Loading...
Project Final Acceptance Letter - ICOM(�irE IDIANIZ,:--- June 6, 2018 Mayor Tammy de Weerd City Council Members: Joe Borton Genesis Milam Ty Palmer Luke Cavener Treg Bernt Anne Little Roberts Mr. Chris Wilson, Director of Facilities Tuffy Excavation Idaho College of Osteopathic Medicine 4028 S. Banner Street 1311 E. Central Drive Boise, ID 83709 Meridian, ID 83642 RE Idaho College of Osteopathic Medicine — Final Acceptance Dear Mr. Wilson: Installation of this project's sanitary sewer and/or domestic water systems has been satisfactorily completed in accordance with the approved plans. These systems have passed the required testing in accordance with City of Meridian Standard Specifications and Drawings, and therefore are hereby accepted by the City for ownership and normal maintenance. Record drawings submitted to us for this project are also accepted and are being forwarded to the Idaho Department of Environmental Quality. The engineer of record is responsible for certification of the record drawings as to horizontal and vertical location of all public water and sewer facilities installed. In accordance with the City of Meridian's Unified Development Code §11-5C-3, and the City of Meridian's Supplemental Specifications and Drawings to the Idaho Standards for Public Works Construction, 2013 Edition, the installation and materials of the sewer and domestic water systems are to be warranted against defect by the owner for a period of two -years from the date of this letter. Warren Stewart, P.E. City Engineer cc. City Clerk PW - Water Division PW - Wastewater Division PW - Construction Division File DEQ Public Works Department . 33 E Broadway Ave, Suite 200, Meridian, ID 83642 Phone 208-898-5500 . Fax 208-898-9551 . www.meridiancity.org