Project Information
MERIDIAN HIGH SCHOOL
1900 WEST PINE AVENUE, MERIDIAN, ID 83642
OWNER: JOINT SCHOOL DISTRICT NO. 2
CONTACT: JOE YOCHUM
ADDRESS: 1303 E. CENTRAL DRIVE, MERIDIAN, IDAHO 83642
PHONE: (208) 855-4500
ZONING CODE
R-4
Overall Site Calculations
LOT SIZE
33.7 ACRES (1,467,972 SQ.FT.)
STANDARD VEHICULAR PARKING STALLS
NO NEW - EXISTING TO REMAIN.
REQUIRED STALLS: 746
EXISTING STALLS: 894
BICYCLE PARKING
NO NEW - EXISTING TO REMAIN
EXISTING BUILDING
341,220 SQ. FT. (GROSS)
PROPOSED BUILDING ADDITION
X X
IV
IV
IV
IV
IV
IV
IV
G
RD
RD
RD
RD
X X X X
X
X
X
X
X
X X X
X X X
X X X X X
X
X
X
X X X X X X X X X X X X
X X
X
X
X
X X X X X
PIRR
PIRR
PIRR PIRR
PIRR PIRR
PIRR
PIRR PIRR
PIRR
PIRR
PIRR PIRR PIRR
111' 130'
16'
17'
42'
38'
45'
10'
14' 6'
6' 38' 6'
6'
39'
6'
60'
12'
2'
10'
7'
38'
44'
31'
Project Information
MERIDIAN HIGH SCHOOL
1900 WEST PINE AVENUE, MERIDIAN, ID 83642
OWNER: JOINT SCHOOL DISTRICT NO. 2
CONTACT: JOE YOCHUM
ADDRESS: 1303 E. CENTRAL DRIVE, MERIDIAN, IDAHO 83642
PHONE: (208) 855-4500
1.
PROPOSED TREE MITIGATION AND BORDER TO PEDESTRIAN PATHWAY, 45
TREES, MIN. 2" CALIPER.
2. PROPOSED TREE MITIGATION AND BUFFER AT LINDER ROAD, 24 TREES,
MIN. 2" CALIPER.
3. PROJECT SITE - REFER TO L1.01 FOR LANDSCAPE PLAN.
4. APPROXIMATE CENTER LINE OF NINE MILE DRAIN
5.
APPROXIMATE PROPERTY LINE OF MERIDIAN HIGH SCHOOL (FENCE LINE)
6.
PROPOSED 14' PEDESTRIAN PATHWAY EASEMENT BOUNDARY
7.
APPROXIMATE BOUNDARY OF NAMPA-MERIDIAN IRRIGATION DISTRICT
EASEMENT
8.
VISION TRIANGLE PER MERIDIAN CITY CODE 11-3A-3
Keynotes CALLOUT NUMBERS COORDINATED
TO NUMBERED NOTES BELOW.
Sheet Notes:
A. NO EXISTING OPEN CANALS, CREEKS, DRAINS, PONDS, WETLANDS, FLOODPLAINS,
HIGH GROUNDWATER AREAS, OR ROCK OUTCROPPINGS EXIST WITHIN THE PROJECT
AREA. NINEMILE DRAIN IS AN OPEN CANAL ON THE NORTHERN PROPERTY
BOUNDARY BUT WILL NOT BE IMPACTED BY THE PROJECT. THE EIGHTMILE LATERAL
IS PIPED UNDERGROUND THROUGH THE SITE.
B. ALL STORMWATER FACILITIES WILL BE UNDERGROUND.
#
Project Calculations
PROJECT CALCULATIONS
· WIDTH OF STREET BUFFER: NA
LINEAR FEET OF STREET FRONTAGE: NA
NUMBER OF STREET TREES REQUIRED: NA
· RESIDENTIAL SUBDIVISION TREES: NA
· ACREAGE AND PERCENTAGE DEDICATED FOR COMMON OPEN N/SPACE: A
· ACREAGE AND PERCENTAGE DEDICATED FOR QUALIFIED OPEN N/SPACE: A
· NUMBER OF TREES PROVIDED ON COMMON 11 LOTS: (IN PROJECT AREA); 80
(OVERALL SITE)
· MITIGATION FOR REMOVAL OF TREES: 14 TREES WILL BE REMOVED. REFER TO
TREE REMOVAL EXHIBIT, THIS SHEET, FOR MORE INFORMATION.
