindsiMPP-12-015|MAZ-12-012 . Reduces vehicle miles traveled. . lncreases pedestrian and bicycle connectivity. . lncreases access for emergency services. . Reduces need for additional access points to the arterial street system . Promotes the efficient delivery of services including trash, mail and deliveries. o Promotes appropriate intra-neighborhood traffic circulation to schools, parks, neighborhood commercial centers, transit stops, etc. . Promotes orderly development. Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete stdewalk is required on both sides of all local street, except those in rural developments with net densities of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot frontage, in which case a sidewalk shall be constructed along one side of the street. Some local jurisdictions may require wider sidewalks. The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least 8-feet wide between the back-of-curb and the street edge of the sidewalk is recommended to provide increased safety and protection of pedestrians and to allow for the planting of trees in accordance with the District's Tree Planting Policy. If no trees are to be planted in the parkway strip, the applicant may submit a request to the District, with iustification, to reduce the width of the parkway strip. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated rightof-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge ofthe sidewalk. Sidewalks shall either be located wholly within the public righlof-way or wholly within an easement.). c. Applicant's Proposal: The applicant is proposing to construct the internal streets as 33-foot street sections (back of curb to back of curb) with rolled curb, gutter, 8-foot planter strip and 5- foot detached sidewalks, within 5o-feet of righlof-way. d. Staff Comments/Recommendations: The applicant's proposal meets District policy, and should be approved, as proposed. The applicant should be required to provide written Fire Department approval for use of a street section less than 36-feet in width. 5. Roadway Offsets a. Existing Conditions: There are no existing roadway offsets internal to the site. b. Policy: Local Street lntersection Spacing on Minor Arterials: District policy 7205.4.3 states that new local streets should not typically intersect arterials. Local streets should typically intersect collectors. lf it is necessary, as determined by ACHD, for a local street to intersect an arterial, the minimum allowable offset shall be 660-feet as measured from all other existing roadways as identified in Table'la (7205.4.6). c. Applicant's Proposal: The applicant is proposing a roadway offset 767-feet (measured centerline-to-centerline) onto Locust Grove Road abutting the site. d. Staff Comments/Recommendations: The applicant's proposal meets District Policy. Staff recommends approval of the applicant's proposal as there is no frontage on a collector street. 6. Stub Streets a, Existing Conditions: There are no stub streets to or from the site. 5 DRAFTTradewinds/lr/PP-12-01'|MAZ-12-012 b. Policy: Stub Street Policy: District policy 7207.2.4 (local) states that stub streets will be required to provide circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7207.2.5.4 (local), except a temporary cul-de-sac will not be requrred if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED lN THE FUTURE.' ln addition, stub streets must meet the following conditions: o A stub street shall be designed to slope towards the nearest street intersectron within the proposed development and drain surface water towards that intersection; unless an alternative storm drain system is approved by the District. . The District may require appropriate covenants guaranteeing that the stub street will remain free of obstructions. c. Applicant Proposal: The applicant is proposing to construct one stub street to the east, Fathom Drive, located 225-feet south of Victory Road (measured centerline-to-centerline). Fathom Drive is proposed to be, '1so-feet long. d. Staff Comments/Recommendations: The applicant's proposal meets District Policy, and should be approved, as proposed. The applicant should be required to install a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED lN THE FUTURE." 