Loading...
A3.0 Exterior Elevations> 5c WEST ELEVATION n EAST ELEVATION NORTH ELEVATION Scale. I'' - 11-01, KEYNOTES 28'-0"x64'-0" MODULAR CLASSROOM— (FOUNDATION, SETTING LEVELING BY BUILDING MOVER. ANCHORING AND SKIRTING BY GENERAL CONTRACTOR. COMPLETED AT TIME OF RELOCATION). EXISTING ASPHALT SHINGLE ROOF TO REMAIN. EXISTING WOOD FASCIA TO REMAIN. PAINT TO MATCH MAIN SCHOOL BUILDING AS SELECTED BY ARCHITECT. EXISTING lx TRIM TYPICAL TO REMAIN. PAINT TO MATCH MAIN SCHOOL BUILDING AS SELECTED BY ARCHITECT. EXISTING PLYWOOD SIDING TO REMAIN. PAINT TO MATCH MAIN SCHOOL BUILDING AS SELECTED BY ARCHITECT. 6� EXISTING 6'-0" x 4'-0" VINYL WINDOW, PROTECT. 7� EXISTING 3'-0" x 6'-8" METAL DOOR AND FRAME. PAINT COLOR PER OWNER. 8� EXISTING GUTTER ON MODULAR CLASSROOM WITH A NEW PRE—FINISHED DOWNSPOUT AT EACH END, COLOR TO MATCH EXISTING PORTABLE BUILDINGS OR PER OWNER. (SHEET—FLOW DOWNSPOUTS TO ADJACENT SODDED FIELD, PROVIDE A NEW CONCRETE SPLASHBLOCK AT EACH DOWNSPOUT AT TIME OF RELOCATION). 9� ELECTRICAL SERVICE ENTRANCE. 10 NEW ADJUSTABLE ADA COMPLIANT ALUMINUM RAMP AND PLATFORM OR STAIR SYSTEM WITH 42" HIGH GUARDRAIL, LANDINGS, AND CONTINUOUS HANDRAILS. SET ON NEW 12"x12"x2" THICK CONCRETE PAVERS. 11 NEW CEMENTITIOUS SKIRTING AND TRIM. PLACE SKIRTING AND TRIM AT TIME OF RELOCATION, PAINT. 12 NEW 9x15 FOUNDATION VENTS INSTALLED IN NEW SKIRTING PER 2012 IBC. PAINTED TO MATCH SIDING, TYPICAL. 13 EXISTING HVAC SYSTEM TO REMAIN. 14 NEW 30x24 HINGED ACCESS DOOR WITH CONTINUOUS HINGE & HASP FOR PADLOCK IN NEW SKIRTING, PAINTED TO MATCH ADJACENT. 15 CAULK ALL HORIZONTAL JOINTS OF SKIRTING, VENTS AND TRIM AND PAINT (2) TOP COATS. SOUTH ELEVATION scale, 1" = P -o LICENSED ARCHITECT AR -1271 / 6 DO AL P. HUTCHISON ISTATE OF IDAHO I 49 .n PROJECT: 181112 FILE: 18102A311I DATE: FEB. 2018 DRAWN: PK REVISIONS: N co O Z M c0 vF- CO z � — Q � � p = J w0 W c 0 0 o U Lu p c� cii - H O �Wrx Zcr U = 0 z Luaw Q Q p �a0 W o ac H z taco O w in W o) Z a� SHEET NO. A3.0