Loading...
A-1.0 TVR HEATING AND COOLINGC. USE AND OCCUPANCY CLASSIFICATION (IBC CHAPTER 3): 2009 ICC/ANSI A117.1 2015 INTERNATIONAL BUILDING CODE THE BUILDING DESIGN IS DONE WITH REFERENCE TO THE 1. II-B FOLLOWING CODES: B. ZONING: 3. 2. 1. A. G. EXITING AND EGRESS D. TYPE OF CONSTRUCTION (IBC CHAPTER 6): 1. I-L - LIGHT INDUSTRIAL E. BUILDING AREA: 3,600 S.F. 4. 2017 NATIONAL ELECTRICAL CODE 5. 2015 INTERNATIONAL FIRE CODE 6. 2012 INTERNATIONAL MECHANICAL CODE AND APPENDIX A 7. 2012 INTERNATIONAL FUEL GAS CODE AND APPENDICES A,B,C AND D 2017 IDAHO STATE PLUMBING COE 8. F. OCCUPANT LOAD 1. ONE (1) EXIT REQUIRED - UNDER 49 OCCUPANTS AND MAX. TRAVEL DISTANCE LESS THAN 75 FT. 1. WAREHOUSE - 3600 S.F. / 500 S.F. = 8 (DESIGNED AS A DARK / COLD SHELL - WILL BE UNOCCUPIED) 1. S-2 LOW HAZARD STORAGE 2015 INTERNATIONAL ENERGY CONSERVATION CODE CODE INFORMATION NORTH MERIDIAN, ID PROJECT SITE VICINITY MAP LANARK ST. N. NOLA RD. NEW STORAGE BUILDING 200' - 0" ALIGN WITH EXISTING BUILDING Parcel: R5302770010 Total Acres: 2.02 Lot 2 Blk 1 of the Locust Grove Industrial Park EXISTING BUILDING SITE OBSCURING SECURITY FENCE EACH SIDE B F 1 4 E. LANARK STREET 22' - 0" 60' - 0" 200.03 FT. 200.00 FT. 440.99 FT. 445.93 FT. 60' - 0" DRAINAGE EASEMENT 130' - 0" RAILROAD EASEMENT 80' - 0" DRAINAGE EASEMENT 50' - 0" DRAINAGE EASEMENT EXISTING PAVED PARKING - NO CHANGE EXISTING PAVED YARD EXISTING DRAINAGE SWALE 60' - 0" 60' - 0" PRE-ENGINEERED METAL BUILDING DARK / COLD SHELL FOR STORAGE OF HVAC INVENTORY 4" CONCRETE SLAB PER STRUCTURAL - NO VAPOR BARRIER PER GENERAL NOTE THIS SHEET 3'-0" x 7'-0" H.M. DOOR AND FRAME PRE-ENGINEERED METAL BUILDING A B F G 17' - 6" 25' - 0" 17' - 6" 1 2 3 4 20' - 0" 20' - 0" 20' - 0" C E 21' - 0" 18' - 0" 21' - 0" 12X12 O.H DOOR 12X12 O.H DOOR 4. 3. 2. 1. ALL CONSTRUCTION, MATERIALS AND FINISHES SHALL BE IN FULL COMPLIANCE WITH APPLICABLE GOVERNING CODES AND REGULATIONS. THE CONTRACTOR HAS AGREED TO BUILD THE BUILDING IN ACCORDANCE WITH THE DOCUMENTS. SUBSTITUTION OF SPECIFIED MATERIALS WILL NOT BE CONSIDERED WITHOUT CONCURRENCE OF THE ARCHITECT OR ENGINEER. ALL DIMENSIONS ARE TO FACE OF FRAMING UNLESS NOTED OTHERWISE BUILDING AND STRUCTURE DESIGNED AND ENGINEERED BY OTHERS. GENERAL NOTES 5. NO VAPOR BARRIER IS REQUIRED UNDER THE CONCRETE FLOOR SLAB DUE TO GROUND WATER LEVELS AT 10 FT. DEEP AND IBC SECTION 1907.1 EXCEPTION 3 - ANY MOISTURE THROUGH THE SLAB FROM BELOW WILL NOT BE DETRIMENTAL TO THE INTENDED OCCUPANCY OF THE BUILDING A C E G 1 12 15' - 0" G F B A 1 12 METAL SIDING 1 4 METAL ROOFING TRANSPARENT WALL PANEL METAL SIDING OVERHEAD DOOR METAL DOOR & FRAME - PAINT 4 1 METAL ROOFING TRANSPARENT WALL PANEL METAL SIDING DRAWING INDEX A-1.0 PROJECT COVER / SITE PLAN / FLOOR PLAN / ELEVATIONS 1 SITE 1" = 30'-PLAN 0" N ORTH J. GREGORY TOOLSON STATE OF IDAHO LICENSED ARCHITECT AR-1657 REVISIONS: SHEET OF FOR DRAWN BY:DATE: CHECKED: JOB NO.: STAMP 1212 12th Avenue South Nampa, Idaho 83651 Phone: 208-463-9295 www.jgt-architecture.com JGT 1888 JGT 12/19/18 TVR HEATING AND COOLING STORAGE BUILDING 1900 LANARK ST. - MERIDIAN, ID PROJECT COVER / SITE PLAN / FLOOR PLAN A-1.0 1 1 12/19/18 2 FLOOR 3/32" = 1'-0" PLAN N ORTH 4 SOUTH 3/32" = 1'-0" ELEVATION 5 NORTH 3/32" = 1'-0" ELEVATION 7 EAST 3/32" = 1'-ELEVATION 0" 6 WEST 3/32" = 1'-0" ELEVATION METAL SIDING