Loading...
Landscape+Plan(25)CK (12)HSB (13)HSB (8)HSB (13)CK (9)HSB Material Legend EXISTING LANDSCAPE TO REMAIN. RETAIN AND PROTECT. PERMA BARK ROCK MULCH AT 3-INCH DEPTH. COLOR AND SIZE TO MATCH EXISTNG. A.CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. B.FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE WITH SITE GRADING PLAN. REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. PLACE 3" OF PERMA BACK ROCK MULCH OVER SUBGRADE SOIL TO ACHIEVE FINISH GRADE. FINISH GRADE RELATED TO ADJACENT SITE ELEMENTS SHALL BE: B.A.1-INCH BELOW TOP OF ADJACENT PAVEMENT, VALVE BOX, VAULT, ETC. B.B.3-INCHES BELOW TOP OF CURB UNLESS NOTED OTHERWISE. C.ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18" OF TOPSOIL. SPREAD, COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE. D.RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE. VERIFY SUITABILITY OF SURFACE SOIL TO PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN NECESSARY. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER: A) PROVIDE APPROVED IMPORTED TOPSOIL, OR B.) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS, PLANTS, SODS, STONES, CLAY LUMPS AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. E.IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEW TOPSOIL THAT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. F.OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF NOT LESS THAN 4 INCHES. G.ALL LANDSCAPE AREAS SHALL BE WEED FREE AT THE TIME OF LANDSCAPE INSTALLATION.REMOVE ALL ROOTS, WEEDS, ROCKS AND FOREIGN MATERIAL ON THE SURFACE. H.NEW SHRUB PLANTING. SEE DETAIL 1 THIS SHEET. I.ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. J.ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF SUBSTANTIAL COMPLETION. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. K.SHRUB PIT BACKFILL PLANTING MIX: BLEND TOPSOIL AND SOIL AMENDMENTS AND FERTILIZER FOR SHRUB PIT BACKFILL AT THE FOLLOWING RATES. BLEND AMENDMENTS WITH THOROUGHLY WITH SOIL BACKFILL. SHRUB PITS SHALL BE 2.5'x2.5'x1' (6.25 CF/ 0.25 CY). K.A.APPLICATION RATES: K.A.A.HUMIC ACID: 2 LBS PER SHRUB PIT K.A.B.COMMERCIAL GRADE COMPOST - 2 CUBIC FEET PER SHRUB PIT K.A.C.PLANTING TABLET FERTILIZER - 2 TABLETS PER SHRUB PIT K.A.D.CALCIFIED DIATOMACEOUS EARTH - 15 LBS PER SHRUB PIT L.IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. M.CONTRACTOR SHALL SUBMIT MATERIAL SAMPLES FOR LANDSCAPE ROCK MULCH TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PROCUREMENT. LANDSCAPE BOULDERS, PHOTO SUBMITTAL IS ADEQUATE. FOR ROCK MULCH, SUBMIT 1 GALLON BAG SAMPLE TO OWNER. N.ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH ENSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. CONTRACTOR SHALL TIE INTO EXISTING IRRIGATION ON SITE TO PROVIDE 100% COVERAGE TO LANDSCAPE IMPROVEMENT AREAS. MATCH EXISTING IRRIGATION TYPE TO ENSURE NEW LANDSCAPE IRRIGATION IS COMPATIBLE WITH EXISTING IRRIGATION DESIGN. Landscape Notes: LARGE BASALT BOULDERS, 3'-4' DIA. TYP. SEE DETAIL 2 THIS SHEET. SHRUBS BOTANICAL NAME / COMMON NAME CONTAINER CK CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER` / FEATHER REED GRASS1 GAL HSB HELICTOTRICHON SEMPERVIRENS `BLUE OATS` / BLUE OAT GRASS1 GAL PLANT SCHEDULE HORIZONTAL SCALE: 1" = 20' Landscape Plan 20'40'0 Pr o j e c t N a m e : Fi l e L o c a t i o n : c: \ u s e r s \ m t h o m a s \ d e s k t o p \ m c d o n a l d s \ l a n d s c a p e p l a n . d w g La s t P l o t t e d B y : mi c h a e l t h o m a s Da t e P l o t t e d : Mo n d a y , M a r c h 5 2 0 1 8 a t 0 4 : 5 6 P M Re v i s i o n s Th i s d o c u m e n t a n d t h e i n f o r m a t i o n c o n t a i n e d h e r e i n m a y n o t b e c o p i e d o r r e p r o d u c e d wi t h o u t e x p r e s s w r i t t e n p e r m i s s i o n o f T h e L a n d G r o u p , I n c . Un a u t h o r i z e d d i s c l o s u r e o r c o n s t r u c t i o n u s e a r e p r o h i b i t e d b y c o p y r i g h t l a w . Date of Issuance: Project No.: Designed by: Checked by: Sheet No.: Sh e e t T i t l e : L1.00 DR MRT 03.05.2018 118000 La n d s c a p e P l a n Mc D o n a l d s La n d s c a p e I m p r o v e m e n t s 19 5 E . C e n t r a l D r . Me r i d i a n , I d a h o 4" M I N . DE P T H BACKFILL WITH SOIL PLANTING MIX. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. WATER RETENTION BASIN MULCH PER PLANS. KEEP 6-IN AWAY FROM SHRUB BASE. COMMERCIAL FERTILIZER TABLETS 1 Shrub Planting Scale: NTS 1. NOTIFY LANDSCAPE ARCHITECT WHEN PLACING BOULDERS FOR APPROVAL. 2. PLACE BOULDERS PRIOR TO INSTALLATION OF IRRIGATION SYSTEM. 3. CLEAN ALL BOULDERS OF DIRT AND LOOSE DEBRIS. 4. WHEN PLACING BOULDERS, BURY 1 4 TO 1 3 OF BOULDER BELOW FINISH GRADE. 5. DO NOT SCAR OR DAMAGE BOULDERS. NOTES: FINISH GRADE PER PLANS COMPACTED SUBGRADE AS REQUIRED 3' - 4' DIAMETER BASALT BOULDER, LOCATED PER PLANS SHRUB Scale: NTS Boulder Installation2 03/06/2018