Loading...
Hill's Century Farm Sub No 9 DEQ Approval LetterEIDIAN,-- �J June 13, 2018 Mr. Aaron Scheff IDEQ Boise Regional Administrator 1445 N. Orchard Street Boise, Idaho 83706 Re: Project Approval - Hill's Century Farm Subdivision No. 9 Mayor Tammy de Weerd City Council Members: Joe Borton Genesis Milam Ty Palmer Luke Cavener Treg Bernt Anne Little Roberts Per the provisions in Idaho Code § 39-118(2)(d), the City of Meridian has retained the services of Keller associates .as its Qualified Licensed Professional Engineer (QLPE), to verify that the plans and specifications proposed for the above -referenced project comply with the IDEQ Facility and Design Standards (IDAPA 58.01.16 and 58.01.08) and the applicable Meridian standards, and to approve the project for construction. By virtue of their attached letter, they have reviewed and approved the above referenced plans and specifications as complying with the Facility and Design Standards, and Engineering Standards of Care as it relates to the reviewed elements. This approval shall expire one year from the date of this letter. If construction has not commenced by the expiration date, plans must be resubmitted for review and approval before construction may proceed. The above referenced project complies with the City of 's current Wastewater Facility Plan, and Sewer Master Plan, and our system has adequate capacity to accept sewage wastes for treatment. These determinations have been made by use of computer models developed for our Sewer Master Plan. This project is also within the City's urban service planning boundary. Our Domestic Water distribution system can provide water service and the minimum required fire flow (1000 GPM) and the minimum required residual pressure of 20 PSI. These determinations have been made by use of computer models developed for our Water Master Plan. The City of Meridian will own and operate the wastewater collection and domestic water distribution systems within this project upon final inspection and acknowledgement by formal acceptance letter. In essence, the City of Meridian "Will Serve" the project. Attached for your records is a complete and accurate copy of the plans and specifications reviewed in connection herewith, stamped "Approved for Construction." Sincer ly, Warren Stewart, P.E. Engineering Manager Public Works Department . 33 E. Broadway Avenue, Suite 200 . , ID 83642 Phone 208-898-5500. Fax 208-898-9551 . www.meridiancity.org