A2.02 Partial Level 02 & Canopy Roof PlanON-CALL
2M3201
16.2
16
15
14
10
'
-
0
"
S
P
A
C
I
N
G
T
Y
P
I
C
A
L
@
VE
R
T
I
C
A
L
S
C
R
E
E
N
W
A
L
L
P
O
S
T
S
6'
-
4
"
1
A2.11
1
A
2
.
1
0
2
A2.11
1
TYP.
1
TYP.
2
6
7
9
9
11'-4"
10'-0" SPACING TYPICAL @
VERTICAL SCREEN WALL POSTS
1
1
2
3
4
4
5
ON-CALL LOUNGE/
OFFICE
7
6
6
SEE ENLARGED SITE PLAN ON SHEET: A1.10
FOR CHILLER LOCATION AND DETAILS
NOTE:
PLAN ORIENTATION DIFFERS FROM SITE
PLANS
8
9'-8"
10
10
10
YXW.4W Y.5
2
A2.11
SCALE:
PARTIAL LEVEL 02 FLOOR PLAN/ CANOPY ROOF PLAN
1/4" = 1'-0"1 NORTH
GENERAL NOTES
A.SEE OVERALL SITE PLAN ON SHEET: A1.00 AND ENLARGED SITE PLAN
ON SHEET A1.10 FOR ADDITIONAL INFORMATION.
B.SEE EXTERIOR ELEVATIONS ON SHEETS: A2.10 AND A2.11.
KEYNOTES
1.EXISTING ROOF PARAPET/ PRE-CAST CONCRETE CAP.
2.EXISTING MECHANICAL SHAFT/ LOUVERS.
3.NEW LOUVER AT MECHANICAL DUCTWORK PENETRATION. MATCH
ADJACENT EXISTING LOUVERS.
4.EXISTING TAPERED (INSULATED) ROOF SYSTEM TO REMAIN. DEMO
BALLAST AND MEMBRANE AND REPLACE WITH NEW SINGLE-PLY
MEMBRANE.
5.DEMO PORTION OF EXISTING WALL AND WINDOW. ADD NEW DOOR &
FRAME (INSULATED HOLLOW METAL) AND WINDOW (ALUMINUM
STOREFRONT). WINDOW FINISH: MEDIUM BRONZE (MATCH EXISTING)/
DOOR & FRAME: PAINT TO MATCH EXISTING EXTERIOR DOORS.
6.NEW SCREEN-WALL CONSTRUCTED OF HSS TUBING AND INFILL
LOUVERS/ SOLID METAL PANELS. SEE EXTERIOR ELEVATIONS FOR
DETAILS.
7.METAL GUARDRAIL, 42" HIGH FROM ROOF LEVEL. SEE EXTERIOR
ELEVATIONS FOR DETAILS.
8.NEW AIR HANDLER UNIT.
9.EXPOSED MECHANICAL DUCTWORK.
10.RAISED STRUCTURAL FRAME SYSTEM (AHU SUPPORT) WITH GRATING
WALK SYSTEM.
#
SHEET
SHEET TITLE
CHECKED
REVISED
DRAWN
PROJECT DATE
BNS
#17-534
ECN - STY
17066 03-05-18
ST
A
M
P
MM
C
O
R
A
I
R
H
A
N
D
L
E
R
13
0
7
N
.
3
9
T
H
S
T
R
E
E
T
SU
I
T
E
1
0
3
NA
M
P
A
,
I
D
A
H
O
8
3
6
8
7
PH
.
(
2
0
8
)
4
6
5
-
3
4
1
9
HO
U
S
T
O
N
B
U
G
A
T
S
C
H
AR
C
H
I
T
E
C
T
S
,
C
H
A
R
T
E
R
E
D
NOT
F
O
R
CON
S
T
R
U
C
T
I
O
N
PR
E
L
I
M
I
N
A
R
Y
52
0
S
O
U
T
H
E
A
G
L
E
R
O
A
D
ME
R
I
D
I
A
N
,
I
D
A
H
O
A2.02
PARTIAL
LEVEL 02
& CANOPY
ROOF PLAN
DRAWING LEGEND
STRUCTURAL PLATFORM EXTENT/
STEEL GRATING WALK SYSTEM
AIR HANDLER UNIT
EXTERIOR ELEVATION MARKER
SEE SHEETS: A2.10 & A2.11