Loading...
Ambrose Phase 6 - 0SD-01-02_Site_PlanCONCRETE APRON (2) 12' WIDE STEEL GATES Trash Enclosure Scale: 1"=10'-O" 7'-4" TALL SPLIT FACE CMU SCREEN WALL. PAINT TO MATCH BUILDING (2) 8 YARD DUMPSTERS Existing Multi -Purpose Sports Field LJ s i I One Way a F_ 7 io 3 See Sheet N SD -1.1 Existing Driveway I _ I n� Building Phase 3 _1 — \ n Building Phase 5 �n= I. �I n I� �I I I I I I I I I I I I I I I I I I I I I I I I Building Phase 4 0 0 N J;A L I � I k TT I 7 See Sheet Existing Driveway 2 0 �SD-1.11 I N n Min 13'-1" 26'-0" Li 0 \ New Driveway co New Parking (63) Spaces 26-0" 1 19'-0" 1 19'-0" 0 New Driveway � N 0 0 N 9'-1" SPACES = I I Future Storage Building (N.I.C.) I I � 0 N u Cn w U Q co 0 EY) W U) w U Q U) I 33 19'-0" ====!L---I---_� 16 M 35' Landscape Buffer & Utility Easement -------------------------------------------------------- ------------------------ N. Locust Grove Road Phase 6 Partial Site Plan N. Scale: 1" = 20'-0" 6 ME I co N 25'-0" General Notes 1. ALL IMPROVEMENTS NOT NOTED "NEW", "FUTURE", OR "N.I.C." ARE EXISTING AND HAVE RECEIVED PRIOR CZC APPROVAL. 2. SEE LANDSCAPING PLANS FOR PLANT MATERIALS AND PRESSURIZED IRRIGATION SYSTEM. Legend Notes DIVISION 3 - CONCRETE New Min. 9'x19' Standard Parking Space, U.N.O. CONCRETE SLAB ON GRADE (EXTERIOR), 4" New 9'x19' Handicap Parking Space with Min. 9'x19' Adjacent Buil ling Phase 2 WELDED WIRE MESH REINFORCING hl EXPANSION JOINT, FIBER BOARD, 1/2" DIVISION 31 - EARTHWORK 312300.61 Paving FUTURE STORAGE BUILDING AREA Concrete Curb ZONING DISTRICT: '-0" Swale / Berm (:::�Ci SETBACKS: ontours (LANDSCAPE BUFFERS) Fence or Gate as Noted IIIIIIIIIII New Bike Rack (12'-6", 5 Spaces) ❑ Drain Swale Percolation Bed FH I PARKING REQUIRED AT 1:500: Existing / Relocated Pole Mounted Site Lighting with Shielded PHASES 1-6 PARKING PROVIDED: Fixture. STANDARD New Pole Mounted Site Lighting with Shielded Fixture. HANDICAP Building Phase 3 _1 — \ n Building Phase 5 �n= I. �I n I� �I I I I I I I I I I I I I I I I I I I I I I I I Building Phase 4 0 0 N J;A L I � I k TT I 7 See Sheet Existing Driveway 2 0 �SD-1.11 I N n Min 13'-1" 26'-0" Li 0 \ New Driveway co New Parking (63) Spaces 26-0" 1 19'-0" 1 19'-0" 0 New Driveway � N 0 0 N 9'-1" SPACES = I I Future Storage Building (N.I.C.) I I � 0 N u Cn w U Q co 0 EY) W U) w U Q U) I 33 19'-0" ====!L---I---_� 16 M 35' Landscape Buffer & Utility Easement -------------------------------------------------------- ------------------------ N. Locust Grove Road Phase 6 Partial Site Plan N. Scale: 1" = 20'-0" 6 ME I co N 25'-0" General Notes 1. ALL IMPROVEMENTS NOT NOTED "NEW", "FUTURE", OR "N.I.C." ARE EXISTING AND HAVE RECEIVED PRIOR CZC APPROVAL. 