Loading...
L1.0_LANDSCAPE PLAN0 w m _ CD ry 0 w u ry U) V) u w I CD z CD_ w z w u u w r O 3 V) z w z CD u O z w z V) 0 z 0 Q u u_ 0 CD 57 CD w U) w Cr z 0 u O 0 I CC z a w H CD w ry w z w ry z V) NOTE: THIS PLAN IS INTENDED TO SHOW THE PROPOSED LANDSCAPE PLANT MATERIALS ONLY. ALL PROPOSED GRADING, UNDERGROUND UTILITIES, STORM WATER FACILITIES, HARD—SCAPE IMPROVEMENTS, AND OTHER MISCELLANEOUS SITE IMPROVEMENTS, SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE APPROVED CIVIL PLANS. IN THE EVENT OF A CONFLICT BETWEEN THE CIVIL PLANS AND THE LANDSCAPE PLAN, CONTRACTOR SHALL NOTIFY THE ENGINEER AND LANDSCAPE ARCHITECT IMMEDIATELY, — 0 5 10 20 30 Plan Scale LANDSCAPE NOTES 1. VERIFICATION OF TOTAL LANDSCAPE MATERIAL QUANTITIES AS SHOWN ON THE LANDSCAPE PLANS AND IN THE PLANT SCHEDULE SHALL BE THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR. THE LANDSCAPE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES PRIOR TO FINAL BIDDING OR INSTALLATION. 2. CONTRACTOR SHALL LOCATE AND IDENTIFY EXISTING UNDERGROUND AND OVERHEAD UTILITIES WITHIN CONTRACT WORK AREAS PRIOR TO CONSTRUCTION. CONTACT DIG LINE, INC. © 1.800.342.1885. PROVIDE ADEQUATE MEANS OF PROTECTION OF UTILITIES AND SERVICES DESIGNATED TO REMAIN. REPAIR UTILITIES DAMAGED DURING SITE WORK OPERATIONS AT CONTRACTOR'S EXPENSE. 3. ALL PLANT MATERIALS PLACED IN PREPARED HOLES SHALL BE PROPERLY BACKFILLED PRIOR TO THE END OF THE WORKING DAY. ALL SAUCERS SHALL BE SOAKED WITH WATER AND MULCHED IMMEDIATELY FOLLOWING INSTALLATION. 4. ALL WRAPPING MATERIAL SHALL BE CUT AND REMOVED FROM AROUND THE UPPER PORTION OF THE ROOT BALL. METAL BASKET WIRES AND BURLAP SHALL BE PULLED BACK AND TUCKED UNDER THE EDGES OF THE SAUCER RINGS ON ALL TREES AND LARGE SHRUBS. ALL SYNTHETIC BURLAP SHALL BE REMOVED FROM ROOT BALLS PRIOR TO BACKFILLING. 5. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN HEALTHY GROWING CONDITION AMD/OR IF NOT THE SIZE SPECIFIED ON THE PLAN. 6. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF ACCEPTANCE BY OWNER. DURING GUARANTEE PERIOD, CONTRACTOR SHALL REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN HEALTHY CONDITION IMMEDIATELY WITH COMPARABLE SIZE AND SPECIES AT NO COST TO THE OWNER. 7. FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS TO REMOVE LOW AND HIGH POINTS AND TO PROVIDE POSITIVE DRAINAGE. REMOVE ROCKS OVER 1" IN ANY DIMENSION, STICKS, ROOTS, RUBBISH, AND EXTRANEOUS MATTER. 8. IN ALL PLANTER BED AND LAWN AREAS, THE TOP 6 INCHES OF SOIL WILL BE AMENDED AT A RATIO OF 3 CY OF ORGANIC MATTER PER 1000 S. ROTO -TILL ORGANIC MATTER A MINIMUM OF 6" INTO TOPSOIL. 9. ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18" OF TOPSOIL. NEW LAWN AREAS SHALL HAVE A MINIMUM OF 12" OF TOPSOIL. SPREAD, COMPACT , AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3" BELOW SURFACES OF WALKS AND CURBS IN PLANTING BED AREAS, 1Y2" IN SOD LAWN AREAS, AND 1" IN SEED LAWN AREAS. 18. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF-SITE. 19. REPAIR AND/OR REPLACE ANY EXISTING LANDSCAPE AREAS WITHIN THE WORK LIMITS OF THE PROJECT THAT HAVE BEEN DAMAGED OR REMOVED IN THE COURSE OF THE COMPLETION OF THE PROJECT, INCLUDING WORK DONE BY OTHERS, THAT IS SHOWN IN THE CONTRACTED PLAN SET. MATCH ALL MATERIALS REPAIRED OR REPLACED TO ENSURE CONSISTENCY. 