Landscape+Plan(25)CK
(12)HSB
(13)HSB
(8)HSB
(13)CK
(9)HSB
Material Legend
EXISTING LANDSCAPE TO
REMAIN. RETAIN AND
PROTECT.
PERMA BARK ROCK MULCH
AT 3-INCH DEPTH. COLOR
AND SIZE TO MATCH EXISTNG.
A.CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH
IMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO
BEGINNING WORK.
B.FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN
ACCORDANCE WITH SITE GRADING PLAN. REMOVE RIDGES AND FILL DEPRESSIONS,
AS REQUIRED TO MEET FINISH GRADES. PLACE 3" OF PERMA BACK ROCK MULCH
OVER SUBGRADE SOIL TO ACHIEVE FINISH GRADE. FINISH GRADE RELATED TO
ADJACENT SITE ELEMENTS SHALL BE:
B.A.1-INCH BELOW TOP OF ADJACENT PAVEMENT, VALVE BOX, VAULT, ETC.
B.B.3-INCHES BELOW TOP OF CURB UNLESS NOTED OTHERWISE.
C.ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18" OF TOPSOIL. SPREAD,
COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE.
D.RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE. VERIFY SUITABILITY OF
SURFACE SOIL TO PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN
NECESSARY. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE
OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER
FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE TOPSOIL DOES NOT MEET
THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER: A)
PROVIDE APPROVED IMPORTED TOPSOIL, OR B.) IMPROVE ON-SITE TOPSOIL WITH
METHODS APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH IMPORTED
TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS,
PLANTS, SODS, STONES, CLAY LUMPS AND OTHER EXTRANEOUS MATERIALS
HARMFUL TO PLANT GROWTH.
E.IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEW
TOPSOIL THAT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY
FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF
ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER
EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH.
F.OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL
CHARACTERISTICS TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY
FROM NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF
NOT LESS THAN 4 INCHES.
G.ALL LANDSCAPE AREAS SHALL BE WEED FREE AT THE TIME OF LANDSCAPE
INSTALLATION.REMOVE ALL ROOTS, WEEDS, ROCKS AND FOREIGN MATERIAL ON
THE SURFACE.
H.NEW SHRUB PLANTING. SEE DETAIL 1 THIS SHEET.
I.ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN
STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A
SOUND AND HEALTHY CONDITION.
J.ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR
BEGINNING AT THE DATE OF SUBSTANTIAL COMPLETION. REPLACE ALL PLANT
MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE
SAME SIZE AND SPECIES AT NO COST TO THE OWNER.
K.SHRUB PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND
FERTILIZER FOR SHRUB PIT BACKFILL AT THE FOLLOWING RATES. BLEND
AMENDMENTS WITH THOROUGHLY WITH SOIL BACKFILL. SHRUB PITS SHALL BE
2.5'x2.5'x1' (6.25 CF/ 0.25 CY).
K.A.APPLICATION RATES:
K.A.A.HUMIC ACID: 2 LBS PER SHRUB PIT
K.A.B.COMMERCIAL GRADE COMPOST - 2 CUBIC FEET PER SHRUB PIT
K.A.C.PLANTING TABLET FERTILIZER - 2 TABLETS PER SHRUB PIT
K.A.D.CALCIFIED DIATOMACEOUS EARTH - 15 LBS PER SHRUB PIT
L.IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED
FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE.
M.CONTRACTOR SHALL SUBMIT MATERIAL SAMPLES FOR LANDSCAPE ROCK MULCH
TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PROCUREMENT. LANDSCAPE
BOULDERS, PHOTO SUBMITTAL IS ADEQUATE. FOR ROCK MULCH, SUBMIT 1 GALLON
BAG SAMPLE TO OWNER.
N.ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER
SYSTEM WHICH ENSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR
REQUIRED WATER USES. CONTRACTOR SHALL TIE INTO EXISTING IRRIGATION ON
SITE TO PROVIDE 100% COVERAGE TO LANDSCAPE IMPROVEMENT AREAS. MATCH
EXISTING IRRIGATION TYPE TO ENSURE NEW LANDSCAPE IRRIGATION IS
COMPATIBLE WITH EXISTING IRRIGATION DESIGN.
