Abrose School Phase 6 Revised Elevation Plans(1 West Elevation
) Scale: 1/8" = 1'-0"
Existing
(Phase 4)
nIAMAI vnnco P%
2 South Elevation
Scale: 1/8" = 1'-0"
42'-0"
28'-0"
18'-0"
3 East Elevation
Scale: 1/8" = 1'-0"
73113.A1
76200.C1
47200.A1
3 4
81113.A1
New Phase 6
New F'nase
84113.131
92400.A1
TYP.
111
81113.A1
34'-0"
Existing
(Phase 5)
General Notes
1. ALL NEW EXTERIOR MATERIALS AND COLORS SHALL MATCH
EXISTING.
Reference Notes
OEXISTING CONSTRUCTION, TO REMAIN.
2O STUCCO COLOR S1. LIGHT TAUPE
O3 STUCCO COLOR S2. OFF-WHITE
OSTUCCO ACCENT BAND / LINTEL ELEMENT W/ 1" OFFSET
FROM WALL PLANE.
O5 STUCCO CONTROL JOINT.
O6 CONCRETE LOADING LANDING.
O7 DECORATIVE PREFINISHED METAL SCUPPER.
Keyed Notes
DIVISION 4 - WOOD & PLASTICS
47200.A1 MANUFACTURED STONE VENEER
DIVISION 7 - THERMAL & MOISTURE PROTECTION
73113.A1 COMPOSITION SHINGLES
76200.C1 PRE -FINISHED METAL COPING, 24 GA.
76200.D2 PRE -FINISHED DOWNSPOUT, 24 GA.
DIVISION 8 - OPENINGS
81113.A1 HOLLOW METAL DOOR
84113.A1 ALUMINUM STOREFRONT DOOR / WINDOW FRAMING
84113.131 ALUMINUM ENTRANCE DOOR
85200.A1 METAL CLAD WOOD WINDOW,
CASEMENT OPERATION
DIVISION 9 - FINISHES
92400.A1 EXTERIOR PORTLAND CEMENT STUCCO
SYSTEM. 7/8"
L= _V
L=1
A R C H I T E C T S
2400 E RIVERWALK DRIVE
BOISE, IDAHO 83706
WWW.LKVARCHITECTS.COM
208.336.3443
PRELIMINARY
NOT FOR
CONSTRUCTION
Co
L_ -1-0
V
W Q
U)E
M O
^I—Z O
U)
_C
0-
E
`
v �
M
DATE: November 20, 2017
LKV PROJECT #: 1702
REVISIONS:
QDecember 7, 2017
DRAWN BY: MS
CHECKED BY: WT
P & Z Review Set
DRAWING NO.
A-5.1