7. Tree Planters Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class ll trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class lll trees may be allowed in planters with a minimum width of 1O-feet. 8. Landscaping Landscaping Policy: A license agreement is required for all landscaprng proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 1o-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 4o-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersectron and a so-foot offset from stop signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 9. Other Access Victory Road and Locust Grove Road are classified as minor arterials roadways. Other than the access specifically approved with this application, direct lot access is prohibited to these roadways and should be noted on the final plat. D. Site Specific Conditions of Approval. Dedicate 46-feet of righfof-way at the site's east property line widening to gg-feet at the Victory/Locust Grove intersection. The righlof-way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The District will purchase the righlof-way which is in addition to existing right-of-way from available Corridor Preservation Funds. 1 7 DRAFTTradewinds/MPP-12-01'|MAZ-12-012 2. Provide 4-feet of additional pavement along Victory Road abutting the site to total 17 feet of pavement from centerline and a 3-foot wide gravel shoulder adjacent to the entire site on Victory Road. Move the existing drainage ditch out of existing and proposed ACHD right-of-way. Dedicate 46-feet of right-of-way at the site's south property line widening to gg-feet at the Victory/Locust Grove intersection. The right-of-way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The District will purchase the right-of-way which is in addition to existing right-of-way from available Corridor Preservation Funds. Provide 4-feet of additional pavement along Locust Grove Road abutting the site to total 17 feet of pavement from centerline and a 3-foot wide gravel shoulder adjacent to the entire site on Locust Grove Road. Construct the internal streets as 33-foot street sections (back of curb to back of curb) with rolled curb, gutter, 8-foot planter strip and s-foot detached sidewalks, within so-feet of right-of-way. Provide written Fire Department approval for use of a street section less than 36-feet in width. lnstall a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED lN THE FUTURE.' Payment of impacts fees are due prior to issuance of a building permit. Comply with all Standard Conditions of Approval. Standard Conditions of Approval Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way. Private sewer or water systems are prohibited from being located within the ACHD right-of- way. ln accordance with District policy, 7203.3, the applicant may be required to update any existing non-compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements The aoplicant's enoineer should provide documentation of ADA compliance to District Development Review staff for revtew 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD righlof-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-81 1-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 3. 4. 5 6 7 I 9 E 10. 1 2 3 8 DRAFTTradewinds/MPP-'12-O15|MAZ-12-012 1 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of ldaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. '12. lf the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval In place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. F, Conclusaons of Law The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. Attachments Vicinity Map Site Plan Utility Coordinating Council Development Process Checklist Request for Reconsideration Gurdelines 2 G 1 2 3 4 5 9 DRAFTTradewinds/MPP-12-O15|MAZ-12-012 VICINITY MAP 10 DRAFTTradewinds/MPP-12-015lMM-12-012 I :{ i% 'ti.:.-. et ffii , V SITE PLAN I TE FIE 9:E 5iE gEE 6f;= r9 !6 1 ffii'iitD I I I Ecr Eii nl 3 iEE iII a:I:I t tl +t +tr ilt i!! !:! ':l:t l! !i" il!g I I I lit :TI EIE s!i lir r:t !tl ,[{ ("- !i$l'ffiti$p ilr'Fffii'Fl T -t ltfiil rrlitl ----'1----\. -- --r- 3 Pr .3; -E=E HcEH s-:= E trTmE '== *vt Hs z liiF iill fi!l ilfl ,i!l t{fifftTIfi !.tl ll i io I I Ada County Utility Coordinating Council Developer/Local lm provement District Right of Way lmprovements Guideline Request Purpose: To develop the necessary avenue for proper notification to utilities of local highway and road improvements, to help the utilities in budgeting and to clarify the already existing process. 1) Notification: Within five (5) working days upon notification of required right of way improvements by Highway entities, developers shall provide written notification to the affected utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to, project limits, scope of roadway improvements/project, anticipated construction dates, and any portions critical to the right of way improvements and coordination of utilities. 