Loading...
Ambrose Phase 6 - A-05-01_Ext_Elevations(1 West Elevation ) Scale: 1/8" = 1'-0" 34'-0" 0 76200. C 1 1 81113.A1 Existing (Phase 4) 47200.A1 New Phase 6 73113.A1 e 0 5 85200.A1 3 X 4 42'-0" 28'-0" New mase 2 South Elevation Scale: 1/8" = 1'-0" 42'-0" New mase b xlsttng (Phase 5) 3 East Elevation Scale: 1/8" = 1'-0" General Notes 1. ALL NEW EXTERIOR MATERIALS AND COLORS SHALL MATCH EXISTING. Reference Notes OEXISTING CONSTRUCTION, TO REMAIN. OSTUCCO COLOR S1. LIGHT TAUPE OSTUCCO COLOR S2. OFF-WHITE OSTUCCO ACCENT BAND / LINTEL ELEMENT W/ 1" OFFSET FROM WALL PLANE. OSTUCCO CONTROL JOINT. OCONCRETE LOADING LANDING. ODECORATIVE PREFINISHED METAL SCUPPER. Keyed Notes DIVISION 4 - WOOD & PLASTICS 47200.A1 MANUFACTURED STONE VENEER DIVISION 7 - THERMAL & MOISTURE PROTECTION 73113.A1 COMPOSITION SHINGLES 76200.C1 PRE -FINISHED METAL COPING, 24 GA. 76200.D2 PRE -FINISHED DOWNSPOUT, 24 GA. DIVISION 8 - OPENINGS 81113.A1 HOLLOW METAL DOOR 84113.A1 ALUMINUM STOREFRONT DOOR / WINDOW FRAMING 84113.131 ALUMINUM ENTRANCE DOOR 85200.A1 METAL CLAD WOOD WINDOW, CASEMENT OPERATION DIVISION 9 - FINISHES 92400.A1 EXTERIOR PORTLAND CEMENT STUCCO SYSTEM. 7/8" min A R C HI T E C T S 2400 E RIVERWALK DRIVE BOISE, IDAHO 83706 WWW.LKVARCHITECTS.COM 208.336.3443 PRELIMINARY 0 NOT FOR CONSTRUCTION Co O V W v,E Co O -r- O n i V! v! CO _0 0U Q � � DATE: November 20, 2017 LKV PROJECT #: 1702 REVISIONS: DRAWN BY: MS CHECKED BY: WT P & Z Review Set DRAWING NO. A-5.1