2. SEE LANDSCAPING PLANS FOR PLANT MATERIALS AND PRESSURIZED IRRIGATION SYSTEM. Legend Notes DIVISION 3 - CONCRETE New Min. 9'x19' Standard Parking Space, U.N.O. CONCRETE SLAB ON GRADE (EXTERIOR), 4" New 9'x19' Handicap Parking Space with Min. 9'x19' Adjacent ® Access Aisle and H.0 Parking Signage. See Details WELDED WIRE MESH REINFORCING Concrete Curb and Gutter New Asphalt EXPANSION JOINT, FIBER BOARD, 1/2" DIVISION 31 - EARTHWORK 312300.61 Paving FUTURE STORAGE BUILDING AREA Concrete Curb ZONING DISTRICT: '-0" Swale / Berm (:::�Ci SETBACKS: ontours (LANDSCAPE BUFFERS) Fence or Gate as Noted IIIIIIIIIII New Bike Rack (12'-6", 5 Spaces) ❑ Drain Swale Percolation Bed FH Existing Fire Hydrant PARKING REQUIRED AT 1:500: Existing / Relocated Pole Mounted Site Lighting with Shielded PHASES 1-6 PARKING PROVIDED: Fixture. STANDARD New Pole Mounted Site Lighting with Shielded Fixture. HANDICAP Existing Type I Mast Arm Street Light BICYCLE PARKING Parking / Driveway Related Signage T See Site Signage Schedule Reference Notes ONEW CONCRETE SIDEWALK. SEE DETAILS. OEXISTING 6" DRAIN LINE TO EXISTING RETENTION AREA FOR PHASE 2 THROUGH PHASE 6 ADDITIONS. RETENTION AREA DESIGNED AND APPROVED PREVIOUSLY FOR GYMNASIUM AND FUTURE CONSTRUCTION. 3O EXISTING / NEW FIRE LANE. OEXISTING BUILDING UTILITY ENTRY LOCATIONS. 5O EXISTING FIRE RISER ROOM. 6O EXISTING SEWER LINE TO MAIN IN STREET. OINSTALL 6" ASTM D3034 PVC PIPE FROM EXISTING STUB TO NEW PHASE 6 ROOF DRAIN CONNECTION. 1% MIN. SLOPE. OEXISTING 6" STORM DRAIN PIPE, SAND AND GREASE TRAP, AND SEEPAGE BED DESIGNED AND APPROVED PREVIOUSLY FOR BUILDING PHASES 2 AND 5 GYMNASIUMS AND FUTURE PHASE 6 CONSTRUCTION. OINSTALL 4" PVC SERVICE TO ROOF DRAIN CONNECTION. 1% MIN. SLOPE. 10 SEE SHEET E1.0 FOR SITE LIGHTING REQUIREMENTS. 11 NEW BIKE RACK. (5) SPACES. 12 EXISTING BIKE RACK. (5) SPACES. 13 NEW TRASH ENCLOSURE SEE DETAIL. 14 NEW PASSENGER LOADING / UNLOADING LANE. 15 DO NOT ENTER, ONE WAY SIGN. 16 ENLARGED STORM WATER RETENTION AREA. Keyed Notes DIVISION 3 - CONCRETE 33000.C2 CONCRETE SLAB ON GRADE (EXTERIOR), 4" 56,268 SQ. FT. U.N.O. 33000.J1 WELDED WIRE MESH REINFORCING 33000.K3 EXPANSION JOINT, FIBER BOARD, 1/2" DIVISION 31 - EARTHWORK 312300.61 DRAINAGE FILL COURSE, 4" THICK, 3/4" MINUS Site Data TOTAL SITE AREA: 352,451 SQ. FT. PHASES 1-6 BUILDING FOOTPRINT AREA 56,268 SQ. FT. PHASES 1-6 PAVED AREA 127,376 SQ. FT. *PHASES 1-6 LANDSCAPED AREA 157,491 SQ. FT. PLAYGROUND 6,664 SQ. FT. EXISTING STORAGE BUILDING AREA 3,452 SQ. FT. FUTURE STORAGE BUILDING AREA 1,200 SQ. FT. ZONING DISTRICT: C -C SETBACKS: FRONT: 35'-0" (LANDSCAPE BUFFERS) STREET SIDE: 38'-0" INTERIOR SIDE: 25'-0" REAR: 20'-0" GROSS BUILDING AREA (PHASES 1-6): 80,953 PARKING REQUIRED AT 1:500: 162 PHASES 1-6 PARKING PROVIDED: 195 STANDARD 187 HANDICAP 8 BICYCLE PARKING 10 PHASES 1-6 PASSENGER LOADING: 40 *INCLUDES ALL LANDSCAPE BUFFERS IL V !SY= A R C H IT E C T S 2400 E RIVERWALK DRIVE BOISE, IDAHO 83706 WWW.LKVARCHITECTS.COM 208.336.3443 PRELIMINARY Q) NOT FOR CONSTRUCTION M 1 ^� O -1--+ V � Q cn E O ^�^ O W `V _0 S_ E 0 N DATE: November 20, 2017 LKV PROJECT #: 1702 REVISIONS: DRAWN BY: MS CHECKED BY: WT P & Z Review Set DRAWING NO. SD -1.2