Loading...
A2-0-Exterior+ElevationsGENERAL NOTES 1 REFER TO SHEET A4.0 FOR FINISH SCHEDULE OO KEY NOTES: •- - --- - - - - .^ - -- -- --- 1 BREAK METAL; CLEAR ANODIZED COLOR TO MATCH STOREFRONT NOT FOR ONSTRUCTIO 2 BUILDING SIGNAGE PROVIDED BY OWNER UNDER SEPERATE PERMIT. 3 MECHANICAL EQUIPMENT BEYOND 4 NOT USED 5 METAL AWNING, PROVIDED AND INSTALLED BY OWNER. 10 P-6 3 10 TYP. 11 P-6 2 10 IYP. T.O. FRAMING 6 LINE OF ROOF DECK BEYOND. 7 EXTERIOR AWNING LIGHTING; RE: ELECTRICAL 8 EXTERIOR LIGHTING; RE: ELECTRICAL E CAR 3 p 71 + m m C 2 �•'' � N m - 125' -two" P -s T.O. ` - FC -177 b O F°-1 9 4' PRE—FINISHED METAL REVEAL; RE: 14/A3.3 10 METAL CAP FLASHING, REFER TO 15/A3.3, PAINT AS SCHEDULED 11 METAL EXPANSION JOINT; RE: 10/A3.3 12 RAISED STUCCO STAR; RE: 12/A3.4. CENTER BETWEEN STUCCO BAND AND PARAPET CAP AND BETWEEN CONTROL JOINTS/EDGE OF BUILDING. 13 SACK EXPOSED FOUNDATION WITH COLOR MATCH STUCCO, TYP. EF -2 ¢amaeass C.�O a 0 xx-x EXTERIOR FINISH SCHEDULE -1 STONE VENEER - CORONADO STONE PRODUCTS; HONEY LEDGE, COLOR: CARMEL MOUNTAIN d) 23 23 EF -1 INTEGRAL COLOR STUCCO - SHERWIN WILLIAMS, COLOR: BLACK FOX 7020 AW -1 5 EF -2 EF -2 INTEGRAL COLOR STUCCO - SHERWIN WILLIAMS, COLOR: DOVETAIL 7018 EF -3 INTEGRAL COLOR STUCCO - SHERWIN WILLIAMS, COLOR: BALANCED BEIGE 7037 AW -1 7 5 7 5 AW -1 EF -1 -1 9 48.O�INDOW/B.Q T 103'-2 O O O O O ❑ / JL B.C. AW 109T FC -1 FIBER CEMENT BOARD - HARDI, COLOR: SHERWIN WILLIAMS TANGER 6601 WILLIAMS This document is the property of the 00100 of architecture and des and Is protected by U. and International laws. Use, re p rod u at I on ar modification of this document without first obtaining the written permission of the offles o1 architecture and dstilpn is prohibited. This document may not be used in any unauthorized manner. C 2017 AW -1 METAL AWNING - COLOR: BLACK FOX MT -1 CHANNEL SCREED - FRY REGLET, COLOR: CLEAR ANODIZED P-1 PRE—FINISHED METAL COLOR TO MATCH SHERWIN WILLIAMS BLACK FOX 2020 P-6 PRE—FINISHED METAL, COLOR TO MATCH SHERWIN WILIAMS TANGER 6601 2 T.O. ------- _Lt O. 100'-0" EF —1 11 FC -1 13 1 6 13 13 8 0 O Q m Q) aa $ a d aD L U� WEST ELEVATION 10 2 P T.O. $'-10" ToiING _ 4130 T.O. FRAMING 11 EF -4 10 P-6 11 10 TYP °r q T 12� — \ I 14 T.O. FRAMING _ 4122'-10" PROJECT: 170301 DATE: 11/20/17 / EF -2 DRAWN: CHECKED: 6 EF -1 EF -2 C'ZC'/ design review 5 AW -1 AW -1 7 S - ". �R wTE oEscanrax B.O. STUCCO BAND AW -1 5 _ 109'-8" 11 —� TYP. EF -2 C � - �aTT�T��. $B.O. TRIM 4103-2 EXTERIOR i ELEVATIONS T.O. SLAB 4 0 10 -0• - - ff-1 ST -1 EF -1 ST -1 13 MT -1 9 1 11 MT -1 9 11 SHEET NUMBER A2e0 FF ECTNUMBEM: _ EAST ELEVATION 1 ia••=r-a• 2