Loading...
CS101_SITE PLANW W W W SS S S GA S TEL TEL TEL W W W W W ROW ROW ROW ROW 2 5 9 4 . 0 2 5 9 4 . 0 2 5 9 3 . 5 25 9 3 . 5 2 5 9 3 . 0 25 9 3 . 0 2 5 9 2 . 5 2 5 9 2 . 5 2 5 9 2 . 5 25 9 2 . 5 25 9 2 . 0 25 9 2 . 0 2 5 9 1 . 5 25 9 1 . 5 2 5 9 1 . 0 25 9 1 . 0 2590.5 25 9 0 . 5 2590.0 25 9 0 . 0 258 9 . 5 25 8 9 . 5 W. ARCHERFIELD ST. N. M E R I D I A N R D . LA N D S C A P E B U F F E R BUILDING 100' X 60' 9,000 SQ FT / 1 STALL PER 500 = 18 PARKING STALLS SI D E W A L K PLANTER SIDEWALK ENTRANCE ENTRANCE PL A N T E R S S W W W P I R R P I R R P I R R P I R R P I R R P I R R P I R R P I R R PIRRPIRRPIRRPIRRPIRR SD SD SD SD (SCALE IN FEET) 1:30 (22x34 FULL SIZE)30 15 90300 SITE MAP 9.00' 45.00' 25.00' EXISTING LANDSCAPING EXISTING SIDEWALK 1 5 5 4 NEW APPROACH TYP. ISPWC SD-710A REGRADE AND RELANDSCAPE BERM 8 30.00' 6.00' 26.26'25.00' 5.00' CALCULATIONS TABLE #OF STALLS REQUIRED #OF STALLS PROVIDED NON-ADA #OF BICYCLE STALLS REQUIRED #OF BICYCLE STALLS PROVIDED BUILDING SIZE LOT SIZE EASEMENTS AS SHOWN ON PLANS SETBACKS AS SHOWN ON PLANS 26,204SF 9,000SF 1;1 BICYCLE PARKIGN FOR EVERY 25 VEHICLE PARKING 18;1 SPACE FOR EVERY 500SF OF GROSS FLOOR AREA #OF STALLS PROVIDED ADA 1;1 FOR EVERY 25 VEHICLE PARKING 22 2 25' LANDSCAPE BUFFER 10' X 73' ACHD DRAINAGE EASEMENT 10' LANDSCASPE BUFFER BICYCLE RACK NEW SIDEWALK 19.00' 25.00' 25.24' 17.00' 7.00' 5.00' October 2018 PL O T T E D B Y : CA L E B K E N Y O N DA T E P L O T T E D : 10 / 2 2 / 2 0 1 8 1 1 : 1 7 : 4 0 A M PA T H : A: \ A B C O E N G I N E E R I N G \ J O B S L A N D E D \ 1 8 4 6 2 9 - - B L A I R T I N G E Y O F F I C E ( M C C A R T E R M O O R H O U S E ) \ 0 0 A B C O C A D \ 1 8 - 4 6 2 9 - 1 1 - C S - 1 0 1 - C Z C . D W G FILE NUMBER: SHEET NUMBER: DESIGNED BY: DATE DE S C R I P T I O N DA T E RE V I S I O N S BY NO . DRAWN BY: AB C O EN G I N E E R I N G 119 N. Midland Blvd. Nampa, Idaho 83651 Phone (208) 955-8126 W. A R C H E R F I E L D S T R . & N . M E R I D A I N R D . A. LYMAN CS-101 ME R I D I A N , I D A H O SI T E M A P MC C A R T E R M O O R H O U S E 1 FO 4 AD A C O U N T Y BL A I R T I N G E Y O F F I C E J. MATTHEWS 18-4629 1.THE TOPOGRAPHIC SURVEY WAS PERFORMED BY EAGLE LAND SURVEYING, SEPTEMBER 2018. 2.ALL CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE 2012 ISPWC (IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION). 3.THE CONTRACTOR SHALL CONSTRUCT ALL NEW FACILITIES BOTH INSIDE AND OUTSIDE OF BUILDINGS TO MEET OR EXCEED ADA STANDARDS. 4.