Loading...
Caven Ridge Estates West Subdivision No. 1 H-2018-0134 MFP ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR CAVEN RIDGE ESTATES WEST SUB 1 – MFP H-2018-0134 Page 1 of 3 BEFORE THE MERIDIAN CITY COUNCIL HEARING DATE: DECEMBER 18, 2018 IN THE MATTER OF THE REQUEST FOR FINAL PLAT MODIFICATION TO CHANGE THE LOCATION OF THE MICR- PATH FROM THE LOCATION REQUIRED WITH PREVIOUS ENTITLEMENTS FOR CAVEN RIDGE ESTATES WEST SUBDIVISION NO. 1 BY: WENDY SHRIEF, JUB ENGINEERS APPLICANT ) ) ) ) ) ) ) ) ) ) ) ) ) CASE NO. H-2018-0134 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT This matter coming before the City Council on December 18, 2018 for final plat approval pursuant to Unified Development Code (UDC) 11-6B-3 and the Council finding that the Administrative Review is complete by the Planning and Development Services Divisions of the Community Development Department, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat, the Council takes the following action: IT IS HEREBY ORDERED THAT: 1. The Final Plat of “PLAT SHOWING CAVEN RIDGE ESTATES WEST SUBDIVISION NO. 1, SITUATED IN THE NORTHWEST QUARTER OF SECTION 30, TOWNSHIP 3 NORTH, RANGE 1 EAST, BOISE MERIDIAN, CITY OF MERIDIAN, ADA COUNTY, IDAHO, 2018, HANDWRITTEN Meridian City Council Meeting Agenda January 8, 2019 – Page 5 of 363 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR CAVEN RIDGE ESTATES WEST SUB 1 – MFP H-2018-0134 Page 2 of 3 DATE: 9/28/2018, by MICHAEL S. BYRNS, PLS, SHEET 1 OF 7,” is conditionally approved subject to those conditions of Staff as set forth in the staff report to the Mayor and City Council from the Planning and Development Services divisions of the Community Development Department dated December 18, 2018, a true and correct copy of which is attached hereto marked “Exhibit A” and by this reference incorporated herein, and the response letter from Wendy Shrief, JUB Engineers, a true and correct copy of which is attached hereto marked “Exhibit B” and by this reference incorporated herein. 2. The final plat upon which there is contained the certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City’s requirements shall be signed only at such time as: 2.1 The plat dimensions are approved by the City Engineer; and 2.2 The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash surety has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified that pursuant to Idaho Code § 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at Meridian City Council Meeting Agenda January 8, 2019 – Page 6 of 363 issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an interest in real property which may be adversely affected by this decision may, within twenty- eight (28) days after the date of this decision and order, seek a judicial review pursuant to Idaho Code§ 67-52. By action of the City Council at its regular meeting held on the day of � hn Lto ru 1-2 - 20 I q By: W rd Attest: o Aucvsl � Mayor, City of e idian 0 _ ID1,A o Jay Cole My Clerk Copy served upon the Applicant, Planning and Development Services Divisions of the Community Development Department and City Attorney. By: r �QYI� ( Dated: ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR CAVEN RIDGE ESTATES WEST SUB 1 — MFP H-2018-0134 Page 3 of 3 Page 1 HEARING DATE: 12/18/2018 TO: Mayor & City Council FROM: Sonya Allen, Associate Planner 208-884-5533 SUBJECT: H-2018-0134 Caven Ridge Estates West Sub. 1 LOCATION: South of E. Victory Rd. and west of S. Standing Timber Way, in the NW ¼ of Section 30, T.3N., R.1E. I. PROJECT DESCRIPTION Final plat modification to change the location of the micro-path from the location required with previous entitlements. II. SUMMARY OF REPORT A. Project Summary STAFF REPORT COMMUNITY DEVELOPMENT DEPARTMENT Description Details Page Acreage 7.74 Future Land Use Designation MDR (medium density residential) Existing/Proposed Land Use(s) In development process – approved for single-family homes Current Zoning R-8 Proposed Zoning NA History (previous approvals) H-2017-0156; H-2018-0045 EXHIBIT A Meridian City Council Meeting Agenda January 8, 2019 – Page 8 of 363 Page 2 B. Project Area Maps III. APPLICANT INFORMATION A. Applicant: Wendy Shrief, J-U-B Engineers, 250 S. Beechwood Ave., Ste. 201, Boise, ID 83709 B. Owner: New Cavanaugh, LLC, 3327 N. Eagle Rd., Ste. 110, Meridian, ID 83646 C. Representative: Same as Applicant Future Land Use Map Aerial Map Zoning Map Planned Development Map Meridian City Council Meeting Agenda January 8, 2019 – Page 9 of 363 Page 3 IV. STAFF ANALYSIS The final plat approval for Caven Ridge Estates West Subdivision No. 1 included a condition of approval (site specific #4c) for the plat to be revised to relocate the common lot with the pathway depicted between Lots 3 and 5, Block 1 to align with the pathway depicted on the south side of E. Sicily Dr. within Lot 6, Block 3 (either between Lots 7 and 8 or Lots 8 and 9, Block 1; and a condition of approval (site specific #5d) for the landscape plan to be revised to relocate the common lot with the pathway depicted between Lots 3 and 5, Block 1 to align with the