2) Plan Review: The developer shall provide the highway entities and all utility owners with preliminary project plans and schedule a plan review conference. Depending on the scale of utility improvements, a plan review conference may not be necessary, as determined by the utility owners. Conference notification shall also be sent to the UCC. During the review meeting the developer shall notify utilities of the status of right of way/easement acquisition necessary for their project. At the plan review conference each company shall have the right to appeal, adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter of review indicating the costs and time required for relocation of its facilities. Said letter of review is to be provided within thirty calendar days after the date of the plan review conference. 4) Final Notification: The developer will provide highway entities, utility owners and the UCC with final notification of its intent to proceed with right of way improvements and include the anticipated date work will commence. This notification shall indicate that the work to be performed shall be pursuant to final approved plans by the highway entity. The developer shall schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity shall be completed within the times established during the preconstruction meeting, unless otherwise agreed upon. Notification to the Ada County UCC can be sent fo: 50 S. Cole Rd. Boise 83707, or Visit iducc.com for e-mail notification information. 12 DRAFT Tradewinds/MPP-12-015iMM-12-012 3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans. Utilities may request an updated plan review meeting if revisions are made in the preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days after receiving the revisions to review and comment thereon. Develo ment Process Checklist XSubmit a development application to a City or to Ada County SThe City or the County will transmit the development application to ACHD XThe ACHD Planning Review Section will receive the development application to review XThe Planning Review Section will do 9!C of the following: XSend a "No Review" letter to the applicant stating that there are no site specific conditions of approval at this time. Xwrite a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Xwrite a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Items to be completed bv ADDlicant: EFor ALL development applications, including those receiving a "No Review" letter: . The applicant should submit one set oi engineered plans directly to ACHD for review by the Development Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architeclural plans may be submitted for purposes of impact fee assessment.) . The applicant is required to get a permit from Construction Services (ACHD) for ANI: work in the right-of- way, including, but not limited to, driveway approaches, street improvements and utility cuts. EPay lmpact Fees prior to issuance of building permit. lmpact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Co n structi o n (N on - S u b di vi sion s) E Driveway or Property Approach(s) . Submit a "Driveway Approach Request'form to ACHD Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. E Working in the ACHD Right-of-Way . Four business days prior to startjng work have a bonded contractor submit a "Temporary Highway Use Permit Application" to ACHD Construction - Permits along a) b)Plan Tratfic An Erosion Control & Sediment Control Narrative wath: & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Co n structio n ( S ub div i s i on s) E Sediment & Erosion Submittal . At least one week prior to setting up a Pre-Construction Meeting an Erosion & Sediment Control Narrative & Plan, done by a Certified Plan Designer, must be tumed into ACHD Construction to be reviewed and approved by the ACHD Stormwater Section. E ldaho Power Company . Vic Steelman at ldaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. D Final Approval from Development Services is required prior to scheduling a pre-Con. 13 DRAFTTradewinds/MPP-12-015/MAZ-12-012 Items Completed to Date: 1 Request for Appeal of Staff Decision Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary of Highway Systems, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The ROWDS lvlanager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the ROWDS Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. Action by Commission: Following the hearing, the Commission shall either affirm oT reverse, jn whole or part, or