Loading...
D 181022 CZC_Site&Landscape 118074PROJECT AREA - SEE SHEET C1.01 7 PINE AVENUE LINDER ROAD R-4 R-40 RUT R-4 R-4 R-4 5 1 2 3 5 4 5 4 2 3 6 8 1 532' 718' 835' EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING PARKING LOT EXISTING PARKING LOT EXISTING PARKING LOT 453' Project Information MERIDIAN HIGH SCHOOL 1900 WEST PINE AVENUE, MERIDIAN, ID 83642 OWNER: JOINT SCHOOL DISTRICT NO. 2 CONTACT: JOE YOCHUM ADDRESS: 1303 E. CENTRAL DRIVE, MERIDIAN, IDAHO 83642 PHONE: (208) 855-4500 ZONING CODE R-4 Overall Site Calculations LOT SIZE 33.7 ACRES (1,467,972 SQ.FT.) STANDARD VEHICULAR PARKING STALLS NO NEW - EXISTING TO REMAIN. REQUIRED STALLS: 746 EXISTING STALLS: 894 BICYCLE PARKING NO NEW - EXISTING TO REMAIN EXISTING BUILDING 341,220 SQ. FT. (GROSS) PROPOSED BUILDING ADDITION X X IV IV IV IV IV IV IV G RD RD RD RD X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR 111' 130' 16' 17' 42' 38' 45' 10' 14' 6' 6' 38' 6' 6' 39' 6' 60' 12' 2' 10' 7' 38' 44' 31' Project Information MERIDIAN HIGH SCHOOL 1900 WEST PINE AVENUE, MERIDIAN, ID 83642 OWNER: JOINT SCHOOL DISTRICT NO. 2 CONTACT: JOE YOCHUM ADDRESS: 1303 E. CENTRAL DRIVE, MERIDIAN, IDAHO 83642 PHONE: (208) 855-4500 1. PROPOSED TREE MITIGATION AND BORDER TO PEDESTRIAN PATHWAY, 45 TREES, MIN. 2" CALIPER. 2. PROPOSED TREE MITIGATION AND BUFFER AT LINDER ROAD, 24 TREES, MIN. 2" CALIPER. 3. PROJECT SITE - REFER TO L1.01 FOR LANDSCAPE PLAN. 4. APPROXIMATE CENTER LINE OF NINE MILE DRAIN 5. APPROXIMATE PROPERTY LINE OF MERIDIAN HIGH SCHOOL (FENCE LINE) 6. PROPOSED 14' PEDESTRIAN PATHWAY EASEMENT BOUNDARY 7. APPROXIMATE BOUNDARY OF NAMPA-MERIDIAN IRRIGATION DISTRICT EASEMENT 8. VISION TRIANGLE PER MERIDIAN CITY CODE 11-3A-3 Keynotes CALLOUT NUMBERS COORDINATED TO NUMBERED NOTES BELOW. Sheet Notes: A. NO EXISTING OPEN CANALS, CREEKS, DRAINS, PONDS, WETLANDS, FLOODPLAINS, HIGH GROUNDWATER AREAS, OR ROCK OUTCROPPINGS EXIST WITHIN THE PROJECT AREA. NINEMILE DRAIN IS AN OPEN CANAL ON THE NORTHERN PROPERTY BOUNDARY BUT WILL NOT BE IMPACTED BY THE PROJECT. THE EIGHTMILE LATERAL IS PIPED UNDERGROUND THROUGH THE SITE. B. ALL STORMWATER FACILITIES WILL BE UNDERGROUND. # Project Calculations PROJECT CALCULATIONS · WIDTH OF STREET BUFFER: NA LINEAR FEET OF STREET FRONTAGE: NA NUMBER OF STREET TREES REQUIRED: NA · RESIDENTIAL SUBDIVISION TREES: NA · ACREAGE AND PERCENTAGE DEDICATED FOR COMMON OPEN N/SPACE: A · ACREAGE AND PERCENTAGE DEDICATED FOR QUALIFIED OPEN N/SPACE: A · NUMBER OF TREES PROVIDED ON COMMON 11 LOTS: (IN PROJECT AREA); 80 (OVERALL SITE) · MITIGATION FOR REMOVAL OF TREES: 14 TREES WILL BE REMOVED. REFER TO TREE REMOVAL EXHIBIT, THIS SHEET, FOR MORE INFORMATION. SS