Loading...
Big D Flex Building Landscape Plan8 7 6 5 4 3 2 1 Keyed Notes11 CONDENSERS EQUIPMENT - GROUND MOUNTED CONDENSERS, THIS SHEET ONLY SEE MECHANICAL SHEETS, SCREEN TYP.(3) 16 23 \ \ \ ` \ ASPHALT PAVING -SEE CIVIL WITH 4' HIGH METAL SCREEN TO O SHEETS. MATCH BUILDING, (SEE EXTERIOR NOT CON CTION 6.65 C19\ \ \ \ ' \` ELEVATIONS) PROTECT WITH MATERIAL TRANSITION -LINE S AS GRAPHICALLY _ -- \ \ ' 2 OF MATERIAL TRANSITION, BOLLARD O SEE ADJACENT NOTES FOR SOLID FENCE - AS PER �� SITE MATERIALS TO E USED. 4 Fr�� \ . \�. �• . _ — UDC 11 -3A -14.B. 6 HIGH, A0.1 — + . - — — ' — — BIKE RACK - 2 SPOT BIKE O O SOLID SCREEN FENCE RACK, 'LASTING IMPRSSIONS, �w MODEL # LiS-BR-2HMP' 13 T PEDESTRIAN ACCESS - EXTEND SURFACE MOUNTED RACK, TO PUBLIC SIDEWALK AS TYP. (5) 16 O \ OG ' – – _ _ ----__ a BLACK. OR EQ. SHOWN. ADA PARKING -VAN ACCESSIBLE , i 2 9�1 O�T��/c _ ---__ CONCRETE FLUSH -CONCRETE 14 O O PAINTED SYMBOL &POLE 's SIDEWALK STOOPS, ETC. SEE 2 3 `�20� is \ CIVIL SHEETS MOUNTED SIGN. 17 i/ \ -C6— SITE BOLLARDS - PROVIDE AS 15 PROPERTY LINE - AS SHOWN + _ �� 5O SHOWN ON BOTH THIS SHEET TREES /SHRUBS - AS 8 17 . y + 23 — — — — _ AND CIVIL SHEETS. PROVIDED 16 SC SCHEDULED i 10' LANDSCAPE COUNT SHALL BE THE SUM OF ALL BOLLARDS 17 (N) PERMA-BARK - NEW + 8 ! _ . I BUFFER GRAPHICALLY SHOWN. PERMA-BARK STONE �`\\ I\ •/' • 4 + " / - - - - v, -----� OOP - SEE 6 CURB - 6", SEE CIVIL SHEETS. 18 CONL DRAWINGS FOR S IZE O o+ _ - - - 6 ` �a� -- + --- - - AV _ _ \� . . . . . C21 23 I ADA CURB RAMP - 1:12, SEE , O CIVIL SHEETS. 19 NEW SLIDING - SOLID GATE, 24 W 7 I , 18.98' ( PLANTER - AT PARKING LOT,20 VISION TRIANGLE - AS SHOWN. (PARKING ACCESS / STREE O g WIDTH AS NOTATED., . I \ 13 – – +.– – . —. .– – \ DISTANCE)4 PROVIDE GROUND COVER. PEDESTRIAN SIDEWALK RAMPS 1 _ . _ . _ • _ • _ . _ • ... _ • _ y. - +- 9O NEW SITE ACCESS - RADIUS 21 - AS GRAPHICALLY SHOWN. SEE ASPHALT APPROACH, INSTALL CIVIL SHEETS FOR MORE REQS J - 1 = _ _ _� _ _____ / __ ____ ____ \� + 1 A 'S AS ACRD R EQMAN DOOR - WITH LOCKSET 22 r 13 -- 10 K 0 CIX MATCHED TO BUILDING, SOLID NOX / RAPED OMMON v Q 14 17'LOCK METAL L 8 + + 8 _ 17 15 LOCK LINK. 23 GRASS SOD -PER ORD 05-1170 + - 28 29 30 16 (25) 17 16 17 18 19 Landscape Notes Legend w 7/17 17 �— 8 .+_ Applicable to this Sheet only } �_ Y, � 4 � � 01: SHADE, 2" I DESIGN BUILD LANDSCAPE IRRIGATION REQUIREMENTS: — caliper + i Amur Maple: 0 5' LANDSCAPE �' BUFFER 177 1 - EXISTING VEGETATION - THERE IS NO NOTEWORTHY /ii /1 Acer Ginnala VEGETATION ON SITE. EXISTING LANDSCAPE CONSISTS ` Z - F "Oe _ _ � OF OLD FARM LAND, WEEDS, ETC. w I� 31 � — — — — — — 2 LANDSCAPE IRRIGATION LANDSCAPED AREAS 02: SHADE, 2" - caliper Little LOCATED WITHIN THE 20' LANDSCAPE BUFFER ALONG + SKYWAY DRIVE AND THE PARKING LOT PLANTERS SHALL Leaf Linden: a + 17 +.I HAVE AN UNDERGROUND IRRIGATION SYSTEM. Tllia Cordata 3 PRECIPITATION RATES IRRIGATION t 0 7--'I a �.