otherwise modify, amend or supplement the decision being appealedr as such action is adequately supported by the law and evidence presented at the hearing. a e 14 DRAFT Tradewinds/MPP-'12-01s/MAZ-12-0i2 Request for Reconsideration of Commission Action Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD staff or any other person objecting to any final action taken by the Commission may request reconsideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. lf a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d. lf a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originally. lt will normally be returned to ACHD staff for further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACHD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commissjon deems advisable. f. lf a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission. a '15 DRAFTTradewinds/MPP-12-015/MM-12-012 1. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 3:00 p.m. on the day prior to the Commission's nelit scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shail cause the same to be placed on the agenda for that next scheduled regular Commission meeting. TO ATTN ADDRESS RE City of Meridian Sonya Watters 33 East Broadway Avenue Meridian, lD 83642 Tradewinds Subdivision DATE: JOB #: FROM: TRANSMITTAL LO/24/2OL2 t2-o72 Kevin McCarthy, P.E. ENGINEERING Please find attached Transmitted By COPIES DATE PAGES DESCRIPTION 13 LO.24.L2 5 Revised Preliminary Plat, Conceptual Engineering Plans, & Landscape Plan L 1o.24.L2 L 8.5 x 11 Exhlbit Depicting Common Driveway Lot lnformation L LO.24.t2 Disc Containing Electronic Documents I Hand Delivery I submittat Exchange Transmittal Purpose E wait ! electronic Transfer ! rax fleict<-up ! ror Your Use I As Requested Remarks I ror Review & Approval I other: ! for Signature CC Signed: Kevin McCarthy, P.E., Principal Engineer lf enclosures are not as indicated, please notify us as soon as possible. 9233WESTSTATESTREET I BOISE, \D83774 I 208.639.6939 I FAX208.639.6930 | www.kmengltp.com Item #9C, D: Tradewinds Subdivision llz-12-012t Pp.12.015) Application(s): > ;Zoning Preliminary Annexation Plat & Size of property, existing zoning, and location: This site consists of '10.42 acres, is currenlly zoned RUT in Ada County, and is located on the SEC of S. Locust Grove Road & E. Victory Road. Summary of Request: The applicant requests annexation & zoning approval of '10.42 acres of land with an R-8 zoning district. The proposed zoning is consistent with the FLUM designation of MDR for this site which anticipates residential densities between 3 and 8 d.u./acre. The proposed density of 3.74 d.u./acre is consistent with the MDR designation. A preliminary plat is also proposed that consists of 39 building lots for single{amily detached residential homes & 3 common area lots. The plat is proposed to develop in 2 phases. Access to the site if proposed via S, Locust Grove Road; A stub street is shown at the east boundary for future extension. Open space & site amenities are proposed on the site in accord with UDC standards. '10.3% open space is proposed consisting of open space, parkways, & street buffers along Victory & Locust Grove, A % basketball court is proposed as an amenity, The applicant has also agreed to construct a pathway connection from Fathom Drive to Victory Road across Lot 16, Block 1. Conceptual building elevations for the residential homes were submitted. To ensure the site develops as proposed, staff is recommending a development agreement as a provision of annexation. The DA includes a provision for future development to comply with the preliminary plat, landscape plan, and conceptual building elevations submitted with this application. The Commission recommended a provision be added to the DA for cross-access to be provided to the property to the south owned by the City where the future water tank is proposed to reduce access points via Locust Grove Road, an arterial street, as required by UDC 11-3A-3. Commission Recommendation: Approval Summary of Commission Public Hearing: r. ln favor: Kevin McCarthy ii. ln opposition: None iii. Commenting: None iv. Written testimony: Kristen Thompson, Kevin lVcCarthy Key lssue(ii i. s) The The of Discussion timing allowance for construction for by asphalt Commission:(a-ofthe s alemporary sidewalks material) along Locust instead Grove ofconcrete & Victory iidewalks Roads; along Victory & Locust Grove Roads where the intersection improvements are planned. Key Commission Change(s) to Staff Recommendation: t staff requested that a conditron of approval be added that requires cross-access be provided to the property-owned by the City to the south (see Exhibit B, conditions #1.1.1b and 1 .2.8j. ln lieu of a concrete sidewalk along victory & Locust Grove Roads in the area where the intersection improrrements are pranned, the commission agreed that asphart is an acceptabre temporary materiar (see Exhibit B, condition #1.3.6). At staffs request & the appricant's agreement, add a condition requrring a pathway to be conshucted from Fathom-Drive to Victory Road across Lot 16, Brock 'r Outstanding lssue(s) for City Council: None Written Testimony since Commission Hearing: None Notes ( t- 6cr^r,lq-rn.