SD SS IBX GRATE:2584.34' IE(W)36"CONC:2577.07' IE(E)36"CONC:2577.04' SUMP:2577.04' UGP UGP SS SS R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR PIRR 4''W 4''W 4''W 4''W 4''W 4''W 4''W 4''W PROPOSED AUDITORIUM BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING (5)RG CK (6) PH (1) SA (4) CR (3) SM (5) SA (7) SM (6) (5)CK (3)PL (1)PH (1)PH SM (5) (5)CK (3)PL PH (3) (10)SA (5)PL (4)CI (3)BN (9)SM (7)SA (5)RG (7)HO (8)SA SM (8) HO (6) (16)BH HO (9) SA (3) MC (2) PG (29) PG (25) PG (53) (5)LG BG (15) (702)PG (5)RG 1 1 1 1 2 2 2 JOB N0.: CHECKED BY: SHEET NO. DRAWN BY: DATE: 121 N. 9TH ST. SUITE 401 BOISE, IDAHO 83702 (208) 639-4520 AXIOM STRUCTURAL ENGINEER 462 E. SHORE DR. SUITE 100 EAGLE, IDAHO 83616 (208) 939-4041 THE LAND GROUP CIVIL ENGINEER 420 S. ORCHARD ST. BOISE, IDAHO 83705 (208) 343-3663 CATOR, RUMA & ASSOCIATES, CO. MECHANICAL ENGINEER 408 E. PARKCENTER BLVD. STE 215 BOISE, IDAHO 83301 (208) 345-7127 EIDAM AND ASSOCIATES ELECTRICAL ENGINEER CONSULTANTS: 462 E. SHORE DR. SUITE 100 EAGLE, IDAHO 83616 (208) 939-4041 THE LAND GROUP LANDSCAPE ARCHITECT PHASE: COPYRIGHT All rights reserved. Reproduction or use in any form or by any means -- graphic, electronic, mechanical, etc. -- without written permission of LOMBARD CONRAD ARCHITECTS, P.A. is unlawful and subject to criminal prosecution. 18011.01 WEST ADA SCHOOL DISTRICT MERIDIAN HIGH SCHOOL AUDITORIUM MRK DATE DESCRIPTION TLG PN: 118074 L1.50 Landscape Details 10.22.18 MTA DL L1.50 Landscape Details CZC MTA DL 10.22.18 NOTES: 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. PREVAILING WIND DIRECTION REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL COMMERCIAL SLOW RELEASE FERTILIZER TABLETS BACKFILL WITH SOIL PLANTING MIX. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. 3" THICK BARK MULCH LAYER, KEEP BARK MULCH 3" AWAY FROM TRUNK 2" x 2" x 8" CEDAR STAKE - DO NOT PENETRATE ROOTBALL. SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. RUBBER CINCH TIE FINISH GRADE ROOT PROBE SOIL LINE UTILIZE SOIL/ROOT PROBE AROUND TRUNK (APPROX. 3-4" AWAY FROM TRUNK) TO LOCATE HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 1 2 OF ROOTBALL, REMOVE ALL NAILS, TIES, AND PLASTIC FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 2x ROOTBALL DIAMETER 3x ROOTBALL DIAMETER 6" TREE WRAP TRUNK PROTECTION, REMOVE AFTER INSTALLATION 3" 1 Deciduous Tree Planting Scale: NTS NOTES: 1. SET GROUND COVERS IN STAGGERED ROWS AS SPECIFIED. 2. SET PERENNIALS IN STAGGERED ROWS AS SPECIFIED. BARK MULCH LAYER - 3" DEPTH OVER ENTIRE BED. DO NOT COVER CROWNS OF PLANTS. SOIL PLANTING MIX. