Loading...
0SD-03-02_Site_PlanG. See Partial Plan B ------------------------------------------------------------------------ -- --- ---- -=-- - --- ----- -- ---- ------------- in, - --- 10' Pathway I ----- - R---- iRR --- IRR--- --------------------------------------------------------- - - - - - -2 - - - ---------------------------- i f� i Chinden Boulevard / Highway 20 N. Partial Site / Plan (With Phase 1C, Bid Alternate No. 4) Scale: 1" = 30'-0" ----- IRR — — m a Legend MIN. 9'x19' STANDARD PARKING SPACE, U.N.O. ® 9'x20' HANDICAP PARKING SPACE WITH MIN. 9'x20' ADJACENT ACCESS AISLE AND H.C. PARKING SIGNAGE. CONCRETE CURB AND GUTTER. NEW CONCRETE. NEW TEXTURED (CONTROL JOINTS CONCRETE AT 5'-0" U.N.O.) •••••.••. • FENCE OR GATE AS NOTED. BIKE RACK AS NOTED. FIRE HYDRANT. SEE CIVIL. G= POLE MOUNTED PARKING LOT LIGHT / SHIELDED FIXTURE. SEE ELECTRICAL. PARKING / DRIVEWAY RELATED SIGNAGE. PHASE 1A BUILDING AREA Reference Notes PHASE 1B BUILDING AREA 1. Completed parking lot and landscaping improvements. 2. Existing irrigation box. LV ARCHITECTS 2400 E RIVERWALK DRIVE BOISE, IDAHO 83706 WWW.LKVARCHITECTS.COM 208.336.3443 PRELIMINARY NOT FOR CONSTRUCTION r N O C L 22: U O > c� L I— U O M DATE: January 15, 2018 LKV PROJECT #: REVISIONS: May 19, 2017 DRAWN BY: MS CHECKED BY: WT PROGRESS SET DRAWING NO. SD -3.2