SS
SD
SS
IBX
GRATE:2584.34'
IE(W)36"CONC:2577.07'
IE(E)36"CONC:2577.04'
SUMP:2577.04'
UGP
UGP
SS
SS
R/W R/W R/W R/W R/W R/W R/W
R/W
R/W R/W R/W R/W
PIRR
PIRR
PIRR
PIRR
PIRR PIRR
PIRR PIRR PIRR
4''W 4''W 4''W 4''W 4''W
4''W 4''W
4''W
PROPOSED
AUDITORIUM BUILDING
EXISTING
BUILDING
EXISTING BUILDING
EXISTING
BUILDING
(5)RG
CK (6)
PH (1)
SA (4)
CR (3)
SM (5)
SA (7)
SM (6)
(5)CK
(3)PL
(1)PH
(1)PH
SM (5)
(5)CK
(3)PL
PH (3)
(10)SA
(5)PL
(4)CI
(3)BN
(9)SM
(7)SA
(5)RG
(7)HO
(8)SA
SM (8)
HO (6)
(16)BH
HO (9)
SA (3)
MC (2)
PG (29)
PG (25)
PG (53)
(5)LG
BG (15)
(702)PG
(5)RG
1
1
1
1
2
2 2
JOB N0.:
CHECKED BY:
SHEET NO.
DRAWN BY:
DATE:
121 N. 9TH ST. SUITE 401
BOISE, IDAHO 83702
(208) 639-4520
AXIOM
STRUCTURAL ENGINEER
462 E. SHORE DR. SUITE 100
EAGLE, IDAHO 83616
(208) 939-4041
THE LAND GROUP
CIVIL ENGINEER
420 S. ORCHARD ST.
BOISE, IDAHO 83705
(208) 343-3663
CATOR, RUMA & ASSOCIATES, CO.
MECHANICAL ENGINEER
408 E. PARKCENTER BLVD. STE 215
BOISE, IDAHO 83301
(208) 345-7127
EIDAM AND ASSOCIATES
ELECTRICAL ENGINEER
CONSULTANTS:
462 E. SHORE DR. SUITE 100
EAGLE, IDAHO 83616
(208) 939-4041
THE LAND GROUP
LANDSCAPE ARCHITECT
PHASE:
COPYRIGHT All rights reserved. Reproduction or use in any form
or by any means -- graphic, electronic, mechanical, etc. -- without
written permission of LOMBARD CONRAD ARCHITECTS, P.A.
is unlawful and subject to criminal prosecution.
18011.01
WEST ADA
SCHOOL
DISTRICT
MERIDIAN HIGH
SCHOOL
AUDITORIUM
MRK DATE DESCRIPTION
TLG PN: 118074
L1.50
Landscape Details
10.22.18
MTA
DL
L1.50
Landscape Details
CZC
MTA
DL
10.22.18
NOTES:
1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS
RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN
STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE
YEAR WARRANTY PERIOD.
2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO
NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING.
3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO
INSTALLATION OF PLANT MATERIAL.
4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE
STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH
GALVANIZED NAILS TO PREVENT SLIPPAGE.
5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE
ARCHITECT IMMEDIATELY.
PREVAILING WIND DIRECTION
REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO
INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS;
IMPROPERLY PRUNED TREES (AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED.
SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL
COMMERCIAL SLOW RELEASE FERTILIZER TABLETS
BACKFILL WITH SOIL PLANTING MIX. SEE
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3" THICK BARK MULCH LAYER, KEEP BARK MULCH
3" AWAY FROM TRUNK
2" x 2" x 8" CEDAR STAKE - DO NOT PENETRATE ROOTBALL.
SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND.
RUBBER CINCH TIE
FINISH GRADE
ROOT PROBE
SOIL LINE
UTILIZE SOIL/ROOT PROBE AROUND TRUNK
(APPROX. 3-4" AWAY FROM TRUNK) TO LOCATE
HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE
POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL.
REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP
1
2 OF ROOTBALL, REMOVE ALL NAILS, TIES, AND PLASTIC
FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO
WRAP THE ROOTBALL, IT SHALL BE COMPLETELY
REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE
LEFT ON THE BOTTOM OF THE ROOTBALL.
