Loading...
CC - Staff ReportSTAFF REPORT COMMUNITY DEVELOPMENT DEPARTMENT HEARI NG 2/5/2019 DATE: TO: Mayor & City Council FROM: Stephanie Leonard, Associate Planner 208-884-5533 SUBJECT: H-2019-0002 Cope Collision LOCATION: 1724 E. Franklin Rd., in the SW 1/4 of Section 8, Township 3N., Range IE. 1 eln") .Yy7f_71M[17 1 The Applicant requests a modification to the existing Development Agreement (DA) to revise the building elevations from those approved with the original agreement. II. SUMMARY OF REPORT A. Project Summary Acreage Future Land Use Designation Existing Land Use Proposed Land Use(s) Current Zoning Physical Features (waterways, hazards, flood plain, hillside) Neighborhood meeting date; # of attendees: History (previous approvals) Details 1.73 Industrial Undeveloped Vehicle repair, accessory outdoor storage I -L None December 17, 2018; 0 attendees H-2017-0157, DA Inst. No. 2018-027680; H-2017-0121 — Page 1 B. Project Area Maps Future Land Use Map Legend Project Location MU. Aerial Map Zoning Map R-40 Legend �ProjectLccation R-15 R -4d R4 Iffau-1 R-15 K-4 RLR R-, S�RLR C -N C-CR-4 G RUT M R6 I -L C -G R, R1= RUT L -D C -C I -L • - • • �>�- . -IIS 11 NNIIIIII�I I yam.. L-O`er RUT r L -D -G R1 I -L III. APPLICANT INFORMATION A. Applicant/Owner: Mussell Construction, Inc. 320 11' Avenue South Nampa, Idaho 83651 B. Representative: Network Architects 2517 W. Neff Court Boise, Idaho 83702 Page 2 0 IV. NOTICING City Council PostinLy Date Newspaper Notification 1/18/2019 Radius notification mailed to properties within 300 feet 1/15/2019 Public hearing notice sign posted 1/18/2019 Nextdoor posting 1/15/2019 V. STAFF ANALYSIS The development agreement modification proposes to allow the applicant to construct a building differing in appearance from the elevations approved with the existing development agreement [i.e. Inst. #2018-027680, H-2017-0157 Kobe -Cope CPAM and RZ] and enter into a modified development agreement for the proposed development. The original elevations included steel panels with extensive glass storefront and overhead doors. The applicant is requesting a modification to those elevations to replace the northern storefront glass component with a primarily stucco exterior, with glass roll -up doors to access vehicle repair bays on the west side of the site (see Exhibit VII.B). Below, staff has provided some analysis on how the proposed elevations comport to the commercial standards of the Architectural Standards Manual (ASM). It is important to note the elevations as proposed do not meet all of the requirements and further refinement is needed as outlined below. If the elevations are revised as recommended by staff, staff is of the opinion that the proposed elevations no longer need to be referenced as an Exhibit in the amended development agreement. A. Structure and Design Standards (UDC 11-3A-19 J Architectural Standards Manual): Conceptual building elevations were submitted for the future facility as shown in Exhibit VII.B. Final design of the structure should be consistent with the design standards listed in the Architectural Standards Manual for commercial districts per the recorded development agreement. The proposed conceptual elevations for the north and west elevations appear to generally comply with a majority of the design standards in UDC 11-3A-19 and the ASMfor commercial districts. Action items that need to be revised or further clarified are detailed below. ASMAction Item #3.2A: requires that at least 30% of applicable facades use a variety of techniques around the base of the building to visually anchor the building to the ground. The submitted conceptual elevations do not appear to meet this goal and shall be revised to comply; the revision shall be submitted with the CZC and DES application. ASMAction Items #5.1B, #53D, and #5.1E: action items within Goal 5.10 require that building design incorporate complementary material combinations, including: the use of at least two (2) distinct field materials, colors, or material -color combinations on the building fagade; incorporation of an accent material on the first story; and distinguishing field materials from accent materials. The submitted conceptual elevations depict one field material (stucco) in two (2) shades of gray. Staff recommends the applicant provide an additional field material from the basic categories specified in the ASM (wood, masonry, concrete, metal and glazing). Elevations for the south and east facades of the building were not submitted with this application. Scalable elevations for all sides of the building shall be submitted with the CZC and DES application and shall comply with the design standards listed in UDC 11-3A-19 and the ASMfor commercial districts. Page 3 Several buildings in the vicinity of the subject property have incorporated multiple field materials mentioned above. The building across N. Nola Rd. (Driven Automotive) incorporates stucco, metal accents and awnings, glass and stone veneer (see Exhibit VII.C). If additional field materials are incorporated as recommended by staff, the proposed building would complement other buildings in the surrounding area. Staff originally recommended the building comply with commercial design standards to establish a cohesive and attractive character for the Franklin corridor. B. Outdoor Storage In accord with UDC 11 -3A -14D, outdoor storage of materials, equipment, inventory, and/or supplies shall be incorporated into the overall design of building and site landscaping so that the visual impacts of these functions are fully contained and screened from view of adjacent nonindustrial properties and/or public streets by a solid fence and/or wall with a minimum height of six feet (6'). Such fence and/or wall shall be constructed of complementary or of similar design and materials of the primary structure. A detail of proposed fencing shall be submitted with the CZC and DES application. C. Certificate of Zoning Compliance and Design Review A Certificate of Zoning Compliance (CZC) and Design Review (DES) application is required to be submitted and approved prior to submittal of a building permit application. The proposed plans (see Exhibit VII.B) have already been submitted with a CZC and DES application to the Planning Division, however, approval cannot be issued until this subject MDA application is concluded. If Council decides that the proposed elevations should be modified to include an additional field material and banding around the bottom of the building the applicant shall submit revised plans to the Planning Division prior to CZC approval. A. Staff: Staff recommends approval of the proposed modifications to the Development Agreement in accord with the provisions in Section VIII.A. Page 4 MAI= 0114 is I11111V A. Approved Elevations Exhibit A Exhibit A.5: Proposed Building Elevations Page 5 amp B. Proposed Elevations Page 6 C. Driven Automotive Building ra a e a0UTH �7. �� . E �-om , RENDERING EAST NORTH-EAST RENDERING 41�AO=UTH ELEVATION ! ELEVATION NORT" ELEVATION 2 _= r_«f Page VIII. CITY/AGENCY COMMENTS & CONDITIONS A. PLANNING 1. Development Agreement Modification 1.1 The existing DA shall be amended to reflect the new provisions and conceptual elevations for the subject property. CONDITIONS GOVERNING DEVELOPMENT OF SUBJECT PROPERTY: a. 5.1 Owner and/or Developer shall develop the Property in accordance with the following special conditions: Development of this site shall substantially comply with the design standards listed in UDC 11-3A-19; the guidelines contained in the Architectural Standards Manual, the site plan and building elev ieas in Exhi b. This property is subject to the conditions of approval of the Madden Subdivision (H- 2017-0121) c. All future development of the subject property shall comply with City of Meridian ordinances in effect at the time of development. d. Certificate of Zoning Compliance and Administrative Design Review applications area required to be submitted to the Planning Division for approval of all future buildings/uses on the site, prior to applying for building permit. e. The applicant shall comply with the accessory outdoor storage standards set forth in UDC 11-3A-14. £ Any structures built on the property shall conform to the commercial standards in the City of Meridian Architectural Standards Manual, sbecificallX: i. Building elevations shall incorporate banding around the base of the building in accord with ASM Action Item #3.2A. ii. Building elevations shall incorporate an additional field material from the basic categories as specified in ASM (wood, masonry, concrete, metal andlg azing) in accord with ASM Action Items #5.1B. #5.1D. and #5.1E. B. Nampa & Meridian Irrigation District (NMID) http://weblink.meridiancity.otylweblink8/0/doc/160515/Pa el�.aspx Page 8