Loading...
Abrose School Phase 6 Revised Elevation Plans(1 West Elevation ) Scale: 1/8" = 1'-0" Existing (Phase 4) nIAMAI vnnco P% 2 South Elevation Scale: 1/8" = 1'-0" 42'-0" 28'-0" 18'-0" 3 East Elevation Scale: 1/8" = 1'-0" 73113.A1 76200.C1 47200.A1 3 4 81113.A1 New Phase 6 New F'nase 84113.131 92400.A1 TYP. 111 81113.A1 34'-0" Existing (Phase 5) General Notes 1. ALL NEW EXTERIOR MATERIALS AND COLORS SHALL MATCH EXISTING. Reference Notes OEXISTING CONSTRUCTION, TO REMAIN. 2O STUCCO COLOR S1. LIGHT TAUPE O3 STUCCO COLOR S2. OFF-WHITE OSTUCCO ACCENT BAND / LINTEL ELEMENT W/ 1" OFFSET FROM WALL PLANE. O5 STUCCO CONTROL JOINT. O6 CONCRETE LOADING LANDING. O7 DECORATIVE PREFINISHED METAL SCUPPER. Keyed Notes DIVISION 4 - WOOD & PLASTICS 47200.A1 MANUFACTURED STONE VENEER DIVISION 7 - THERMAL & MOISTURE PROTECTION 73113.A1 COMPOSITION SHINGLES 76200.C1 PRE -FINISHED METAL COPING, 24 GA. 76200.D2 PRE -FINISHED DOWNSPOUT, 24 GA. DIVISION 8 - OPENINGS 81113.A1 HOLLOW METAL DOOR 84113.A1 ALUMINUM STOREFRONT DOOR / WINDOW FRAMING 84113.131 ALUMINUM ENTRANCE DOOR 85200.A1 METAL CLAD WOOD WINDOW, CASEMENT OPERATION DIVISION 9 - FINISHES 92400.A1 EXTERIOR PORTLAND CEMENT STUCCO SYSTEM. 7/8" L= _V L=1 A R C H I T E C T S 2400 E RIVERWALK DRIVE BOISE, IDAHO 83706 WWW.LKVARCHITECTS.COM 208.336.3443 PRELIMINARY NOT FOR CONSTRUCTION Co L_ -1-0 V W Q U)E M O ^I—Z O U) _C 0- E ` v � M DATE: November 20, 2017 LKV PROJECT #: 1702 REVISIONS: QDecember 7, 2017 DRAWN BY: MS CHECKED BY: WT P & Z Review Set DRAWING NO. A-5.1