2x ROOTBALL DIAMETER
3x ROOTBALL DIAMETER
6"
TREE WRAP TRUNK PROTECTION,
REMOVE AFTER INSTALLATION
3"
1 Deciduous Tree Planting
Scale: NTS
NOTES:
1. SET GROUND COVERS IN STAGGERED ROWS AS SPECIFIED.
2. SET PERENNIALS IN STAGGERED ROWS AS SPECIFIED.
BARK MULCH LAYER - 3" DEPTH OVER ENTIRE
BED. DO NOT COVER CROWNS OF PLANTS.
SOIL PLANTING MIX. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
SPLIT ALL ROOT BOUND ROOTS WITH 3 EQUAL
SPACED VERTICAL CUTS.
2 Perennial & Groundcover Planting
Scale: NTS
4" MIN.
DEPTH
BACKFILL WITH SOIL PLANTING
MIX. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
WATER RETENTION
BASIN
BARK MULCH LAYER
3" DEPTH
COMMERCIAL
FERTILIZER TABLETS
3 Shrub Planting
Scale: NTS
'B'
'A'
'A'
'A'
'A'
CONCRETE EDGE
'A'
NOTE:
1. GROUND COVERS AND PERENNIALS TO BE
INSTALLED WITH TRIANGULAR SPACING.
SPACING 'A'
6" O.C.
8" O.C.
10" O.C.
12" O.C.
15" O.C.
18" O.C.
24" O.C.
30" O.C.
36" O.C.
SPACING 'B'
5.20" O.C.
6.93" O.C.
8.66 O.C.
10.40" O.C.
13.00" O.C.
15.60" O.C.
20.80" O.C.
26.00" O.C.
30.00" O.C.
4 Typical Plant Spacing
Scale: NTS
10.22.2018
Tree Protection Notes
1.
EXISTING TREE TO BE PRESERVED AND PROTECTED. REFER TO TREE PROTECTION NOTES, THIS SHEET, FOR MORE INFORMATION.
2.
RETAIN AND PROTECT EXISTING LANDSCAPE IN THIS AREA.
Keynote Legend CALLOUT NUMBERS COORDINATED
TO NUMBERED NOTES BELOW.
DECIDUOUS TREES BOTANICAL NAME / COMMON NAME SIZE CONTAINER QTY REMARKS
AG ACER RUBRUM `OCTOBER GLORY` TM / OCTOBER GLORY MAPLE 2" CAL. B&B 40 CLASS II
BN BETULA NIGRA / RIVER BIRCH MULTI-TRUNK 2" CAL. B&B 3 CLASS II
CR CERCIS CANADENSIS `RISING SUN` / RISING SUN REDBUD 3" CAL. B&B 3 CLASS I
LG LIRIODENDRON TULIPIFERA `GLEN GOLD` / TULIP TREE 5" CAL. B&B 5 CLASS II
LW LIQUIDAMBAR STYRACIFLUA `WORPLESDON` / WORPLESDON SWEET GUM2" CAL. B&B 29 CLASS II
SHRUBS BOTANICAL NAME / COMMON NAME SIZE CONTAINER QTY REMARKS
BG BUXUS MICROPHYLLA `WINTER GEM` / GLOBE WINTER GEM BOXWOOD 5 GAL. 15
BH BERBERIS THUNBERGII `HELMOND PILLAR` / COLUMNAR BARBERRY 3 GAL. 16
CI CORNUS ALBA `IVORY HALO` TM / TATARIAN DOGWOOD 5 GAL. 4
CK CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER` / FEATHER REED GRASS 1 GAL. 15
HO HEMEROCALLIS X `STELLA DE ORO` / STELLA DE ORO DAYLILY 5 GAL. 22
MC MICROBIOTA DECUSSATA `CONDREW` / DREW`S BLUE SIBERIAN CARPET 5 CYPRESS GAL. 3
PH PINUS SYLVESTRIS `HILLSIDE CREEPER` / HILLSIDE CREEPER SCOTCH PINE 5 GAL. 6