Landscape Notes:
LARGE BASALT BOULDERS,
3'-4' DIA. TYP. SEE DETAIL 2
THIS SHEET.
SHRUBS BOTANICAL NAME / COMMON NAME CONTAINER
CK CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER` / FEATHER REED GRASS1 GAL
HSB HELICTOTRICHON SEMPERVIRENS `BLUE OATS` / BLUE OAT GRASS1 GAL
PLANT SCHEDULE
HORIZONTAL SCALE: 1" = 20'
Landscape Plan 20'40'0
Pr
o
j
e
c
t
N
a
m
e
:
Fi
l
e
L
o
c
a
t
i
o
n
:
c:
\
u
s
e
r
s
\
m
t
h
o
m
a
s
\
d
e
s
k
t
o
p
\
m
c
d
o
n
a
l
d
s
\
l
a
n
d
s
c
a
p
e
p
l
a
n
.
d
w
g
La
s
t
P
l
o
t
t
e
d
B
y
:
mi
c
h
a
e
l
t
h
o
m
a
s
Da
t
e
P
l
o
t
t
e
d
:
Mo
n
d
a
y
,
M
a
r
c
h
5
2
0
1
8
a
t
0
4
:
5
6
P
M
Re
v
i
s
i
o
n
s
Th
i
s
d
o
c
u
m
e
n
t
a
n
d
t
h
e
i
n
f
o
r
m
a
t
i
o
n
c
o
n
t
a
i
n
e
d
h
e
r
e
i
n
m
a
y
n
o
t
b
e
c
o
p
i
e
d
o
r
r
e
p
r
o
d
u
c
e
d
wi
t
h
o
u
t
e
x
p
r
e
s
s
w
r
i
t
t
e
n
p
e
r
m
i
s
s
i
o
n
o
f
T
h
e
L
a
n
d
G
r
o
u
p
,
I
n
c
.
Un
a
u
t
h
o
r
i
z
e
d
d
i
s
c
l
o
s
u
r
e
o
r
c
o
n
s
t
r
u
c
t
i
o
n
u
s
e
a
r
e
p
r
o
h
i
b
i
t
e
d
b
y
c
o
p
y
r
i
g
h
t
l
a
w
.
Date of Issuance:
Project No.:
Designed by:
Checked by:
Sheet No.:
Sh
e
e
t
T
i
t
l
e
:
L1.00
DR
MRT
03.05.2018
118000
La
n
d
s
c
a
p
e
P
l
a
n
Mc
D
o
n
a
l
d
s
La
n
d
s
c
a
p
e
I
m
p
r
o
v
e
m
e
n
t
s
19
5
E
.
C
e
n
t
r
a
l
D
r
.
Me
r
i
d
i
a
n
,
I
d
a
h
o
4"
M
I
N
.
DE
P
T
H
BACKFILL WITH SOIL PLANTING
MIX. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
WATER RETENTION
BASIN MULCH PER PLANS.
KEEP 6-IN AWAY
FROM SHRUB BASE.
COMMERCIAL
FERTILIZER TABLETS
1 Shrub Planting
Scale: NTS
1. NOTIFY LANDSCAPE ARCHITECT WHEN PLACING BOULDERS FOR APPROVAL.
2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION SYSTEM.
3. CLEAN ALL BOULDERS OF DIRT AND LOOSE DEBRIS.
4. WHEN PLACING BOULDERS, BURY 1
4 TO 1
3 OF BOULDER BELOW FINISH GRADE.
5. DO NOT SCAR OR DAMAGE BOULDERS.
NOTES:
FINISH GRADE PER PLANS
COMPACTED SUBGRADE AS
REQUIRED
3' - 4' DIAMETER BASALT BOULDER,
LOCATED PER PLANS
SHRUB
Scale: NTS
Boulder Installation2
03/06/2018