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. SPLIT ALL ROOT BOUND ROOTS WITH 3 EQUAL SPACED VERTICAL CUTS. 2 Perennial & Groundcover Planting Scale: NTS 4" MIN. DEPTH BACKFILL WITH SOIL PLANTING MIX. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. WATER RETENTION BASIN BARK MULCH LAYER 3" DEPTH COMMERCIAL FERTILIZER TABLETS 3 Shrub Planting Scale: NTS 'B' 'A' 'A' 'A' 'A' CONCRETE EDGE 'A' NOTE: 1. GROUND COVERS AND PERENNIALS TO BE INSTALLED WITH TRIANGULAR SPACING. SPACING 'A' 6" O.C. 8" O.C. 10" O.C. 12" O.C. 15" O.C. 18" O.C. 24" O.C. 30" O.C. 36" O.C. SPACING 'B' 5.20" O.C. 6.93" O.C. 8.66 O.C. 10.40" O.C. 13.00" O.C. 15.60" O.C. 20.80" O.C. 26.00" O.C. 30.00" O.C. 4 Typical Plant Spacing Scale: NTS 10.22.2018 Tree Protection Notes 1. EXISTING TREE TO BE PRESERVED AND PROTECTED. REFER TO TREE PROTECTION NOTES, THIS SHEET, FOR MORE INFORMATION. 2. RETAIN AND PROTECT EXISTING LANDSCAPE IN THIS AREA. Keynote Legend CALLOUT NUMBERS COORDINATED TO NUMBERED NOTES BELOW. DECIDUOUS TREES BOTANICAL NAME / COMMON NAME SIZE CONTAINER QTY REMARKS AG ACER RUBRUM `OCTOBER GLORY` TM / OCTOBER GLORY MAPLE 2" CAL. B&B 40 CLASS II BN BETULA NIGRA / RIVER BIRCH MULTI-TRUNK 2" CAL. B&B 3 CLASS II CR CERCIS CANADENSIS `RISING SUN` / RISING SUN REDBUD 3" CAL. B&B 3 CLASS I LG LIRIODENDRON TULIPIFERA `GLEN GOLD` / TULIP TREE 5" CAL. B&B 5 CLASS II LW LIQUIDAMBAR STYRACIFLUA `WORPLESDON` / WORPLESDON SWEET GUM2" CAL. B&B 29 CLASS II SHRUBS BOTANICAL NAME / COMMON NAME SIZE CONTAINER QTY REMARKS BG BUXUS MICROPHYLLA `WINTER GEM` / GLOBE WINTER GEM BOXWOOD 5 GAL. 15 BH BERBERIS THUNBERGII `HELMOND PILLAR` / COLUMNAR BARBERRY 3 GAL. 16 CI CORNUS ALBA `IVORY HALO` TM / TATARIAN DOGWOOD 5 GAL. 4 CK CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER` / FEATHER REED GRASS 1 GAL. 15 HO HEMEROCALLIS X `STELLA DE ORO` / STELLA DE ORO DAYLILY 5 GAL. 22 MC MICROBIOTA DECUSSATA `CONDREW` / DREW`S BLUE SIBERIAN CARPET 5 CYPRESS GAL. 3 PH PINUS SYLVESTRIS `HILLSIDE CREEPER` / HILLSIDE CREEPER SCOTCH PINE 5 GAL. 6 PL PHYSOCARPUS OPULIFOLIUS `LITTLE DEVIL` TM / DWARF NINEBARK 3 GAL. 11 RG RHUS AROMATICA `GRO-LOW` / GRO-LOW FRAGRANT SUMAC 5 GAL. 15 SA SEDUM X `AUTUMN JOY` / AUTUMN JOY SEDUM 1 GAL. 42 SM SALVIA X SYLVESTRIS `MAY NIGHT` / SAGE 1 GAL. 34 GROUND COVERS BOTANICAL NAME / COMMON NAME SIZE CONTAINER QTY REMARKS PACHYSANDRA TERMINALIS `GREEN SHEEN` / GREEN SHEEN JAPANESE SPURGE 1 GAL. 809 PLANT SCHEDULE # IV IV IV IRR IBX 4''W 4''W 4''W 4''W 4''W 4''W 4''W 4''W 14 13 11 10 9 12 7 8 6 2 3 1 5 4 EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING 1 1 1 2 2 # Tree Removal List SYMBOL SPECIES (BOTANICAL NAME) CALIPER SIZE (INCHES) 1 PYRUS 13" 2 ACER 12" 3 CORNUS 7" 4 CERCIS 12" 5 