Loading...
0SD-01-01_Site_PlanSecondary Entrance 0 0 0 Master Site Plan Scale: 1" = 60'-0" Chinden Center Line Legend 675,626 s.f. Church Parcel MIN. 9'x19' STANDARD PARKING SPACE, U.N.O. Future ROW Parcel 9'x20' HANDICAP PARKING SPACE WITH MIN. 9'x20' ® ADJACENT ACCESS AISLE AND H.C. PARKING SIGNAGE. Entrance and Dining Patios CONCRETE CURB AND GUTTER. Total Off -Street Parking 85'-6" NEW CONCRETE. NEW TEXTURED 260 Spaces Area B (CONTROL JOINTS CONCRETE Area C AT 5'-0" U.N.O.) • •••••.••• • FENCE OR GATE AS NOTED. BIKE RACK AS NOTED. FIRE HYDRANT. SEE CIVIL. G�=a POLE MOUNTED PARKING LOT LIGHT / SHIELDED FIXTURE. SEE ELECTRICAL. PARKING / DRIVEWAY RELATED SIGNAGE. PHASE 1A BUILDING AREA Site Data PHASE 1B BUILDING AREA Total Site Size 675,626 s.f. Church Parcel 612,750 s.f. Future ROW Parcel 62,876 s.f. Recreational Open Space 25,000 s.f.+ Entrance and Dining Patios 16,000 s.f.+ Total Off -Street Parking 85'-6" Area A 260 Spaces Area B 155 Spaces Area C 145 Spaces Total 560 Spaces Standard 548 Spaces Accessible 12 Spaces Phase 1A & 1B Building Area Phase 1A 50,882 s.f. Phase 1 B 7,438 s.f. Total 58,320 s.f. Phase 1A & 1B Parking Required 117 Spaces Phase 1A & 1B Parking Provided Parking Areas B & C 300 Spaces Standard 292 Spaces Accessible 8 Spaces Bicycle Parking 24 Spaces Building Setbacks Required Actual Chinden 35' 181'-2" Tree Farm 20' Varies Tree Haven 10' Varies North 20' 85'-6" West 20' 362'-6" LV ARCHITECTS 2400 E RIVERWALK DRIVE BOISE, IDAHO 83706 WWW.LKVARCHITECTS.COM 208.336.3443 PRELIMINARY NOT FOR CONSTRUCTION CIO i U O � 2 a) N L I- U O M DATE: January 15, 2018 LKV PROJECT #: REVISIONS: DRAWN BY: MS CHECKED BY: WT PROGRESS SET DRAWING NO. SD -1.1