PL PHYSOCARPUS OPULIFOLIUS `LITTLE DEVIL` TM / DWARF NINEBARK 3 GAL. 11
RG RHUS AROMATICA `GRO-LOW` / GRO-LOW FRAGRANT SUMAC 5 GAL. 15
SA SEDUM X `AUTUMN JOY` / AUTUMN JOY SEDUM 1 GAL. 42
SM SALVIA X SYLVESTRIS `MAY NIGHT` / SAGE 1 GAL. 34
GROUND COVERS BOTANICAL NAME / COMMON NAME SIZE CONTAINER QTY REMARKS
PACHYSANDRA TERMINALIS `GREEN SHEEN` / GREEN SHEEN JAPANESE SPURGE 1 GAL. 809
PLANT SCHEDULE
#
IV
IV IV
IRR
IBX
4''W 4''W 4''W 4''W 4''W
4''W 4''W 4''W
14
13
11
10
9
12
7
8
6
2
3 1
5 4
EXISTING
BUILDING
EXISTING BUILDING
EXISTING
BUILDING
1
1
1
2 2
#
Tree Removal List
SYMBOL SPECIES (BOTANICAL NAME) CALIPER SIZE (INCHES)
1 PYRUS 13"
2 ACER 12"
3 CORNUS 7"
4 CERCIS 12"
5 PINUS 11"
6 PYRUS 11"
7 PRUNUS 9"
8 TILIA 6"
9 PINUS 21"
10 PINUS 17"
11 PINUS 15"
12 PINUS 19"
13 PINUS 26"
14 PICEA 11"
TOTAL CALIPER INCHES REMOVED: 190"
Tree Mitigation
TOTAL CALIPER INCHES PROPOSED IN PROJECT
AREA: 52"
TOTAL CALIPER INCHES PROPOSED IN OVERALL
AREA: 138"
TOTAL MITIGATION: 190"
Tree Mitigation Notes
1.
REFER TO SHEET L1.00 FOR MITIGATED TREES IN OVERALL PROJECT AREA.
2.
REFER TO LANDSCAPE PLAN - PROJECT AREA, THIS SHEET, FOR MITIGATED
TREES IN PROJECT AREA.
A.
PROTECT THE CRITICAL ROOT ZONE OF THE TREES TO BE RETAINED ON SITE: (NOTE: CRITICAL
ROOT ZONE IS THE AREA DIRECTLY BELOW THE DRIP LINE OF THE TREE.)
A.1.
CONSTRUCT PROTECTIVE FENCING OF CHAIN-LINK AROUND THE CRITICAL ROOT ZONE PRIOR
TO DEMOLITION OR CONSTRUCTION.
A.2.
DO NOT ALLOW COMPACTION BY EQUIPMENT TRAFFIC DURING CONSTRUCTION OR DURING
DEMOLITION.
A.3.
DO NOT ALLOW CEMENT TRUCKS TO RINSE WITHIN THE PROTECTION AREA, ANYWHERE
THAT TREE ROOTS EXIST OR IN PLANNED PLANTING BEDS.
A.4.
DO NOT STOCKPILE MATERIALS, DEBRIS OR DIRT WITHIN THE TREE PROTECTION AREA.
A.5.
MAINTAIN WATERING WITHIN THE CRITICAL ROOT ZONE FROM MID-APRIL TO MID-OCTOBER
AT THE RATE OF NOT LESS THAN THE EQUIVALENT OF 1-1/2" OF WATER OVER THE ENTIRE
AREA PER WEEK.
A.6.
DO NOT TRENCH, EXCAVATE, FILL OR OTHERWISE DISTURB THE SOIL WITHIN THE CRITICAL
ROOT ZONE.
A.7.
ADJUST PROPOSED IMPROVEMENT LOCATIONS AS REQUIRED TO AVOID DAMAGING TREE
ROOTS.
B.
PROTECT THE CROWN AND TRUNK OF TREES TO BE RETAINED ON SITE:
B.1.
OPERATE EQUIPMENT IN SUCH A WAY AS TO AVOID CONTACT WITH TREE TRUNKS OR
BRANCHES.
B.2.
PRUNING OF PUBLIC PROPERTY TREES SHALL BE PERFORMED BY A LICENSED ARBORIST.
C.
ALL TREES DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED WITH A 4"
CALIPER TREE- SPECIES TO MATCH THE EXISTING.