- Lar"t^Aa- e- dLo k-ble t C r tt 2f aLC c-c It oq't dr.. ,n./,Ll 'h TrottS't -11^- o, a- ro v t',/u' a,t ots t'tt.> 04 q.Cc?rt A, H.. o, L /bc<-l 4 Co"--,|'r off hL""| cIo'? t) +_f ,cL-,1 /o,o( aJ City of Meridian Development Review Agency Comments Meeting Date: Date of List: sJr., I st Planner: Project Name: -fra.l,p,^r;"J r Fire sentative Notes: A B C D 1 2 3 4 5 6 7 8 o) 10 11 12 6- ,14 15 16 t7 19 20 21 23 24 25 26 27 28 29 30 31 32 33 J+ 35 36 tt 38 39 41 42, 43 44 45 46 47 48 49 Notes: tative: A B D E 7l 72 73 74 76 77 78 Sani Notes: Services entative: A B 1 2 3 Parks tative: 6 46 47 79 80 8l 82 83 84 85 Notes: A, Public Works sentative: Notes: 1 2 3 4 5 6 8 9 10 11 t2 13 15 l6 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Rev. 6/6/ I 2 18 22 40 fI m ---t-t IT Lft Police C 75 m m Ir r C 97 98 7 14 ---t-t [T_l Sonya Watters Sent: bject: To Cc Su From Kevin, Please see the email bellow Thank you Scott Steckline Scott Steckline Wednesday, November 14,2012 9:45 AM kevin@kmengllp.com Sonya Watters FW: Tradewinds Sub AZ; PP Staff Report for 11115 P&Z Mtg From: Kyle Radek Sent: Friday, November 09,207210:14 AM To: Scott Steckline Subject: RE: Tradewinds Sub AZ; PP Staff Report for 11/15 P&Z Mtg Scott, The City can pay for the upsizing Kyle Radek, PE, CFM Assistant City Engineer Meridian Public Works From: Scott Steckline Sent: Friday, November 09, 2072 9:30 AM To: Kyle Radek Subject: FW: Tradewinds Sub AZ; PP Staff Report for 11/15 P&Z Mtg Kyle, Please read the emailbellow. Willthe city be paying forthe upsizing of the water line orwill it be the responsibility of the developer. This is for the new development north of our new water tank Victory and Locust grove. Scott From: Sonya Watters Sent: Thursday, November 08, 20t2 4:33 PM To: Kevin McCarthy Cc: 'Don Newell'; 'Kirsti Allphin'; Scott Steckline Subject: RE: Tradewinds Sub M; pp Staff Report for 11/15 p&Z Mtg Kevin, lhave no idea what the reason is...l'tI forward your emaiI to Scott Stecktine for his response. Thanks Sonya 1 Fr6m: Kevin McCarthy tmailto:kevin@kmeng l Sent: Thursday, November 08, 20122:33 PM To: Sonya Watters; Machelle Hill; Jacy Jones; Jaycee Holman Cc: 'Don Newell'; 'KirstiAllphin' Subject: RE: Tradewinds Sub M; PP Staff Report for 11/15 P&Z Mtg Sonya, At this point we have one question. ln the Public Works Department Section item 2.2 it says - "...The opplicont sholl be responsible to upsize the woter moin to twelve inch from Coastline Drive, Starboard St and Fathom Dr to Victory Rood...". l'm assuming our development would only need an 8" line and the need for this is associated with the tank planned on the adjacent property, so will the City be paying for the material cost associated with upsizing the pipe from 8" to 12"? Thanks, Kevin McCarthy 208.639.6939 From : Sonya Watters [mailto : swatters@meridiancitv.org] Sent: Wednesday, November 07, 2012 B:57 AM To: Machelle Hill; Jacy Jones; Jaycee Holman Cc: Kevin McCadhy Subject: Tradewinds Sub AZ; PP Staff Report for 11/15 P&Z Mtg Attached is the staff report for the proposed Annexation & Zoning and Pretiminary Ptat for Tradewinds Subdivision. This item is scheduted to be on the Commission agenda on November 15th. The pubtic hearing witt be hetd at City Ha[t, 33 E. Broadway Avenue, beginning at 7:00 pm. Ptease catl or e-mail with any questions. Kevin - Ptease submit any written response you may have to the staff report to the City Cterk's office (ihotman@meridiancitv.ore, mhitl@meridiancitv.ore, and iiones@meridiancitv.ors) and mysetf (e-maiI or fax) as soon as possibte. Thanks, s)wua watlteYs Associate City Planner CITY OF MERIDIAN Community Development Department 33 E. Broadway Avenue, Ste. I 02 Meridian, lD 83642 208-884-5533 phone / 208-888-6854 fax 2 Sonya Watters From: Sent: To: Subject: Mindy Wallace IMwallace@achdidaho.org] Tuesday, October 23,2012 10:31 AM Sonya Watters RE: Roundabout - Victory