Trilogy Sub. No. 1 Pump Shed- DES A-2018-0207Conditions Document
1
Trilogy Sub. No. 1 Pump Station Enclosure - DES - A-2018-0207
CERTIFICATE OF ZONING COMPLIANCE
REPORT
DATE:
June 26, 2018
TO:
Titanium Excavation
FROM:
Josh Beach, Associate City Planner
SUBJECT:
Trilogy Subdivision No. 1 Pump Station Enclosure - DES - A-2018-0207
OWNER:
CBH Homes
DESCRIPTION OF APPLICANT'S REQUEST
The applicant, Titanium Excavation, requests Design Review (DES) approval of a new pump
shed for the Trilogy Subdivision No. 1.
The site is located at 4600 E. Everest Street.
DECISION
The applicant's request for Design Review is approved with the conditions listed in this report.
Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to
verify if you need a building permit and/or inspection. If you do need a building permit, you
must complete that process before you commence the use or construction. Please contact
Building Services for additional details about building permits and inspections.
Site Conditions of Approval
1. The applicant shall install shutters on what are labeled as the “front,” “left” and “right”
sides of the structure as indicated by the elevations in Exhibit B.
Process Conditions of Approval
1. No signs are approved with this application. Prior to installing any signs on the property,
the applicant shall submit a sign permit application consistent with the standards in
UDC Chapter 3 Article D and receive approval for such signs.
2. The applicant shall complete all improvements related to public life, safety, and health
as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other
improvements in accord with UDC 11-5C-3C.
3. Upon installation of the landscaping and prior to inspection by Planning Division staff,
the applicant shall provide a written certificate of completion as set forth in UDC 11-
3B-14A.
4. The approved elevations may not be altered without prior written approval of the City of
Meridian Planning Division.
5. The applicant shall pay any applicable impact fees prior to the issuance of a building
permit.
6. If any changes must be made to the site plan to accommodate ACHD requirements, the
applicant shall submit a new site plan to the City of Meridian Planning Division for
approval prior to issuance of the building permit.
7. If the subject property is part of a final plat that has not yet recorded, the applicant shall
be responsible for all plat improvements prior to release of Certificate of Occupancy for
the first structure within such plat.
8. The City of Meridian requires that the owner enter into a Warranty Surety Agreement
Conditions Document
2
Trilogy Sub. No. 1 Pump Station Enclosure - DES - A-2018-0207
and post a Warranty Surety in the amount of 20% of the total construction cost for all
completed public sewer and water infrastructure for a duration of two years. This surety
amount will be verified by a line item final cost invoicing provided by the owner to the
City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit
or bond, and must be in place prior to Certificate of Occupancy. Applicant must file an
application for surety, which can be found on the Community Development Department
website. Please contact Land Development Services for more information at 208-887-
2211.
Ongoing Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation
that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all
landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14.
2. The project is subject to all current City of Meridian ordinances and previous conditions
of approval associated with this site.
3. The issuance of this design review approval does not release the applicant from any
previous requirements of the other permits issued for the site.
4. The applicant and/or property owner shall have an ongoing obligation to prune all trees
to a minimum height of six feet above the ground or sidewalk surface to afford greater
visibility of the area.
5. The applicant shall have an ongoing obligation to maintain all pathways.
6. The applicant has a continuing obligation to comply with the outdoor lighting provisions
as set forth in UDC 11-3A-11.
7. The applicant and/or property owner shall have an ongoing obligation to maintain all
landscaping and constructed features within the clear vision triangle consistent with the
standards in UDC 11-3A-3.
CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the
Director. All requests for review shall be filed in writing with the Planning Division on or
before July 11, 2018, within fifteen (15) days after the written decision is issued, and contain
the information listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a
final decision on a land use application. You have the right to request a regulatory taking
analysis under Idaho Code 67-8003.
EXPIRATION
Certificates of Zoning Compliance issued in conjunction with construction or alteration of a
structure shall expire if the construction or alteration has not commenced within one year of the
date of issuance of the Certificate of Zoning Compliance.
In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until
June 26, 2019.
EXHIBITS
A. Vicinity Map
B. Elevations
Conditions Document
3
Trilogy Sub. No. 1 Pump Station Enclosure - DES - A-2018-0207
A. Vicinity Map
Conditions Document
4
Trilogy Sub. No. 1 Pump Station Enclosure - DES - A-2018-0207
B. Elevations