Tree Protection Notes
A. NO EXISTING OPEN CANALS, CREEKS, DRAINS, PONDS, WETLANDS, FLOODPLAINS, HIGH
GROUNDWATER AREAS, OR ROCK OUTCROPPINGS EXIST WITHIN THE PROJECT AREA. NINE MILE
DRAIN IS AN OPEN CANAL ON THE NORTHERN PROPERTY BOUNDARY BUT WILL NOT BE IMPACTED
BY THE PROJECT. THE EIGHTMILE LATERAL IS PIPED UNDERGROUND THROUGH THE SITE.
B. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR
PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK.
C. FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE
WITH SITE GRADING PLAN. REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET
FINISH GRADES. PLACE 4" OF ROCK MULCH OVER SUBGRADE SOIL TO ACHIEVE FINISH GRADE.
FINISH GRADE RELATED TO ADJACENT SITE ELEMENTS SHALL BE:
C.A. 1-INCH BELOW TOP OF ADJACENT PAVEMENT, VALVE BOX, VAULT, ETC.
C.B. 3-INCHES BELOW TOP OF CURB UNLESS NOTED OTHERWISE.
D. ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18" OF TOPSOIL, SOD AREAS A MINIMUM OF 12"
OF TOPSOIL. SPREAD, COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE.
E. RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE. VERIFY SUITABILITY OF SURFACE SOIL TO
PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN NECESSARY. TOPSOIL SHALL BE
A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED
SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE
TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO
EITHER: A) PROVIDE APPROVED IMPORTED TOPSOIL, OR B.) IMPROVE ON-SITE TOPSOIL WITH
METHODS APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN
QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS, PLANTS, SODS, STONES, CLAY LUMPS
AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH.
F. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEW TOPSOIL THAT IS
FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS,
BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2
INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT
GROWTH.
G. OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL
CHARACTERISTICS TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY,
WELL-DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF NOT LESS THAN 4 INCHES.
H. ALL LANDSCAPE AREAS SHALL BE WEED FREE AT THE TIME OF LANDSCAPE
INSTALLATION.REMOVE ALL ROOTS, WEEDS, ROCKS AND FOREIGN MATERIAL ON THE SURFACE.
I. NEW TREE PLANTING, SEE DETAIL 3/L1.00. CONTRACTOR SHALL STAKE ALL TREES DEEMED
NECESSARY, I.E..... FROM BEING BLOWN OVER, PLANTED WITH LOOSE ROOT BALL, ETC.
CONTRACTOR'S OPTION.
J. NEW SHRUB PLANTING. SEE DETAIL 1/L1.00.
K. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE
AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION.
L. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE
DATE OF SUBSTANTIAL COMPLETION. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A
HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE
OWNER.
M. TREE PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND FERTILIZER FOR
TREE PIT BACKFILL AT THE FOLLOWING RATES. BLEND AMENDMENTS THOROUGHLY WITH SOIL
BACKFILL. TREE PITS SHALL 5'x5'x1.BE 5' (37.5 CF/ 1.5 CY).
M.A. APPLICATION RATES:
M.A.A. HUMIC ACID: 25 LBS PER TREE PIT
M.A.B. COMMERCIAL GRADE COMPOST - 10 CUBIC FEET PER TREE PIT
M.A.C. PLANTING TABLET FERTILIZER - 4 TABLETS PER TREE PIT
M.A.D. CALCIFIED DIATOMACEOUS EARTH - 75 LBS PER TREE PIT
N. SHRUB PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND FERTILIZER FOR
SHRUB PIT BACKFILL AT THE FOLLOWING RATES. BLEND AMENDMENTS WITH THOROUGHLY WITH
SOIL BACKFILL. SHRUB PITS SHALL BE 2.5'x2.5'x1' (6.25 CF/ 0.25 CY).
N.A. APPLICATION RATES:
N.A.A. HUMIC ACID: 2 LBS PER SHRUB PIT
N.A.B. COMMERCIAL GRADE COMPOST - 2 CUBIC FEET PER SHRUB PIT
N.A.C. PLANTING TABLET FERTILIZER - 2 TABLETS PER SHRUB PIT
N.A.D. CALCIFIED DIATOMACEOUS EARTH - 15 LBS PER SHRUB PIT
O. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM
LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE.
