Loading...
181029_ADR Packet Revisions_Garage Doors katerra.com Memo October 29, 2018 Revision to Approved Administrative Design Review Packet A-2017-0228 Dear Stephanie, As follow-up to our recent correspondence we are submitting revised exterior building elevations for the tenant garages and maintenance building to reflect deletion of the two horizontal windows at the top section of the garage doors. This is consistent with the Owner’s current program for maintenance and security. Attached please find the following drawings: Tenant Garage Building Elevations (first page of the attachment): · Front Elevation for 6-Bay Garage o Revisions are clouded · Front and Rear Elevations for 8-Bay Garage o Revisions are clouded Maintenance Building (second page of the attachment): · Front Elevation o Revision is clouded Please contact me directly should questions arise. Regards, Lisa Kirby, AIA, LEED AP Project Lead KATERRA 542 1 st Ave South, Floor 4 Seattle, WA 98104 C: +1 206-419-5961 To: Stephanie Leonard cc: Bill Parsons From: Lisa Kirby Re: Revision to Approved ADR Packet Ro o f S h i n g l e s Ro o f S h i n g l e s 3/ 4 ” B o a r d a n d B a t t e n 1 1 / 2 “ B o a r d a n d B a t t e n Bo a r d a n d B a t t e n LE F T E L E V A T I O N SC A L E : 3 / 3 2 ” = 1 ’ - 0 ” F R O N T E L E V A T I O N SC A L E : 3 / 3 2 ” = 1 ’ - 0 ” RE A R E L E V A T I O N SC A L E : 3 / 3 2 ” = 1 ’ - 0 ” RI G H T E L E V A T I O N SC A L E : 3 / 3 2 ” = 1 ’ - 0 ” Ro o f S h i n g l e s Ro o f S h i n g l e s Bo a r d a n d B a t t e n Bo a r d a n d B a t t e n LE F T E L E V A T I O N SC A L E : 3 / 3 2 ” = 1 ’ - 0 ” F R O N T E L E V A T I O N SC A L E : 3 / 3 2 ” = 1 ’ - 0 ” RE A R E L E V A T I O N SC A L E : 3 / 3 2 ” = 1 ’ - 0 ” R I G H T E L E V A T I O N SC A L E : 3 / 3 2 ” = 1 ’ - 0 ” PR I M A R Y WA L L T Y P E ha r d i e b o a r d + b a t e n GA R A G E DO O R T Y P E st a n d a r d r i b b e d d o o r G A R A G E E L E V A T I O N S RO O F T Y P E co m p o s i t e s h i n g l e GU T T E R S + DO W N S P O U T S re c t a n g u l a r PR O G R A M M I N G LI N D E R & O V E R L A N D - S O U T H R I D G E DE S I G N R E V I E W P A C K E T REVISED 10/26/18 REVISED 10/29/18 REVISED 10/29/18