PINUS 11" 6 PYRUS 11" 7 PRUNUS 9" 8 TILIA 6" 9 PINUS 21" 10 PINUS 17" 11 PINUS 15" 12 PINUS 19" 13 PINUS 26" 14 PICEA 11" TOTAL CALIPER INCHES REMOVED: 190" Tree Mitigation TOTAL CALIPER INCHES PROPOSED IN PROJECT AREA: 52" TOTAL CALIPER INCHES PROPOSED IN OVERALL AREA: 138" TOTAL MITIGATION: 190" Tree Mitigation Notes 1. REFER TO SHEET L1.00 FOR MITIGATED TREES IN OVERALL PROJECT AREA. 2. REFER TO LANDSCAPE PLAN - PROJECT AREA, THIS SHEET, FOR MITIGATED TREES IN PROJECT AREA. A. PROTECT THE CRITICAL ROOT ZONE OF THE TREES TO BE RETAINED ON SITE: (NOTE: CRITICAL ROOT ZONE IS THE AREA DIRECTLY BELOW THE DRIP LINE OF THE TREE.) A.1. CONSTRUCT PROTECTIVE FENCING OF CHAIN-LINK AROUND THE CRITICAL ROOT ZONE PRIOR TO DEMOLITION OR CONSTRUCTION. A.2. DO NOT ALLOW COMPACTION BY EQUIPMENT TRAFFIC DURING CONSTRUCTION OR DURING DEMOLITION. A.3. DO NOT ALLOW CEMENT TRUCKS TO RINSE WITHIN THE PROTECTION AREA, ANYWHERE THAT TREE ROOTS EXIST OR IN PLANNED PLANTING BEDS. A.4. DO NOT STOCKPILE MATERIALS, DEBRIS OR DIRT WITHIN THE TREE PROTECTION AREA. A.5. MAINTAIN WATERING WITHIN THE CRITICAL ROOT ZONE FROM MID-APRIL TO MID-OCTOBER AT THE RATE OF NOT LESS THAN THE EQUIVALENT OF 1-1/2" OF WATER OVER THE ENTIRE AREA PER WEEK. A.6. DO NOT TRENCH, EXCAVATE, FILL OR OTHERWISE DISTURB THE SOIL WITHIN THE CRITICAL ROOT ZONE. A.7. ADJUST PROPOSED IMPROVEMENT LOCATIONS AS REQUIRED TO AVOID DAMAGING TREE ROOTS. B. PROTECT THE CROWN AND TRUNK OF TREES TO BE RETAINED ON SITE: B.1. OPERATE EQUIPMENT IN SUCH A WAY AS TO AVOID CONTACT WITH TREE TRUNKS OR BRANCHES. B.2. PRUNING OF PUBLIC PROPERTY TREES SHALL BE PERFORMED BY A LICENSED ARBORIST. C. ALL TREES DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED WITH A 4" CALIPER TREE- SPECIES TO MATCH THE EXISTING. Tree Protection Notes A. NO EXISTING OPEN CANALS, CREEKS, DRAINS, PONDS, WETLANDS, FLOODPLAINS, HIGH GROUNDWATER AREAS, OR ROCK OUTCROPPINGS EXIST WITHIN THE PROJECT AREA. NINE MILE DRAIN IS AN OPEN CANAL ON THE NORTHERN PROPERTY BOUNDARY BUT WILL NOT BE IMPACTED BY THE PROJECT. THE EIGHTMILE LATERAL IS PIPED UNDERGROUND THROUGH THE SITE. B. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. C. FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE WITH SITE GRADING PLAN. REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. PLACE 4" OF ROCK MULCH OVER SUBGRADE SOIL TO ACHIEVE FINISH GRADE. FINISH GRADE RELATED TO ADJACENT SITE ELEMENTS SHALL BE: C.A. 1-INCH BELOW TOP OF ADJACENT PAVEMENT, VALVE BOX, VAULT, ETC. C.B. 3-INCHES BELOW TOP OF CURB UNLESS NOTED OTHERWISE. D. ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18" OF TOPSOIL, SOD AREAS A MINIMUM OF 12" OF TOPSOIL. SPREAD, COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE. E. RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE. VERIFY SUITABILITY OF SURFACE SOIL TO PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN NECESSARY. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER: A) PROVIDE APPROVED IMPORTED TOPSOIL, OR B.) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS, PLANTS, SODS, STONES, CLAY LUMPS AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. F. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEW TOPSOIL THAT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. G. OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF NOT LESS THAN 4 INCHES. H. ALL LANDSCAPE AREAS SHALL BE WEED FREE AT THE TIME OF LANDSCAPE INSTALLATION.REMOVE ALL ROOTS, WEEDS, ROCKS AND FOREIGN MATERIAL ON THE SURFACE. I. NEW TREE PLANTING, SEE DETAIL 3/L1.00. CONTRACTOR SHALL STAKE ALL TREES DEEMED NECESSARY, I.E..... FROM BEING BLOWN OVER, PLANTED WITH LOOSE ROOT BALL, ETC. CONTRACTOR'S OPTION. J. NEW SHRUB PLANTING. SEE DETAIL 1/L1.00. K. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. L. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF SUBSTANTIAL COMPLETION. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. M. TREE PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND FERTILIZER FOR TREE PIT BACKFILL AT THE FOLLOWING RATES. BLEND AMENDMENTS THOROUGHLY WITH SOIL BACKFILL. TREE PITS SHALL 5'x5'x1.BE 5' (37.5 CF/ 1.5 CY). M.A. APPLICATION RATES: M.A.A. HUMIC ACID: 25 LBS PER TREE PIT M.A.B. COMMERCIAL GRADE COMPOST - 10 CUBIC FEET PER TREE PIT M.A.C. PLANTING TABLET FERTILIZER - 4 TABLETS PER TREE PIT M.A.D. CALCIFIED DIATOMACEOUS EARTH - 75 LBS PER TREE PIT N. SHRUB PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND FERTILIZER FOR SHRUB PIT BACKFILL AT THE FOLLOWING RATES. BLEND AMENDMENTS WITH THOROUGHLY WITH SOIL BACKFILL. SHRUB PITS SHALL BE 2.5'x2.5'x1' (6.25 CF/ 0.25 CY). N.A. APPLICATION RATES: N.A.A. HUMIC ACID: 2 LBS PER SHRUB PIT N.A.B. COMMERCIAL GRADE COMPOST - 2 CUBIC FEET PER SHRUB PIT N.A.C. PLANTING TABLET FERTILIZER - 2 TABLETS PER SHRUB PIT N.A.D. CALCIFIED DIATOMACEOUS EARTH - 15 LBS PER SHRUB PIT O. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. P. CONTRACTOR SHALL SUBMIT MATERIAL SAMPLES FOR LANDSCAPE ROCK MULCH TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PROCUREMENT. LANDSCAPE BOULDERS, PHOTO SUBMITTAL IS ADEQUATE. FOR ROCK MULCH, SUBMIT 1 GALLON BAG SAMPLE TO OWNER. Landscape Notes: A. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH ENSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. B. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS. C. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 18" AT PLANTER BEDS, 6" AT LAWN AREAS.. D. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEMS - WITH DRIP CONTROL ZONE KIT AND 150 MESH FILTER (MIN.). E. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER REQUIREMENTS ARE AS FOLLOWS: E.A. PRECISE INDIVIDUAL STATION TIMING E.B. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES E.C. AT LEAST ONE PROGRAM FOR EACH HYDROZONE E.D. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF E.E. POWER FAILURE BACKUP FOR ALL PROGRAMMED INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO-ZONES. F. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO-ZONES. G. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% COVERAGE WITH HEAD TO HEAD SPACING OR TRIANGULAR SPACING AS APPROPRIATE. H. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES SUCH AS SIDEWALKS, DRIVEWAYS, AND PARKING AREA. I. EACH VALVE SHALL BE INSTALLED IN A VALVE BOX LARGE ENOUGH TO ALLOW FOR MAINTENANCE AND REMOVAL. ONLY ONE VALVE PER BOX. Automatic Underground Irrigation Notes: JOB N0.: CHECKED BY: SHEET NO. DRAWN BY: DATE: 121 N. 9TH ST. SUITE 401 BOISE, IDAHO 83702 (208) 639-4520 AXIOM STRUCTURAL ENGINEER 462 E. SHORE DR. SUITE 100 EAGLE, IDAHO 83616 (208) 939-4041 THE LAND GROUP CIVIL ENGINEER 420 S. ORCHARD ST. BOISE, IDAHO 83705 (208) 343-3663 CATOR, RUMA & ASSOCIATES, CO. MECHANICAL ENGINEER 408 E. PARKCENTER BLVD. STE 215 BOISE, IDAHO 83301 (208) 345-7127 EIDAM AND ASSOCIATES ELECTRICAL ENGINEER CONSULTANTS: 462 E. SHORE DR. SUITE 100 EAGLE, IDAHO 83616 (208) 939-4041 THE LAND GROUP LANDSCAPE ARCHITECT PHASE: COPYRIGHT All rights reserved. Reproduction or use in any form or by any means -- graphic, electronic, mechanical, etc. -- without written permission of LOMBARD CONRAD ARCHITECTS, P.A. is unlawful and subject to criminal prosecution. 18011.01 WEST ADA SCHOOL DISTRICT MERIDIAN HIGH SCHOOL AUDITORIUM MRK DATE DESCRIPTION TLG PN: 118074 35% CONSTRUCTION DOCUMENTS 0 20' 40' HORIZONTAL SCALE: 1"=20' Landscape Plan - Project Area L1.01 Landscape Plan - Project Area 10.22.18 MTA DL 0 20' 40' HORIZONTAL SCALE: 1"=20' Existing Tree Removal Plan 10.22.2018 R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W PINE AVENUE LINDER ROAD PROJECT AREA - SEE SHEET L1.01 LW (8) (16)AG AG (11) LW (9) AG (9) (9)LW (4)AG LW (3) 8 8 8 8 3 1 1 1 1 1 1 4 5 6 7 2 2 EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING PARKING LOT EXISTING PARKING LOT EXISTING PARKING LOT 1 1 1 1 2 2 2 2 DECIDUOUS TREES BOTANICAL NAME / COMMON NAME SIZE CONTAINER QTY REMARKS AG ACER RUBRUM `OCTOBER GLORY` TM / OCTOBER GLORY MAPLE 2" CAL. B&B 40 CLASS II BN BETULA