P. CONTRACTOR SHALL SUBMIT MATERIAL SAMPLES FOR LANDSCAPE ROCK MULCH TO LANDSCAPE
ARCHITECT FOR APPROVAL PRIOR TO PROCUREMENT. LANDSCAPE BOULDERS, PHOTO SUBMITTAL
IS ADEQUATE. FOR ROCK MULCH, SUBMIT 1 GALLON BAG SAMPLE TO OWNER.
Landscape Notes:
A. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM
WHICH ENSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES.
B. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS.
C. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 18" AT PLANTER BEDS, 6"
AT LAWN AREAS..
D. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEMS - WITH DRIP CONTROL ZONE KIT AND 150
MESH FILTER (MIN.).
E. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM
CONTROLLER REQUIREMENTS ARE AS FOLLOWS:
E.A. PRECISE INDIVIDUAL STATION TIMING
E.B. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES
E.C. AT LEAST ONE PROGRAM FOR EACH HYDROZONE
E.D. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF
E.E. POWER FAILURE BACKUP FOR ALL PROGRAMMED INDIVIDUAL VALVED WATERING
STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE
HYDRO-ZONES.
F. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER
TO RESPECTIVE HYDRO-ZONES.
G. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% COVERAGE WITH HEAD TO HEAD
SPACING OR TRIANGULAR SPACING AS APPROPRIATE.
H. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES
SUCH AS SIDEWALKS, DRIVEWAYS, AND PARKING AREA.
I. EACH VALVE SHALL BE INSTALLED IN A VALVE BOX LARGE ENOUGH TO ALLOW FOR MAINTENANCE
AND REMOVAL. ONLY ONE VALVE PER BOX.
Automatic Underground Irrigation Notes:
JOB N0.:
CHECKED BY:
SHEET NO.
DRAWN BY:
DATE:
121 N. 9TH ST. SUITE 401
BOISE, IDAHO 83702
(208) 639-4520
AXIOM
STRUCTURAL ENGINEER
462 E. SHORE DR. SUITE 100
EAGLE, IDAHO 83616
(208) 939-4041
THE LAND GROUP
CIVIL ENGINEER
420 S. ORCHARD ST.
BOISE, IDAHO 83705
(208) 343-3663
CATOR, RUMA & ASSOCIATES, CO.
MECHANICAL ENGINEER
408 E. PARKCENTER BLVD. STE 215
BOISE, IDAHO 83301
(208) 345-7127
EIDAM AND ASSOCIATES
ELECTRICAL ENGINEER
CONSULTANTS:
462 E. SHORE DR. SUITE 100
EAGLE, IDAHO 83616
(208) 939-4041
THE LAND GROUP
LANDSCAPE ARCHITECT
PHASE:
COPYRIGHT All rights reserved. Reproduction or use in any form
or by any means -- graphic, electronic, mechanical, etc. -- without
written permission of LOMBARD CONRAD ARCHITECTS, P.A.
is unlawful and subject to criminal prosecution.
18011.01
WEST ADA
SCHOOL
DISTRICT
MERIDIAN HIGH
SCHOOL
AUDITORIUM
MRK DATE DESCRIPTION
TLG PN: 118074
35% CONSTRUCTION DOCUMENTS
0 20' 40'
HORIZONTAL SCALE: 1"=20'
Landscape Plan - Project Area
L1.01
Landscape Plan -
Project Area
10.22.18
MTA
DL
0 20' 40'
HORIZONTAL SCALE: 1"=20'
Existing Tree Removal Plan
10.22.2018
R/W
R/W R/W R/W R/W
R/W
R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W R/W
R/W
R/W
R/W
R/W
R/W
R/W R/W
PINE AVENUE
LINDER ROAD
PROJECT AREA - SEE SHEET L1.01
LW (8)
(16)AG
AG (11)
LW (9)
AG (9) (9)LW
(4)AG
LW (3)
8
8
8
8
3
1
1
1 1
1
1
4 5 6 7
2
2
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
PARKING LOT
EXISTING
PARKING LOT
EXISTING
PARKING LOT
1
1
1
1
2
2 2
2
DECIDUOUS TREES BOTANICAL NAME / COMMON NAME SIZE CONTAINER QTY REMARKS
AG ACER RUBRUM `OCTOBER GLORY` TM / OCTOBER GLORY MAPLE 2" CAL. B&B 40 CLASS II
BN BETULA NIGRA / RIVER BIRCH MULTI-TRUNK 2" CAL. B&B 3 CLASS II
CR CERCIS CANADENSIS `RISING SUN` / RISING SUN REDBUD 3" CAL. B&B 3 CLASS I
LG LIRIODENDRON TULIPIFERA `GLEN GOLD` / TULIP TREE 2" CAL. B&B 5 CLASS II
LW LIQUIDAMBAR STYRACIFLUA `WORPLESDON` / WORPLESDON SWEET GUM2" CAL. B&B 29 CLASS II
PLANT SCHEDULE
JOB N0.:
CHECKED BY:
SHEET NO.
