Loading...
Paramount Storage CZC DES (A-2018-0190)Conditions Document 1 Paramount Storage A-2018-0190 CERTIFICATE OF ZONING COMPLIANCE REPORT DATE: August 7, 2018 TO: Kameron Nauahi FROM: Josh Beach, Associate City Planner SUBJECT: Paramount Storage – A-2018-0190 OWNER: Brighton Development, Inc. DESCRIPTION OF APPLICANT’S REQUEST The applicant requests Certificate of Zoning Compliance (CZC), Administrative Design Review (DES) to construct a 63,825 square foot self-service storage facility in a C-G zoning district. The subject site will develop with eleven (11) enclosed storage buildings, and an approximately 800 square foot office building and associated site/landscape improvements. The site is located at 5100 N. Dyver Avenue. DECISION The applicant’s request for CZC and DES are approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. As part of the application submittal, you will need to provide one set of the final, stamped “approved” Planning Department plans, stamped and signed by the architect and/or civil engineer as applicable. You must provide these plans in PDF format and hardcopy as specified in the Building Services “Plan Intake Checklist” and include them with your building submittal set. Please contact Building Services for additional details about building permits and inspections. Site Specific Conditions of Approval 1. The emergency gate access shall be constructed with solid material, but the main gate shall be allowed to be a non-sight obscuring material. 2. All ground level mechanical equipment shall be screened to the height of the unit as viewed from the property line in accord with UDC 11-3A-19A.1e. 3. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer’s expense. Final design shall be submitted as part of the development plan set for approval. Applicant shall also include the location of any existing street lights in the development plan set. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor’s work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. 4. The applicant shall construct all fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-4-3-34. 5. Construct a 20-foot wide landscape buffer adjacent to E. Ensenada Drive in accord with UDC 11-3B-7C and UDC 11-2B-3. The site plan indicates a 17.21 foot landscape buffer. Conditions Document 2 Paramount Storage A-2018-0190 The applicant shall revise the landscape plan to match the site plan and present the revised plan to staff at the time of building permit application. 6. Future development of the site shall be consistent with the design standards listed in UDC 11-3A- 19 and the guidelines in the Architectural Standards Manual. 7. Prior to application for a building permit, the applicant shall finalize the property boundary adjustment for the property. Process Conditions of Approval 1. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 3. Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A. 4. The site plan prepared Civil Site Works, dated 08/02/2018, labeled Sheet SP100 is approved by the City of Meridian Planning Division as shown. 5. The landscape plan prepared by KM Engineering, dated 02/08/2018, labeled Sheet L1.0 is approved by the City of Meridian Planning with the following changes: a. Construct a 20-foot wide landscape buffer adjacent to E. Ensenada Drive in accord with UDC 11-3B-7C and UDC 11-2B-3. The site plan indicates a 17.21 foot landscape buffer. The applicant shall revise the landscape plan to match the site plan and present the revised plan to staff at the time of building permit application. 6. Per UDC 11-3B-5 regarding mulching: Use of mulch, organic or rock, as the only ground cover in required planting areas is prohibited. Pea gravel, drain rock, road base gravel, and similar products shall not be used as mulch. All mulch shall be contained by a curb or other edging material to contain the mulch and prevent it from migrating to adjacent surfaces. 7. The elevations prepared by DOMUM Architecture, dated 12/12/2017, are approved by the City of Meridian Planning Division with the following changes: a. Per UDC 11-4-3-34 all fencing proposed for a storage use must be a solid material in order to completely screen the site from view. The applicant shall revise the exterior elevations to meet this requirement and shall present a revised plan to staff at the time of building permit application. 8. The approved site plan, landscape plan and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 9. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 10. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. Conditions Document 3 Paramount Storage A-2018-0190 11. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. Ongoing Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (H-2017-0007). 3. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 4. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 5. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. The outdoor lighting shall have downward shielding on the building and perimeter lighting and shall not impact the surrounding property owners. 6. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11- 3A-3. 7. The applicant and/or assigns shall have the continuing obligation to meet the specific use standards for the proposed use as set forth in UDC 11-4-3-34 Storage Facility, Self-Service; and the standards for unattended self-service uses listed in UDC 11-3A-16. 8. The applicant shall have an ongoing obligation to maintain all pathways. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Department on or before August 22, 2018, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11- 5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. Conditions Document 4 Paramount Storage A-2018-0190 EXPIRATION Certificates of Zoning Compliance issued in conjunction with a proposed use shall expire if said use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. Certificates of Zoning Compliance issued in conjunction with construction or alteration of a structure shall expire if said construction or alteration has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until August 7, 2019 EXHIBITS A. Vicinity Map B. Site Plan (dated: 8/2/2018) C. Landscape Plan (dated: 2/8/2018) D. Building Elevations (dated: 12/12/2017) Conditions Document 5 Paramount Storage A-2018-0190 A. Vicinity Map Conditions Document 6 Paramount Storage A-2018-0190 a. Site Plan (dated: 8/2/2018) Conditions Document 7 Paramount Storage A-2018-0190 C. Landscape Plan (dated: 2/8/2018) Conditions Document 8 Paramount Storage A-2018-0190 D. Building Elevations (dated: 12/12/2017) Conditions Document 9 Paramount Storage A-2018-0190 Conditions Document 10 Paramount Storage A-2018-0190 Conditions Document 11 Paramount Storage A-2018-0190 Conditions Document 12 Paramount Storage A-2018-0190 Conditions Document 13 Paramount Storage A-2018-0190 Conditions Document 14 Paramount Storage A-2018-0190 Conditions Document 15 Paramount Storage A-2018-0190