NIGRA / RIVER BIRCH MULTI-TRUNK 2" CAL. B&B 3 CLASS II CR CERCIS CANADENSIS `RISING SUN` / RISING SUN REDBUD 3" CAL. B&B 3 CLASS I LG LIRIODENDRON TULIPIFERA `GLEN GOLD` / TULIP TREE 2" CAL. B&B 5 CLASS II LW LIQUIDAMBAR STYRACIFLUA `WORPLESDON` / WORPLESDON SWEET GUM2" CAL. B&B 29 CLASS II PLANT SCHEDULE JOB N0.: CHECKED BY: SHEET NO. DRAWN BY: DATE: 121 N. 9TH ST. SUITE 401 BOISE, IDAHO 83702 (208) 639-4520 AXIOM STRUCTURAL ENGINEER 462 E. SHORE DR. SUITE 100 EAGLE, IDAHO 83616 (208) 939-4041 THE LAND GROUP CIVIL ENGINEER 420 S. ORCHARD ST. BOISE, IDAHO 83705 (208) 343-3663 CATOR, RUMA & ASSOCIATES, CO. MECHANICAL ENGINEER 408 E. PARKCENTER BLVD. STE 215 BOISE, IDAHO 83301 (208) 345-7127 EIDAM AND ASSOCIATES ELECTRICAL ENGINEER CONSULTANTS: 462 E. SHORE DR. SUITE 100 EAGLE, IDAHO 83616 (208) 939-4041 THE LAND GROUP LANDSCAPE ARCHITECT PHASE: COPYRIGHT All rights reserved. Reproduction or use in any form or by any means -- graphic, electronic, mechanical, etc. -- without written permission of LOMBARD CONRAD ARCHITECTS, P.A. is unlawful and subject to criminal prosecution. 18011.01 WEST ADA SCHOOL DISTRICT MERIDIAN HIGH SCHOOL AUDITORIUM MRK DATE DESCRIPTION TLG PN: 118074 0 80' 160' HORIZONTAL SCALE: 1"=80' Landscape Plan - Overall L1.00 Landscape Plan - Overall 10.22.18 MTA DL 10.22.2018 4' (TYP.) 109' 6' 10' 25' 21' 25' 25' 34' 7' 18' 17' 16' 66' 17 PROPOSED AUDITORIUM BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING 17 17 17 17 17 17 8 15 5 12 12 1 2 6 1 10 12 9 13 13 7 14 3.1 3 3 14 Keynotes STANDARD CONCRETE FLATWORK Materials Legend HEAVY DUTY CONCRETE FLATWORK STANDARD CONCRETE FLATWORK WITH INTEGRAL COLOR (DAVIS COLORS DARK GRAY [IRON OXIDE] #860) LANDSCAPE AREA, SEE LANDSCAPE PLAN L1.01. 1. ADA PEDESTRIAN RAMP 2. CONTRACTOR LAY-DOWN YARD 3. EXISTING PRESSURIZED IRRIGATION LINE 3.1. PROPOSED RE-ROUTE OF PRESSURIZED IRRIGATION LINE 4. NOT USED 5. RETAIN AND PROTECT EXISTING LANDSCAPE 6. RELOCATED MHS WARRIORS BOULDER 7. PROPOSED STORMWATER INFILTRATION AREA 8. FLAG POLE TO REPLACE EXISTING AT NEW LOCATION 9. MERIDIAN CITY WATER EASEMENT - APPROXIMATE LOCATION 10. REINFORCED CONCRETE FIRE ACCESS AREA 11. NOT USED 12. SIDEWALK AND CURB TO TIE TO EXISTING 13. EXISTING PARKING LOT 14. EXISTING ASPHALT DRIVE 15. CONCRETE MOW CURB 16. NOT USED 17. FROST WALL AT ENTRANCE CALLOUT NUMBERS COORDINATED TO NUMBERED NOTES BELOW. # Sheet Notes A. BICYCLE PARKING FACILITIES CURRENTLY EXIST ON SITE AND WILL BE MAINTAINED. B. TRASH AND/OR RECYCLING ENCLOSURES CURRENTLY EXIST ON SITE AND WILL BE MAINTAINED. C. REFER TO SHEET C1.00 FOR PROJECT CALCULATIONS. D. REFER TO SHEET L1.01 FOR SPECIFICATIONS FOR UNDERGROUND