DRAWN BY:
DATE:
121 N. 9TH ST. SUITE 401
BOISE, IDAHO 83702
(208) 639-4520
AXIOM
STRUCTURAL ENGINEER
462 E. SHORE DR. SUITE 100
EAGLE, IDAHO 83616
(208) 939-4041
THE LAND GROUP
CIVIL ENGINEER
420 S. ORCHARD ST.
BOISE, IDAHO 83705
(208) 343-3663
CATOR, RUMA & ASSOCIATES, CO.
MECHANICAL ENGINEER
408 E. PARKCENTER BLVD. STE 215
BOISE, IDAHO 83301
(208) 345-7127
EIDAM AND ASSOCIATES
ELECTRICAL ENGINEER
CONSULTANTS:
462 E. SHORE DR. SUITE 100
EAGLE, IDAHO 83616
(208) 939-4041
THE LAND GROUP
LANDSCAPE ARCHITECT
PHASE:
COPYRIGHT All rights reserved. Reproduction or use in any form
or by any means -- graphic, electronic, mechanical, etc. -- without
written permission of LOMBARD CONRAD ARCHITECTS, P.A.
is unlawful and subject to criminal prosecution.
18011.01
WEST ADA
SCHOOL
DISTRICT
MERIDIAN HIGH
SCHOOL
AUDITORIUM
MRK DATE DESCRIPTION
TLG PN: 118074
0 80' 160'
HORIZONTAL SCALE: 1"=80'
Landscape Plan - Overall
L1.00
Landscape Plan -
Overall
10.22.18
MTA
DL
10.22.2018
4' (TYP.)
109'
6'
10'
25'
21'
25' 25'
34'
7'
18'
17' 16'
66'
17
PROPOSED AUDITORIUM
BUILDING
EXISTING
BUILDING
EXISTING BUILDING
EXISTING
BUILDING
17
17
17
17
17
17
8
15
5
12
12
1
2
6
1
10
12
9
13
13
7
14
3.1
3
3
14
Keynotes
STANDARD CONCRETE FLATWORK
Materials Legend
HEAVY DUTY CONCRETE FLATWORK
STANDARD CONCRETE FLATWORK WITH
INTEGRAL COLOR (DAVIS COLORS DARK GRAY
[IRON OXIDE] #860)
LANDSCAPE AREA, SEE LANDSCAPE PLAN L1.01.
1. ADA PEDESTRIAN RAMP
2. CONTRACTOR LAY-DOWN YARD
3. EXISTING PRESSURIZED IRRIGATION LINE
3.1. PROPOSED RE-ROUTE OF PRESSURIZED IRRIGATION LINE
4. NOT USED
5. RETAIN AND PROTECT EXISTING LANDSCAPE
6. RELOCATED MHS WARRIORS BOULDER
7. PROPOSED STORMWATER INFILTRATION AREA
8. FLAG POLE TO REPLACE EXISTING AT NEW LOCATION
9. MERIDIAN CITY WATER EASEMENT - APPROXIMATE LOCATION
10. REINFORCED CONCRETE FIRE ACCESS AREA
11. NOT USED
12. SIDEWALK AND CURB TO TIE TO EXISTING
13. EXISTING PARKING LOT
14. EXISTING ASPHALT DRIVE
15. CONCRETE MOW CURB
16. NOT USED
17. FROST WALL AT ENTRANCE
CALLOUT NUMBERS COORDINATED
TO NUMBERED NOTES BELOW.
#
Sheet Notes
A. BICYCLE PARKING FACILITIES CURRENTLY EXIST ON SITE AND WILL BE
MAINTAINED.
B. TRASH AND/OR RECYCLING ENCLOSURES CURRENTLY EXIST ON SITE AND WILL BE
MAINTAINED.
