A-1.0 TVR HEATING AND COOLINGC. USE AND OCCUPANCY CLASSIFICATION (IBC CHAPTER 3):
2009 ICC/ANSI A117.1
2015 INTERNATIONAL BUILDING CODE
THE BUILDING DESIGN IS DONE WITH REFERENCE TO THE
1. II-B
FOLLOWING CODES:
B. ZONING:
3.
2.
1.
A.
G. EXITING AND EGRESS
D. TYPE OF CONSTRUCTION (IBC CHAPTER 6):
1. I-L - LIGHT INDUSTRIAL
E. BUILDING AREA: 3,600 S.F.
4. 2017 NATIONAL ELECTRICAL CODE
5. 2015 INTERNATIONAL FIRE CODE
6. 2012 INTERNATIONAL MECHANICAL CODE AND APPENDIX A
7. 2012 INTERNATIONAL FUEL GAS CODE AND APPENDICES A,B,C AND D
2017 IDAHO STATE PLUMBING COE
8.
F. OCCUPANT LOAD
1. ONE (1) EXIT REQUIRED - UNDER 49 OCCUPANTS AND MAX. TRAVEL
DISTANCE LESS THAN 75 FT.
1. WAREHOUSE - 3600 S.F. / 500 S.F. = 8
(DESIGNED AS A DARK / COLD SHELL - WILL BE UNOCCUPIED)
1. S-2 LOW HAZARD STORAGE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
CODE INFORMATION
NORTH
MERIDIAN, ID
PROJECT SITE
VICINITY MAP
LANARK ST.
N. NOLA RD.
NEW
STORAGE
BUILDING
200' - 0"
ALIGN WITH EXISTING BUILDING
Parcel: R5302770010
Total Acres: 2.02
Lot 2 Blk 1 of the Locust
Grove Industrial Park
EXISTING
BUILDING
SITE OBSCURING
SECURITY FENCE
EACH SIDE
B F
1
4
E. LANARK STREET
22' - 0" 60' - 0"
200.03 FT.
200.00 FT.
440.99 FT.
445.93 FT.
60' - 0"
DRAINAGE EASEMENT
130' - 0"
RAILROAD EASEMENT
80' - 0"
DRAINAGE EASEMENT
50' - 0"
DRAINAGE EASEMENT
EXISTING PAVED
PARKING - NO
CHANGE
EXISTING PAVED
YARD
EXISTING DRAINAGE SWALE
60' - 0"
60' - 0"
PRE-ENGINEERED METAL BUILDING
DARK / COLD SHELL
FOR STORAGE OF HVAC INVENTORY
4" CONCRETE SLAB PER
STRUCTURAL - NO VAPOR BARRIER
PER GENERAL NOTE THIS SHEET
3'-0" x 7'-0" H.M. DOOR
AND FRAME
PRE-ENGINEERED METAL BUILDING
A B F G
17' - 6" 25' - 0" 17' - 6"
1
2
3
4
20' - 0" 20' - 0" 20' - 0"
C E
21' - 0" 18' - 0" 21' - 0"
12X12
O.H DOOR
12X12
O.H DOOR
4.
3.
2.
1. ALL CONSTRUCTION, MATERIALS AND FINISHES SHALL BE IN
FULL COMPLIANCE WITH APPLICABLE GOVERNING CODES AND
REGULATIONS.
THE CONTRACTOR HAS AGREED TO BUILD THE BUILDING IN
ACCORDANCE WITH THE DOCUMENTS. SUBSTITUTION OF SPECIFIED
MATERIALS WILL NOT BE CONSIDERED WITHOUT CONCURRENCE OF
THE ARCHITECT OR ENGINEER.
ALL DIMENSIONS ARE TO FACE OF FRAMING UNLESS NOTED OTHERWISE
BUILDING AND STRUCTURE DESIGNED AND ENGINEERED BY OTHERS.
GENERAL NOTES
5. NO VAPOR BARRIER IS REQUIRED UNDER THE CONCRETE FLOOR SLAB
DUE TO GROUND WATER LEVELS AT 10 FT. DEEP AND IBC SECTION
1907.1 EXCEPTION 3 - ANY MOISTURE THROUGH THE SLAB FROM
BELOW WILL NOT BE DETRIMENTAL TO THE INTENDED OCCUPANCY OF
THE BUILDING
A C E G
1
12
15' - 0"
G F B A
1
12 METAL SIDING
1 4
METAL ROOFING
TRANSPARENT WALL PANEL
METAL SIDING
OVERHEAD DOOR
METAL DOOR & FRAME - PAINT
4 1
METAL ROOFING
TRANSPARENT WALL PANEL
METAL SIDING
DRAWING INDEX
A-1.0 PROJECT COVER / SITE PLAN / FLOOR PLAN / ELEVATIONS
1 SITE 1" = 30'-PLAN 0"
N ORTH
J. GREGORY TOOLSON
STATE OF IDAHO
LICENSED
ARCHITECT
AR-1657
REVISIONS:
SHEET
OF
FOR
DRAWN BY:DATE:
CHECKED: JOB NO.:
STAMP
1212 12th Avenue South
Nampa, Idaho 83651
Phone: 208-463-9295
www.jgt-architecture.com
JGT 1888
JGT 12/19/18
TVR HEATING AND COOLING
STORAGE BUILDING
1900 LANARK ST. - MERIDIAN, ID
PROJECT COVER /
SITE PLAN / FLOOR
PLAN
A-1.0
1 1
12/19/18
2 FLOOR 3/32" = 1'-0" PLAN
N ORTH
4 SOUTH 3/32" = 1'-0" ELEVATION
5 NORTH 3/32" = 1'-0" ELEVATION
7 EAST 3/32" = 1'-ELEVATION 0"
6 WEST 3/32" = 1'-0" ELEVATION
METAL SIDING