IRRIGATION. JOB N0.: CHECKED BY: SHEET NO. DRAWN BY: DATE: 121 N. 9TH ST. SUITE 401 BOISE, IDAHO 83702 (208) 639-4520 AXIOM STRUCTURAL ENGINEER 462 E. SHORE DR. SUITE 100 EAGLE, IDAHO 83616 (208) 939-4041 THE LAND GROUP CIVIL ENGINEER 420 S. ORCHARD ST. BOISE, IDAHO 83705 (208) 343-3663 CATOR, RUMA & ASSOCIATES, CO. MECHANICAL ENGINEER 408 E. PARKCENTER BLVD. STE 215 BOISE, IDAHO 83301 (208) 345-7127 EIDAM AND ASSOCIATES ELECTRICAL ENGINEER CONSULTANTS: 462 E. SHORE DR. SUITE 100 EAGLE, IDAHO 83616 (208) 939-4041 THE LAND GROUP LANDSCAPE ARCHITECT PHASE: COPYRIGHT All rights reserved. Reproduction or use in any form or by any means -- graphic, electronic, mechanical, etc. -- without written permission of LOMBARD CONRAD ARCHITECTS, P.A. is unlawful and subject to criminal prosecution. 18011.01 WEST ADA SCHOOL DISTRICT MERIDIAN HIGH SCHOOL AUDITORIUM MRK DATE DESCRIPTION TLG PN: 118074 0 20' 40' HORIZONTAL SCALE: 1"=20' Site Plan - Project Area C1.01 Site Plan - Project Area 10.22.18 MTA DL 10.22.2018 31,922 SQ. FT. (GROSS) PROPOSED BUILDING TOTAL 373,142 SQ. FT. (GROSS) Keynotes CALLOUT NUMBERS COORDINATED TO NUMBERED NOTES BELOW. 1. APPROXIMATE CENTER LINE OF NINE MILE CREEK 2. APPROXIMATE PROPERTY LINE OF MERIDIAN HIGH SCHOOL (FENCE LINE) 3. PROPOSED 14' PEDESTRIAN PATHWAY EASEMENT BOUNDARY 4. APPROXIMATE BOUNDARY OF NAMPA-MERIDIAN IRRIGATION DISTRICT EASEMENT 5. PROPOSED LOCATION OF TREE MITIGATION AS PATHWAY ENHANCEMENT 6. PROPOSED LOCATION OF TREE MITIGATION AS LINDER ROAD BUFFER 7. PROJECT AREA - REFER TO SHEET C1.01. 8. APPROXIMATE LOCATION OF MERIDIAN CITY WATER EASEMENT # Sheet Notes A. REFER TO SHEET C1.01 FOR ADDITIONAL INFORMATION. 0 80' 160' HORIZONTAL SCALE: 1"=80' Site Plan - Overall JOB N0.: CHECKED BY: SHEET NO. DRAWN BY: DATE: 121 N. 9TH ST. SUITE 401 BOISE, IDAHO 83702 (208) 639-4520 AXIOM STRUCTURAL ENGINEER 462 E. SHORE DR. SUITE 100 EAGLE, IDAHO 83616 (208) 939-4041 THE LAND GROUP CIVIL ENGINEER 420 S. ORCHARD ST. BOISE, IDAHO 83705 (208) 343-3663 CATOR, RUMA & ASSOCIATES, CO. MECHANICAL ENGINEER 408 E. PARKCENTER BLVD. STE 215 BOISE, IDAHO 83301 (208) 345-7127 EIDAM AND ASSOCIATES ELECTRICAL ENGINEER CONSULTANTS: 462 E. SHORE DR. SUITE 100 EAGLE, IDAHO 83616 (208) 939-4041 THE LAND GROUP LANDSCAPE ARCHITECT PHASE: COPYRIGHT All rights reserved. Reproduction or use in any form or by any means -- graphic, electronic, mechanical, etc. -- without written permission of LOMBARD CONRAD ARCHITECTS, P.A. is unlawful and subject to criminal prosecution. 18011.01 WEST ADA SCHOOL DISTRICT MERIDIAN HIGH SCHOOL AUDITORIUM MRK DATE DESCRIPTION TLG PN: 118074 C1.00 Site Plan - Overall 10.22.18 MTA DL 10.22.2018