✓ 21 22 23 24 I -EQUAL -THE SYSTEM SHALL BE DESIGNEDTO HAVE EQUAL 03: TREE American 8 + O � 16 (8) I PRECIPITATION RATES BASED OFF OF ZONE CONTROL, NOT NOZZLE VARIATION. Arborvitae: Thuja 06 U m D f \ I• t 8 occidentalis El 17 I 4 - ZONE PRESSURE & VOLUME - THE ZONING OF THE SYSTEM SHALL BE BASED OFF OF THE CITY WATER LU J VOLUME CAPACITY &PRESSURE, NOT THE PRESSURIZED 04: FLOWER, two IRRIGATION SOURCE. PROVISION OF A PRESSURE [ ) V� `/ W REGULATOR SHALL BE REQUIRED. gallon, min. Belgian _ = 0 z Hybrid Orange Bush LL LU I 5 - LANDSCAPE IRRIGATION CONTROLLER - THE Lily: Clivia miniata LL 0 I +' I IRRIGATION CONTROLLER PROVIDED SHALL HAVE Belgian Hybrid SEPARATE ZONE WIRES (NO DECODERS). ZONE QUANTITY Orange' O Q SHALL ADEQUATE TO WATER EACH REQUIRED ZONE SEPARATELY. CONNECTION OF MULTIPLE VALVES TO A N (] + I TOS / FF: BLDG. 26 5' S' LANDSCAPE BUFFER SINGULAR ZONE IN THE CONTROLLER SHALL NOT BE 05: SHRUBS, two ALLOWED. gallon, min. 6 - CONTROLLER LOCATION -THE IRRIGATION Snow Day Blizzard M� Q W (n � 0 J rl �, m Lr) Ln W v ' } \ I 41.50 12, 12S Sf CONTROLLER SHALL BE LOCATED INSIDE THE NEW pearl Bush: v / � V N Ln C:) ° I 3,5p60 sf 1 FACILITY. AND SHALL BE INSTALLED TO BE FULLY FUNCTIONAL AT TIME OF SUBSTANTIAL COMPLETION. Exochorda'Blizzard' M QJ, pO 00 0 I 15,685 sf __-- O 7- UNDERGROUND SLEEVES- COORDINATE REQUIRED 06: SHRUBS, two LATERAL & MAINLINE IRRIGATION PIPE AND L.L.I a J CONTROLLER CONDUCTOR SLEEVES WITH CONTRACTOR. gallon, min. Snow C) - I �---- : �' SLEEVES FOR CONDUCTORS AND PIPE SHALL BE Bush: Breynia disticha SEPARATE. U _ _ - _ 27 Roseo-picta LANDSCAPE: Z � 9 \\,I — + ° o _ 23 STREET BUFFER: MIN. ERIMETER PARKING LANDSCAPE: 269'-6" (FRONTAGE) / 35' = 7.7 OR 8 TREES 11-3B-8 [�5'PER Z O N N W ti i w - j REQ'D # OF TREES # OF SPECIES INTERNAL W/ MORE THAN 12 SPACES 5-10 2 Lu J J (0 11-30 3 SPACES MAX. W/O ISLAND 31-50 4 r,412 m w In 1 TREE PER SINGLE ISLAND TREE PER DOUBLE ROW ISLAND 2 Q Z CC M o 00 mm O B ° I o ww J_ B u m W O LU � Ln co W U LOT 2 SCREENEDSTOR LU Z = 64,507 sf. I Q YARDAGE I J 1.48 AC I = 1 = o 4 A0.1 oM CC 00 Q9 SOLID SCREEN Site Calculations -I --N v FENCE SQUARE FOOTAGES PROVIDED Q v\ Ln I I BUILDING FOOTPRINT 12,125 sf U O oo _Z -c Cc � a OUTBUILDING FOOTPRINT C6_ 000 sf MEZZANINE FLOOR SPACE 3,560 sf N O 'n 30 x 192 I �-I cu O Ln O 5, 760 sf I HARD SURFACE 35,235 SF� 'IT L a Ln 729 FS BUFFER 039 SF. LANDSCAPING (TOTAL):r387 Date: E3/23/18� Project: BIGD Building OFFSET (INCL. PARKING) SFINTERNAL 5 SF. Drawn by: S.Marshall T.Tran A - — — - — — - — — ' — — — ' i – TOTAL SITE 64,507 SF. Version History: A PUBLIC PARKING REQUIRED PROVIDED 11 -3C -6-B STANDARD STALLS 29 29 (1:500 Bldg. s.f.) 25% PROGRESS NORTH DRAWING NO. VANACAPSTALLS 1v+15 1v+1s Landscape Plan 3-30-18 N VAN CCESSABLE L1m (1 - 25 = 1 stall) 0 5 10 15 25 35 S COMPACT STALLS 0 0L (not allowed in calculations 1 per City code) TOTAL PARKING 31 31 Landscape Plan 8 7 6 5 4 3 2 1