C. REFER TO SHEET C1.00 FOR PROJECT CALCULATIONS.
D. REFER TO SHEET L1.01 FOR SPECIFICATIONS FOR UNDERGROUND IRRIGATION.
JOB N0.:
CHECKED BY:
SHEET NO.
DRAWN BY:
DATE:
121 N. 9TH ST. SUITE 401
BOISE, IDAHO 83702
(208) 639-4520
AXIOM
STRUCTURAL ENGINEER
462 E. SHORE DR. SUITE 100
EAGLE, IDAHO 83616
(208) 939-4041
THE LAND GROUP
CIVIL ENGINEER
420 S. ORCHARD ST.
BOISE, IDAHO 83705
(208) 343-3663
CATOR, RUMA & ASSOCIATES, CO.
MECHANICAL ENGINEER
408 E. PARKCENTER BLVD. STE 215
BOISE, IDAHO 83301
(208) 345-7127
EIDAM AND ASSOCIATES
ELECTRICAL ENGINEER
CONSULTANTS:
462 E. SHORE DR. SUITE 100
EAGLE, IDAHO 83616
(208) 939-4041
THE LAND GROUP
LANDSCAPE ARCHITECT
PHASE:
COPYRIGHT All rights reserved. Reproduction or use in any form
or by any means -- graphic, electronic, mechanical, etc. -- without
written permission of LOMBARD CONRAD ARCHITECTS, P.A.
is unlawful and subject to criminal prosecution.
18011.01
WEST ADA
SCHOOL
DISTRICT
MERIDIAN HIGH
SCHOOL
AUDITORIUM
MRK DATE DESCRIPTION
TLG PN: 118074
0 20' 40'
HORIZONTAL SCALE: 1"=20'
Site Plan - Project Area
C1.01
Site Plan - Project
Area
10.22.18
MTA
DL
10.22.2018
31,922 SQ. FT. (GROSS)
PROPOSED BUILDING TOTAL
373,142 SQ. FT. (GROSS)
Keynotes
CALLOUT NUMBERS COORDINATED
TO NUMBERED NOTES BELOW.
1. APPROXIMATE CENTER LINE OF NINE MILE CREEK
2. APPROXIMATE PROPERTY LINE OF MERIDIAN HIGH SCHOOL (FENCE LINE)
3. PROPOSED 14' PEDESTRIAN PATHWAY EASEMENT BOUNDARY
4. APPROXIMATE BOUNDARY OF NAMPA-MERIDIAN IRRIGATION DISTRICT EASEMENT
5. PROPOSED LOCATION OF TREE MITIGATION AS PATHWAY ENHANCEMENT
6. PROPOSED LOCATION OF TREE MITIGATION AS LINDER ROAD BUFFER
7. PROJECT AREA - REFER TO SHEET C1.01.
8. APPROXIMATE LOCATION OF MERIDIAN CITY WATER EASEMENT
#
Sheet Notes
A. REFER TO SHEET C1.01 FOR ADDITIONAL INFORMATION.
0 80' 160'
HORIZONTAL SCALE: 1"=80'
Site Plan - Overall
JOB N0.:
CHECKED BY:
SHEET NO.
DRAWN BY:
DATE:
121 N. 9TH ST. SUITE 401
BOISE, IDAHO 83702
(208) 639-4520
AXIOM
STRUCTURAL ENGINEER
462 E. SHORE DR. SUITE 100
EAGLE, IDAHO 83616
(208) 939-4041
THE LAND GROUP
CIVIL ENGINEER
420 S. ORCHARD ST.
BOISE, IDAHO 83705
(208) 343-3663
CATOR, RUMA & ASSOCIATES, CO.
MECHANICAL ENGINEER
408 E. PARKCENTER BLVD. STE 215
BOISE, IDAHO 83301
(208) 345-7127
EIDAM AND ASSOCIATES
ELECTRICAL ENGINEER
CONSULTANTS:
462 E. SHORE DR. SUITE 100
EAGLE, IDAHO 83616
(208) 939-4041
THE LAND GROUP
LANDSCAPE ARCHITECT
PHASE:
COPYRIGHT All rights reserved. Reproduction or use in any form
or by any means -- graphic, electronic, mechanical, etc. -- without
written permission of LOMBARD CONRAD ARCHITECTS, P.A.
is unlawful and subject to criminal prosecution.