MER18-0044Sara M. Baker, President
Rebecca W. Arnold, Vice President
Jim D. Hansen, Commissioner
Kent Goldthorpe, Commissioner
Paul Woods, Commissioner
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
April 18, 2018
To: Michelle Brotzman
401 E. Crest Ridge Dr.
Meridian, ID 83642
Subject: MER18-0044 / A-2018-0122
301 NE 3rd St.
Angry Easel
In response to your request for comment, the Ada County Highway District has reviewed the
submitted application and site plan for the item referenced above. It has been determined
that ACHD has site specific conditions of approval for this application.
A. Findings of Fact
1. Parking
a. On-Street Parking Policy: The District may consider on-street parking on a
case-by-case basis taking into consideration the anticipated roadway volumes
and adjacent land uses. If on-street parking is allowed by the District it may be
removed in the future at the discretion of the District if safety conditions warrant.
b. Applicant’s Proposal: The applicant is proposing to utilize the existing
perpendicular parking to 3rd Street abutting the site, located within the right-of-
way.
c. Staff Comments/Recommendations: A power pole and guy wire exist along
the north side of this property and would need to be relocated for access to be
taken from the alley as is typically required. Due to the alley constraints, existing
parking configuration, low traffic volumes on 3rd Street and no additional trips
anticipated in the PM peak hour, staff recommends the parking on 3rd Street
remain.
The applicant should be required to provide a license agreement for the parking
within the right-of-way. The license agreement shall contain but is not limited to a
hold harmless clause.
B. Site Specific Conditions of Approval
1. Provide a license agreement for the parking within the right -of-way, submitted to the
ACHD Development Review Department for acceptance, and impact fee assessment (if
an assessment is applicable).
2. Comply with the Standard Conditions of Approval as noted below.
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
C. Traffic Information
Trip Generation
This development is estimated to generate 0 additional vehicle trips per hour in the PM peak
hour, based on the Institute of Transportation Engineers Trip Generation Manual, 9th edition.
Condition of Area Roadways: Traffic Count is based on Vehicles per hour (VPH)
Roadway Frontage Functional
Classification
PM Peak Hour
Traffic Count
PM Peak Hour
Level of Service
3rd Street 100-feet Collector 93 Better than “D”
King Street 75-feet Local N/A N/A
* Acceptable level of service for a two-lane collector is “D” (425 VPH).
Average Daily Traffic Count (VDT): Average daily traffic counts are based on ACHD’s most
current traffic counts
The average daily traffic count for 3rd Street south of Pine Avenue was 1,613 on May
20, 2016.
If you have any questions, please feel free to contact me at (208) 387-6335.
Sincerely,
Austin Miller
Planner II
Development Services
cc: City of Meridian, via e-mail
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Vicinity Map
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Site Plan
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right -of-way
(including all easements). Any existing irrigation facilities shall be relocated outside of
the ACHD right-of-way (including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located
within the ACHD right-of-way.
3. In accordance with District policy, 7203.6, the applicant may be required to update any
existing non-compliant pedestrian improvements abutting the site to meet current
Americans with Disabilities Act (ADA) requirements. The applicant’s engineer should
provide documentation of ADA compliance to District Development Review staff for
review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged
during the construction of the proposed development. Contact Construction Services at
387-6280 (with file number) for details.
5. A license agreement and compliance with the District’s Tree Planter policy is required
for all landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site
shall be borne by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right -of-way.
The applicant at no cost to ACHD shall repair existing utilities damaged by the
applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least
two full business days prior to breaking ground within ACHD right-of-way. The applicant
shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits
(spare or filled) are compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved
in writing by the District. Contact the District’s Utility Coordinator at 387-6258 (with file
numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual,
ISPWC Standards and approved supplements, Construction Services procedures and
all applicable ACHD Standards unless specifically waived herein. An engineer
registered in the State of Idaho shall prepare and certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in
writing and signed by the applicant or the applicant’s authorized representative and an
authorized representative of ACHD. The burden shall be upon the applicant to obtain
written confirmation of any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review
the site plan and may require additional improvements to the transportation system at
that time. Any change in the planned use of the property which is the subject of this
application, shall require the applicant to comply with ACHD Policy and Standard
Conditions of Approval in place at that time unless a waiver/variance of the
requirements or other legal relief is granted by the ACHD Commission.
_____________________________________________________________________________________________________________
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208-387-6100 • FX 345-7650 • www.achdidaho.org
Request for Appeal of Staff Decision
1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an
applicant of the final decision made by the Development Services Manager when it is
alleged that the Development Services Manager did not properly apply this section
7101.6, did not consider all of the relevant facts presented, made an error of fact or law,
abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement
of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be
charged the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the
Secretary and Clerk of the District, which must be filed within ten (10) working
days from the date of the decision that is the subject of the appeal. The notice of
appeal shall refer to the decision being appealed, identify the appellant by name,
address and telephone number and state the grounds for the appeal. The grounds
shall include a written summary of the provisions of the policy relevant to the
appeal and/or the facts and law relied upon and shall include a written argument
in support of the appeal. The Commission shall not consider a notice of appeal
that does not comply with the provisions of this subsection.
c. Time to Reply: The Development Services Manager shall have ten (10) working
days from the date of the filing of the notice of appeal to reply to the notice of the
appeal, and may during such time meet with the appellant to discuss the matter,
and may also consider and/or modify the decision that is being appealed. A copy
of the reply and any modifications to the decision being appealed will be provided
to the appellant prior to the Commission hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the
appeal will be noticed and scheduled on the Commission agenda at a regular
meeting to be held within thirty (30) days following the delivery to the appellant of
the Development Services Manager’s reply to the notice of appeal. A copy of the
decision being appealed, the notice of appeal and the reply shall be delivered to
the Commission at least one (1) week prior to the hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm
or reverse, in whole or part, or otherwise modify, amend or supplement the
decision being appealed, as such action is adequately supported by the law and
evidence presented at the hearing.