Loading...
0SD-02-01_Site_Plan0 0 Partial Plan A 20'- 0" Trash Enclosure Scale: 1" = 10'-0" See Partial Plan A X11 � .1 N. Partial Site Plan (Phase 1A, Base Bid) Scale: 1" = 30'-0" Playground 10' Pathway ----------------------- ------——--—----------————----------—---------------——————--—----———-- Chinden Boulevard / Highway 20 Legend MIN. 9'x19' STANDARD PARKING SPACE, U.N.O. 9'x20' HANDICAP PARKING SPACE WITH MIN. 9'x20' ADJACENT ACCESS AISLE AND H.C. PARKING SIGNAGE. CONCRETE CURB AND GUTTER. NEW CONCRETE. NEW TEXTURED (CONTROL JOINTS CONCRETE AT 5'-0" U.N.O.) •••••.••. • FENCE OR GATE AS NOTED. BIKE RACK AS NOTED. FIRE HYDRANT. SEE CIVIL. POLE MOUNTED PARKING LOT LIGHT / SHIELDED FIXTURE. SEE ELECTRICAL. PARKING / DRIVEWAY RELATED SIGNAGE. PHASE 1A BUILDING AREA Reference Notes PHASE 1B BUILDING AREA Temporary Entrance Foyer prior to completion of Phase 1 B Permanent Entrance Foyer and Fellowship area. Temporary concrete sidewalk prior to completion of Phase 1 B improvements. Temporary landscaping prior to completion of Phase 1 B improvements. Textured concrete paving. Passenger loading and unloading area. 6' vinyl coated chain link fence. 10' maintenance access gate. 3' playground access gate and emergency egress. Landscaped berm with one foot contours. See Landscape Plans. 10. Monument electronic readerboard sign. 11. Existing property line. 12. New property line. 13. Trash enclosure. See Detail. 7'-0" high metal siding panels to match building. 14. Bicycle parking, (12) Spaces. 15. Irrigation easement. 16. 20' wide fire lane. 17. 26' wide fire lane. 18. Undeveloped area to be kept clear and mowed. 19. Existing irrigation box. 20. Compacted road mix gravel between pathway and roadway. 21. Idaho Power Company Transformer. 22. 60'-0" Future ITD ROW. 23. Pressurized irrigation point of connection. See Civil. 24. Storm Water Retention Area. ARCHITECTS 2400 E RIVERWALK DRIVE BOISE, IDAHO 83706 WWW.LKVARCHITECTS.COM 208.336.3443 PRELIMINARY NOT FOR CONSTRUCTION r N O C L 22: U O > c� L I— U O M c0 DATE: January 15, 2018 LKV PROJECT #: REVISIONS: May 19, 2017 DRAWN BY: MS CHECKED BY: WT PROGRESS SET DRAWING NO. SD -2.1