20. CONTRACTOR'S MAINTENANCE, DURING THE ONE-YEAR WARRANTY PERIOD, SHALL INCLUDE: i. PRUNING, CULTIVATING, WEEDING, WATERING, AND APPLICATION OF APPROPRIATE INSECTICIDES AND FUNGICIDES NECESSARY TO MAINTAIN PLANTS FREE OF INSECTS AND DISEASE UNTIL FINAL ACCEPTANCE BY OWNER. j. RE -SET SETTLED PLANTS TO A PROPER GRADE AND POSITION. k. RESTORE PLANTING SAUCER AND ADJACENT MATERIALAND REMOVE DEAD MATERIAL. I. TIGHTEN AND REPAIR GUY WIRES AND STAKES AS REQUIRED ONLY IF ORIGINALLY NEEDED. m. CORRECT DEFECTIVE WORK AS SOON AS POSSIBLE AFTER DEFICIENCIES BECOMES APPARENT AND WEATHER AND SEASON PERMIT. 21. IRRIGATION WATER IS AVAILABLE BY CONNECTION TO THE EXISTING CITY OF NAMPA P.I. MAINS BORDERING THE SITE. SEE PLAN FOR POINT OF CONNECTION. 22. AN UNDERGROUND IRRIGATION SYSTEM SHALL BE PROVIDED TO INSURE THAT ALL PLANT MATERIAL THRIVES. THE SPECIFIC LAYOUT OF THE PI SYSTEM SHALL BE A DESIGN -BUILD EFFORT BY THE LANDSCAPE CONTRACTOR, OR HIS/HER SUB -CONTRACTOR. PLANT SCHEDULE KEY NOTES ❑ ALL PLANTER BEDS SHALL RECEIVE A SURFACE—COURSE OF BLACK AND TAN PERMA BARK (3" THICKNESS) OVER A NON—WOVEN, WEED—BARRIER FABRIC. 2❑ RETAIN AND PROTECT EXISTING LANDSCAPE AND RESET SPRINKLERS. CUT CLEAN EDGE WHERE SOD TO BE REMOVED/EXTENDED AND MATCH EDGE WITH NEW SOD WHERE SHOWN ON PLAN. 3❑ BIKE RACK PAD — SEE ARCHITECTURAL ® EXTERIOR A/C OR MECHANICAL UNIT. 5❑ APPROXIMATE LOCATION OF EXISTING PRESSURE IRRIGATION. VERIFY POINT OF CONNECTION PRIOR TO BIDDING. ©INSTALL (2) 2—INCH PVC SLEEVES FOR SPRINKLER PIPE AND CONTTROL WIRE. SYMBOL QUANT. COMMON NAME BOTANICAL NAME MIN. SIZE/COND. EST. SIZE AT IMATURITYHXWI NOTES PRICING SET ® E CNI z CV V U) O Z — � O W 00 v Q U ~ x i AT PLANTING > < OW (E0 O V a) CNI O 4>4 U U Limemound Spirea Spirea x bumalda Monhub' Crimson Pygmy Berberis thunbergii Barberry atropurpurea 'Crimson' 2 Gal. Cont. 3'X 4' 2 Gal. Cont. 2'X 3' Dec. Shrub Dec. Shrub w0 22 Dwarf Norway Spruce Picea abies'Pumila' 5 Gal. Cont 4'X 5' 6 Evergreen Shrub Cf) O Hemerocallis'Stella de Stella de Oro Daylilly Oro' Juniperus horizontalis Prince of Wales Juniper Prince of Wales' Morning Light Grass Miscanthus sinensis 'Morning Light' 1 Gal. Cont. VX 2' 2 Gal. Cont. 8" X 10' 1 Gal. Cont. SX 5' Perennial Evergreen Groundcover 27 7 Q 3 Ornamental Grass O o MULCH PER PLAN 3" HT. WATERING BASIN BERM PLANTING PIT LOOTTHBALL III o _ FERTILIZER TABLETS, SHALL BE A III 2"-6" DEPTH MIN. OF TWICE THE ROOTBALL BACKFILL SOIL MIX DEPTH -I 10 I' FOLD BURLAP BACK ROOTBALL FROM TOP HALF OF WIDTH ROOT BALL AFTER PLACING SHRUB IN 6" 6" 6" 6" PLANTING PIT MIN MIN. MINI MIN. PLANTING PIT SHALL BE A MINIMUM OF 2 TIMES THE ROOT - BALL WIDTH AT BASE OF PIT & 3 TIMES ROOTBALL WIDTH AT FINISH GRADE. SHRUB PLANTING DETAIL NOTE: REMOVE TREATED OR SYNTHETIC BURLAP COMPLETELY. NTS MAY 27, 2018 iFflrrrr+ ,•• , 0 f' f p '•+ Aro i P. 41, 0% 1, w .ab i o 04 % M wo LA -214 r 5/27/18 PRICING SET ® E CNI z CV V U) O Z — � O W 00 v Q U ~ x i 00 LL > > < OW (E0 O V a) CNI O M z C-0mLr) 4) O ~ FM 00 U U OCl)� w0 z u Cl) LL Cf) O OOM a Q JC!) w W z Q LU_ LU J DC � DC W w w a Cn 50 REVISIONS PLAN PREPARED BY: TIM MOKWA, RLA 208.869.9785 tim.mol<wa@gmail.com Ll ■ LANDSCAPE PLAN