Loading...
Sprint Collocation Ustick and Meridian CZC (A-2018-0344)Conditions Document 1 Sprint - DES, CZC - A-2018-0344 CERTIFICATE OF ZONING COMPLIANCE REPORT DATE: November 27, 2018 TO: Tracy Hermann, Centerline Solutions FROM: Kevin Holmes, Assistant City Planner SUBJECT: Sprint Wireless Collocation- DES, CZC (A-2018-0344) University Christian Church OWNER: DESCRIPTION OF APPLICANT'S REQUEST The applicant, Tracy Hermann on behalf of Sprint Wireless, requests Certificate of Zoning Compliance (CZC) and Design Review (DES) approval to collocate six (6) antennas and nine (9) radios to an existing 100’ wireless tower. The applicant will also be acquiring additional fenced ground space to install two (2) outdoor cabinets on a new 8'x8' concrete equipment platform. The site is located on 5.46 acres of land in the L-O zoning district at 201 W. Ustick Road. DECISION The applicant's request for Certificate of Zoning Compliance and Design Review is approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. Site Conditions of Approval 1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B. Process Conditions of Approval 1. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 3. The site plans prepared by Sprint on October 12, 2018 are approved by the City of Meridian Planning Division as shown in Exhibit B. 4. The elevations prepared by Sprint on October 12, 2018, labeled Elevations & Antenna Plan, are approved by the City of Meridian Planning Division as shown in Exhibit C. 5. The approved site plan and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 6. The applicant shall pay any applicable impact fees prior to the issuance of a building Conditions Document 2 Sprint - DES, CZC - A-2018-0344 permit. 7. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. Ongoing Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (CZC-13-113, CZC-14-060, and CZC-16-0307). 3. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 5. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 6. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. 7. The applicant and/or assigns shall have the continuing obligation to meet the specific use standards for wireless communication facilities as set forth in UDC 11-4-3-43. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before December 12, 2018, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. EXPIRATION The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until November 27, 2019. EXHIBITS A: Vicinity Map B: Site Plans (dated: October 12, 2018) C: Elevations (dated: October 12, 2018) Conditions Document 3 Sprint - DES, CZC - A-2018-0344 Exhibit A: Vicinity Map Conditions Document 4 Sprint - DES, CZC - A-2018-0344 Exhibit B: Site Plans (dated: October 12, 2018) Conditions Document 5 Sprint - DES, CZC - A-2018-0344 Exhibit C: Elevations (dated: October 12, 2018)