Loading...
PR-004_v2-Tree Mitigation Proposal Request – 004_v2 Project: Contractor: CTC-M Diesel Technology Lab CM Company, Inc 1900 W. Pine Ave. 431 McGregor Drive Meridian, Idaho 83642 Boise, Idaho 83705 Date Issued: June 07, 2018 Provide an itemized quotation of the cost of the following changes to the Work. Include any required change in the contract time if applicable. This is not a Change Order nor a direction to proceed with the Work described herein. DESCRIPTION: Provide a detailed cost breakdown of materials and labor associated with the following: This project’s Certificate of Zoning Compliance report requires demolished trees to be mitigated per City Code UDC 11-3B-10. The City’s arborist has reviewed the removed trees and provided the attached report, see attached. - Provide 22 caliper inches of tree mitigation. Provide: (x4) 3” Caliper Patmore Ash (x3) 3” Caliper Urbanite Ash Other acceptable tree species: Maple and Locusts. Locate: along Baseball field’s fence, equally spaced directly behind center field. Provide: fabric barrier and Rock mulch in lieu of grass only between existing baseball fence and new curb and gutter. Attachments: Mitigation Plan – Arborist Report Brian Coleman Email: bcoleman@hummelarch.com Phone: 208.343.7523 Hummel Architects, PLLC