PZ - Applicant Response to Staff ReportEfGINEERING planning and engineering communities for the future aOLUTIONS LLP August 16, 2018 City of Meridian Planning & Zoning Commission 33 East Broadway Avenue Meridian, ID 83642 Re: Whitecliffe Estates Subdivision — H-2018-0074 Dear Commissioners: 1029 N. Rosario Street, Suite 100 Meridian, ID 83642 Phone: (208) 938-0980 Fax: (208) 938-0941 E-mail: es-beckym@gwestoffice.net We have reviewed staff comments for the Planning & Zoning Commission meeting of August 16, 2018, and have the following responses: EXHIBIT B - AGENCY & DEPARTMENT COMMENTS/CONDITIONS 1. PLANNING DIVISION 1.1 Site Specific Conditions of Approval 1.1.1 Understood. a. Prior to the Planning and Zoning Commission hearing, the applicant has revised the plat in the following ways: • A 15 -foot -wide micro -path was added in Block 6 providing linkage to Cobblefield Subdivision. It is difficult to deal with other neighborhood associations; therefore, we object to coordinating with an unrelated, developed subdivision for off-site improvements. • We object to eliminating the McMillan Road public street access. In meetings with the adjoining residents, they did not want all traffic to funnel through their neighborhoods and were supportive of the independent access. We met with Christie Little and Mindy Wallace at ACHD, and the District approves of the access to McMillan Road. • In discussions with ACHD, we have agreed to provide traffic -calming along Loretta Street with a raised pedestrian crossing and stop control at Bird Wing and Bryce Canyon. The preliminary plat has been modified to reflect the traffic calming. • Lot 10, Block 1 has been modified to be a minimum of 8,000 square feet in accord with UDC 11-2A-5. b. Understood. c. The applicant will comply. d. Understood. e. Understood. C:\Documents\2018\180201 Whitecliffe Estates Subdivision\RecsResponseP&Z.doc Meridian Planning & Zoning Commission August 16, 2018 Page 2 f. The applicant will comply. g. The applicant will comply. 1.1.2 The preliminary plat included in Exhibit A.2, dated 5/23/2018, was revised as follows: a. Understood. b. The applicant will comply. c. The 60 -foot -wide Idaho Power easement and 50 -foot -wide Lemp Canal easement have been delineated on the preliminary plat. d. Lot 10, Block 1 has been modified to meet the minimum lot size requirements. 1.1.3 The landscape plan included in Exhibit A.3, dated 5/14/2018, has been revised as follows: a. Trees along the McMillan frontage will be restricted to Class 1 due to the overhead transmission lines. Grass or gravel on the north side of the Lemp Canal will not be allowed as requested by staff, as there is insufficient room and that is the maintenance side of the canal. No curb or gutter proposed for McMillan Road, so the condition 1.1.3a is not applicable. b. The applicant's representative at Jensen -Belts has contacted Elroy Huff, and the applicant will comply. c. The applicant has complied. d. Grass or gravel on the north side of the Lemp Canal will not be allowed as requested by staff, as there is insufficient room and that is the maintenance side of the canal. e. The applicant will comply. f. It is not possible to receive approval from agencies prior to submittal of construction plans, which are submitted with the final plat. We have contacted Idaho Power Company and the Settlers Irrigation District to discuss the project, and they both have indicated their preliminary approval of the landscape concept and improvements and willingness to work with us. g. We have had multiple discussions with Mack Meyers at Settler Irrigation District. The District maintains the waterway from McMillan Road and has allowed other developments along the corridor to install turf up to the south side of the bank with a license agreement. 1.1.4 The applicant will comply. 1.2 General Conditions of Approval 1.2.1 The applicant will comply. 1.2.2 The applicant is requesting a waiver to allow access to McMillan, as the property has one-quarter mile of frontage and it is undesirable to route trips from 128 homes through existing subdivisions. ACHD has reviewed the Traffic Impact Study and prepared a staff report allowing for the street approach to McMillan Road. 1.2.3 Understood, with the exception that the Lemp Canal will remain open. 1.2.4 The applicant will comply. CADocuments\2018\180201 Whitediffe Estates Subdivision\RecsRespornseP&Z.doc Meridian Planning & Zoning Commission August 16, 2018 Page 3 1.2.5 The applicant will comply. 1.2.6 The applicant will comply. 1.2.7 The applicant will comply, as may be allowed by the Settlers Irrigation District and ACHD. 1.2.8 The applicant will comply. 1.2.9 The applicant will comply. 1.2.10 The applicant will comply. 1.2.11 The applicant will comply. 1.3 Ongoing Conditions of Approval 1.3.1 Understood. 1.3.2 Understood. 1.3.3 Understood 1.3.4 Understood. 1.3.6 Understood. 1.3.7 Understood. 1.4 Process Conditions of Approval 1.4.1 The applicant will comply. 1.4.2 The applicant will comply. 1.4.3 Understood. 1.4.4 The applicant will comply. 1.4.5 Understood 1.4.6 The applicant will comply. 2. PUBLIC WORKS DEPARTMENT 2.1 SITE SPECIFIC CONDITIONS OF APPROVAL 2.1.1 Understood. 2.1.2 The applicant is in agreement. 2.1.3 The applicant will comply. 2.2 General Conditions of Approval 2.2.1 The applicant will comply. 2.2.2 The applicant will comply. 2.2.3 The applicant will comply. 2.2.4 Understood. 2.2.5 The applicant will comply. 2.2.6 The applicant will comply, with the exception of the Lemp Canal, which will remain open. CADocuments\2018\180201 Whitediffe Estates Subdivision\RecsResponseP&Z.doc Meridian Planning & Zoning Commission August 16, 2018 Page 4 2.2.7 Understood. 2.2.8 The applicant will comply. 2.2.9 The applicant will comply. 2.2.10 The applicant will comply. 2.2.11 Understood. 2.2.12 Understood. 2.2.13 Understood. 2.2.14 Understood. 2.2.15 The applicant will comply. 2.2.16 Understood. 2.2.17 The applicant will comply. 2.2.18 Understood. 2.2.19 Understood. 2.2.20 Understood. 2.2.21 Understood. 2.2.22 Understood. 2.2.23 Understood. 3. POLICE DEPARTMENT 3.1 The Police Department had no comment on this application. 4. FIRE DEPARTMENT 4.1 Understood. 4.2 Understood. 4.3 Understood. 4.4 Understood. 4.5 Understood. 4.6 The applicant will comply. 4.7 Understood. 5. REPUBLIC SERVICES 5.1 Republic Services had no comments on this application. 6. PARKS DEPARTMENT 6.1 The Parks Department had no comment on this application. C:\Documents\2018\180201 Whitecliffe Estates Subdivision\RecsResponseP&Z.doc Meridian Planning & Zoning Commission August 16, 2018 Page 5 7. ADA COUNTY HIGHWAY DISTRICT CONDITIONS OF APPROVAL: The applicant will comply with ACHD's conditions of approval and receive plan approval prior to starting construction. We appreciate your review of this project. Please feel free to call me if you have additional comments or questions. Sincerely, Engineering Solutions, LLP Becky McK Planner BM: ss cc: 4345 Linder Road LLC CADocuments\2018\140201 Whitecliffe Estates Subdivision\RecsResponseP&Z. doe