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE. THE CONTRACTOR SHALL FIELD VERIFY ELEVATIONS OF EXISTING MATCH POINTS PRIOR TO CONSTRUCTION. ANY CHANGES WHICH DEVIATE FROM THESE PLANS MUST BE APPROVED PRIOR TO CONSTRUCTING. 5.ONLY APPROVED PLAN SETS SHALL BE USED BY THE PROJECT CONTRACTOR AND SHALL BE KEPT ON SITE AT ALL TIMES. 6.THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK NECESSARY FOR FINAL ACCEPTANCE OF WORK FROM OWNER OR ANY OTHER GOVERNING AGENCY INCLUDING BUT NOT LIMITED TO AS-BUILT DRAWINGS, INSPECTIONS, TESTING REPORTS, AND CERTIFICATIONS. 7.CONTRACTOR SHALL OBTAIN ALL APPLICABLE CONSTRUCTION PERMITS. THE CONTRACTOR IS RESPONSIBLE FOR ANY NECESSARY PERMITS AND FEES. 8.THE COST OF VARIOUS FENCE, GUARD RAIL, LANDSCAPING, IRRIGATION SYSTEM, MAILBOX, SIGN, ETC. REMOVAL AND REPLACEMENT SHALL BE CONSIDERED INCIDENTAL TO THE COST OF THIS PROJECT. 9.ALL ASPHALT MATCH LINES FOR PAVEMENT REPAIR OR REPLACEMENT SHALL BE PARALLEL TO THE CENTERLINE OF THE STREET AND INCLUDE ANY AREA DAMAGED BY EQUIPMENT DURING CONSTRUCTION. 10.THE CONTRACTOR SHALL PROVIDE OR MAINTAIN ALL EXISTING DRAINAGE FACILITIES WITHIN THE CONSTRUCTION AREA UNTIL THE DRAINAGE IMPROVEMENTS ARE IN PLACE AND FUNCTIONING. 11.ALL CONTRACTORS WORKING WITHIN THE PROJECT BOUNDARIES ARE RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE SAFETY LAWS OF ANY JURISDICTIONAL BODY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BARRICADES, SAFETY DEVICES AND CONTROL OF TRAFFIC WITHIN AND AROUND THE CONSTRUCTION AREA. 12.THE CROSS SLOPE OF ALL SIDEWALKS SHALL NOT EXCEED 2% (1.75% IS TARGET). GENERAL NOTES LEGEND CENTER LINE EDGE OF PAVEMENT EDGE OF GRAVEL FENCE LINE GAS LINE OVERHEAD POWER LINE PROPERTY LINE STORMDRAIN LINE SEWER LINE TELEPHONE LINE WATER LINE PRESSURE IRRIGATION LINE GRADE BREAK LINE BENCH MARK BM ELEVATION EL EXISTING EX FINISH GRADE FG GRADE BREAK GB INVERT INV MATCH MA RADIUS R RIM OF FEATURE RIM TOP OF CONCRETE TC TOP OF PAVEMENT TA WATER METER WM ASPHALT PAVEMENT CONCRETE EP EP EG EG X X GAS GAS OHP SD SD SS SS TEL TEL W W PIRR PIRR CALL BEFORE YOU DIG! 1.THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INFORM ALL UTILITY COMPANIES OF THE CONSTRUCTION SCHEDULE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL DAMAGE WHICH MAY OCCUR BY FAILURE TO EXACTLY LOCATE AND PROTECT ALL UTILITIES. 2.CONTRACTOR SHALL CONTACT DIGLINE 48 HOURS PRIOR TO ANY EARTH DISTURBING ACTIVITIES ON SITE, AND REQUEST LOCATE OF UNDERGROUND UTILITIES. *The 811 logo is a registered trademark of the CGA. Know what's below. before you dig.CallR DEVELOPER MCCARTER-MOORHOUSE 3536 W. RYDER CUP DRIVE, MERIDIAN ID 83646 208-908-1332