and Locust Grove ACHD will construct sidewalks as part of our intersection project. From : Sonya Watters I ma ilto : swatters@ merid ia ncity. org] Sent: Tuesday, October 23,2012 10:06 AM To: Mindy Wallace Subject: RE: Roundabout - Victory and Locust Grove So am I understanding you right, ACHD witl not be constructing sidewalks with the RAB project adjacent to the RAB? From : Mindy Wallace Imailto: Mwallace@achdidaho.org] Sent: Tuesday, October 23,2072 B:37 AM To: Kevin McCarthy Cc: Sonya Watters Subject: RE: Roundabout - Victory and Locust Grove Kevin, TheRABisscheduledtobeinstalledbetween2OlTand202l. ThisinformationcanbefoundonACHD'swebsite. ACHD will recommend pavement widening in lieu of sidewalks within the influence area of the RAB when one is planned to be constructed. The lead agency can always be more restrictive and require the construction of sidewalks. Mindy Mindy Wallace Planning Review Supervisor Ada County Highway District (208) 387-6178 "We drive quality transportation for allAda County -- Anytime...Anywhere!" From : Kevin McCarthy [ma ilto: kevin @kmengllp.com] Sent: Monday, October 22,2072 5:11 PM To: Mindy Wallace Cc:'Don Newell' Subject: RE: Roundabout - Victory and Locust Grove Mindy, We turned in our preliminary plat to the City of Meridian for our project at Victory and Locust Grove. I left you a phone message about it while you were out last week. The City had the following comment: 1 ' . Detached sidewatks are required to be provided atong Victory & Locust Grove within a pubtic use easement from the point where ACHD's improvements associated with the intersection end. Find out when the roundabout is going to be constructed. ln our conversation over a month ago you indicated ACHD would not be in favor of installing sidewalk along and Victory and Locust Grove, since it would need to be removed to construct the roundabout. Based on this comment I don't think the City has an issue with that, but would like to see us install the sidewalk from where your improvements would end. Do you know where that would be? Also, do you know when the roundabout is planned at this intersection? Thanks for your help on this one. Please give me a call ifyouhaveanyquestions. Kevin Mccarthy 208.639.6939 2 Barbara Shiffer From: Sent: Subject Machelle Hill Thursday, October 25, 2012 1'l :32 AM FW: City of Meridian Dev App - Tradewinds Subdivision AZPP From: Machelle Hill Sent: Thursday, October 25,20L2 11:31 AM Subject: City of Meridian Dev App - Tradewinds Subdivision M PP i IDAHS City of Meridian City Clerk's Office 33 E. Broadway Avenue Meridian,ID 83642 Planning und Zoning Commission Developmenl Application Transmittal To: Cifv Departments Comments due by: November 8,2012 Transmittal Date: October 25, 2012 File No.: AZt2-012 &PP t2-015 Hearing Date: November 15,2012 Request: Public Hearing - Annexation and Zoning of 10.42 acres of land to the R-8 zoning district AND Preliminary Plat approval consisting of 39 building lots and 3 common/other lots on 9.11 acres of land in a proposed R-8 zoning district for Tradewinds Subdivision By: SDN, LLC Location of Properfy or Project: Southeast corner of E. Victory Road and S. Locust Grove Road The City of Meridian is requesting comments and recommendations on the application referenced above. To review detailed information about the request, please click on the file number above to take you directly to the application. We request that you submit your comments or recommendations by date specified above. When responding, please reference the file number of the project. lf responding by email, please send comments to clerk@meridianciiy.orq. For additional information associated with this application please contact City Clerk's Office at number below. Thank you, Machelle Hill Meridian City Clerk's Office 33 E. Broadway Avenue Meridian, lD 83642 (208)8884433 m h ill@meridiancitv. oro 1 lsee rihioit"e, conditio; #1.2.9). feo1119 atl,9t1ne-sidewark arong Locust Grove & Victory Roads to oe constructed (condition #1.2.10). with phase 1 L lt. I II i I I ri t lo" ,A iiii li. r{! t t FIE lt fr ir ll I t .p{.&e '-=:>--r !iEs L J l r---- ---- -J i!!: 't I _l -J --l I I T-----1 i ;!!: i I J I i-ry1i t ;:! ! LI I I J iEEr T I I L T I I FEEC I I -J I ;:!: I L- l Iri !it-- E!! I ) 11 DRAFTTradewinds/MPP-12-015IMAZ-12-012 I I I I I I I :=.#-4. T-,-"- -l , !tR! -- .l I I cr"' &l., .l --::--r ______ Better than "D" ) Residential subdivision trees > A@onopenspace ) Number of trees provided on common lot(s) a a a x a Proposed common area lots and/or landscape easements