pathway depicted on the south side of E. Sicily Dr. within Lot 6, Block 3 (either between Lots 7 and 8 or Lots 8 and 9, Block 1). See plat and landscape plan below in Section VI.A. The applicant proposes to modify this entitlement to shift the pathway on the north side of E. Sicily Dr. approximately 200’ to the east between Lots 3 and 5, Block 1 to align with the sidewalk on S. Natural Way. The pathway has already been constructed in this location along with the infrastructure and streets for the subdivision. Relocation of the pathway to the west would result in the shifting of 4 residential lots and relocation of previously constructed water and sewer services for those lots. Eight (8) cuts would also need to be made in the newly constructed street and sidewalks to relocate the services. Due to weather conditions, it’s unlikely the cut areas could be repaved until Spring. The purpose of the condition was so that the micro-path connections on the north and south sides of Sicily Dr. would align for a more direct and clear connection to the multi-use pathway. As proposed, the pathway on the north side of Sicily jogs approximately 200’ to the east. Although not ideal, it’s Staff’s opinion the location of the pathway as constructed meets the intent of the conditions of approval in providing a micro-path connection to the multi-use pathway along the Ridenbaugh Canal. Therefore, Staff is in support of the Applicant’s request. In the future, if improvements are constructed prior to obtaining the City Engineer’s signature on the final plat, the Applicant should take extra care in reviewing the conditions of approval prior to construction to ensure improvements are constructed as required. As an extra precaution, revised plans can be submitted for review and approval prior to submittal of the final plat for signature to ensure compliance with previous conditions of approval. V. DECISION A. Staff: Staff recommends approval of the proposed final plat modification as requested by the Applicant. Meridian City Council Meeting Agenda January 8, 2019 – Page 10 of 363 Page 4 VI. EXHIBITS A. Previously Approved Final Plat and Landscape Plan Meridian City Council Meeting Agenda January 8, 2019 – Page 11 of 363 Page 5 If plans were revised and pathway constructed as required, it would have looked like this: Meridian City Council Meeting Agenda January 8, 2019 – Page 12 of 363 Page 6 B. As-Built Landscape Plan (stamped date: 11/9/2018) Meridian City Council Meeting Agenda January 8, 2019 – Page 13 of 363 From:Wendy Shrief To:Sonya Allen ; C.Jay Coles; Charlene Way ; Chris Johnson Cc:Brady Lasher (brady@lasherenterprises.com); Bill Parsons Subject:RE: Caven Ridge Estates West Sub. 1 - MFP H-2018-0134 Staff Report for 12/18 Council Mtg Date:Friday, December 14, 2018 11:46:54 AM Attachments:image007.png image013.png Sonya, We are in  agreement  with the  staff report  and we would  appreciate  being  moved  to the  consent agenda.  And  Merry  Christmas! Wendy Wendy  Kirkpatrick  Shrief, AICP Planner J-U-B ENGINEERS, Inc. 250 S. Beechwood  Avenue, Suite  201, Boise, ID  83709 e wshrief@jub.com  w  www.jub.com p 208 376 7330  c 208 559 1760 From: Sonya  Allen  <sallen@meridiancity.org>  Sent: Thursday, December  13, 2018  10:33  AM To: C.Jay  Coles  <cjcoles@meridiancity.org>; Charlene Way <cway@meridiancity.org>; Chris  Johnson <cjohnson@meridiancity.org> Cc: Wendy Shrief <wshrief@jub.com>; Brady Lasher  (brady@lasherenterprises.com) <brady@lasherenterprises.com>; Bill Parsons  <bparsons@meridiancity.org> Subject: Caven Ridge  Estates  West  Sub. 1 - MFP  H-2018-0134 Staff Report  for  12/18 Council Mtg Attached is  the  staff report  for  the  proposed final plat  modification for  Caven Ridge  Estates  West Sub. 1. This  item is  scheduled to be  on the  Council  agenda  on December 18 th . The  public  hearing will  be  held  at City Hall, 33  E. Broadway  Avenue, beginning  at 6:00 pm. Please call  or e-mail with any questions. Wendy - Please submit  any  written  response  you  may have to the  staff report  to the  City Clerk’s office (cityclerk@meridiancity.org ) and me  as soon  as possible. Thanks, EXHIBIT B Meridian City Council Meeting Agenda January 8, 2019 – Page 14 of 363 Sonya Allen | Associate Planner City of  Meridian  | Community  Development  Dept. 33  E. Broadway  Ave., Ste. 102, Meridian, Idaho  83642 Phone: 208-884-5533  | Fax: 208-489-0578 Built for Business, Designed for Living      All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law, in regards to both release and retention, and may be released upon request, unless exempt from disclosure by law.   This e-mail and any attachments involving J-U-B or a subsidiary business maycontain information that is confidential and/or proprietary. Prior to use, you agree tothe provisions found on the Electronic Documents/Data License, which can beaccessed from the footer on the J-U-B home page. If you believe you received thisemail in error, please reply to that effect and then delete all copies. Meridian City Council Meeting Agenda January 8, 2019 – Page 15 of 363