Loading...
AS102_SITE DETAILSM X 00 M1� 6" DIA STEEL PIPE FILLED WITH CONCRETE. SEE DETAIL 5/AS102 6" CONCRETE SLAB W/#4 BARS @24" 0. C. EACH WAY MIS 3-1/2" DIA. POST - SCHEDULE 40 TYP. SEE DETAIL 4/AS102 10" DIA. X 36" POST FOOTING TYP. ®01 0 12'-0" ENCLOSURE PLAN 1 SCALE: 1/4" = 1'-0" 3-1/2"0 PO SCHEDULE 41 0 a 2T-0" PROVIDE INDUSTRIAL GATE HINGES (2) A( 3 " EXPANSION JOINT EXISTING ASPHALT PAVING DRILL SLAB 3"DIA. X 1" DEEP FOR CANE (0 BOLTS / w o (D 2 0, o EXPANSION - JOINT VERIFY EACH GATE OPENING TO SWING MIN.12ODEG. PROVIDE 4"DIA. X 1 " DEEP NOTCH IN SLAB FOR CANE BOLTS STOPS EACH SIDE CONCRETE APRON FRONT ELEVATION SCALE: 1/2" = 1'-0" 'AP STEEL WIRE LINK FENCING -AN VINYL Y SLATS ,ADE GATE YP FENCE TING, TYP. SIDE ELEVATION 3 SCALE: 1/2" = V-0" Iml Y2" EXPANSION JOINT ASPHALT PAVEMENT \ REINF. CONC. APRON 00 8 3/16"0 Do PIPE SECTION SCALE: 1/2" = 1'-0" ROUNDED CONCRETE CAP 6"0 STANDARD STEEL PIPE- CONCRETE FILLED PAINTED YELLOW EXPANSION — JOINT AROUND PIPE BOLLARD FINISH PAVING 16"0 CONCF FOUNDATIOP NOTE: VERII LOCATION 0 UNDERGROU UTILITIES BE DRILLING FC CONCRETE FOUNDATION. 'Lut BOLLARD 5 SCALE: 3/4" = V-0" CAP 3" DIA. SCHEDULE 40 GATE POST Y2" EXPANSION JOINT I I• I• I I '1 � I I I I COMPACT E I II I; �• �10"O x 36" GATE POST _L J FOOTING 10 1/4" :N o I I I I I' v _ a . ENCLOSURE PLAN 1 SCALE: 1/4" = 1'-0" 3-1/2"0 PO SCHEDULE 41 0 a 2T-0" PROVIDE INDUSTRIAL GATE HINGES (2) A( 3 " EXPANSION JOINT EXISTING ASPHALT PAVING DRILL SLAB 3"DIA. X 1" DEEP FOR CANE (0 BOLTS / w o (D 2 0, o EXPANSION - JOINT VERIFY EACH GATE OPENING TO SWING MIN.12ODEG. PROVIDE 4"DIA. X 1 " DEEP NOTCH IN SLAB FOR CANE BOLTS STOPS EACH SIDE CONCRETE APRON FRONT ELEVATION SCALE: 1/2" = 1'-0" 'AP STEEL WIRE LINK FENCING -AN VINYL Y SLATS ,ADE GATE YP FENCE TING, TYP. SIDE ELEVATION 3 SCALE: 1/2" = V-0" Iml Y2" EXPANSION JOINT ASPHALT PAVEMENT \ REINF. CONC. APRON 00 8 3/16"0 Do PIPE SECTION SCALE: 1/2" = 1'-0" ROUNDED CONCRETE CAP 6"0 STANDARD STEEL PIPE- CONCRETE FILLED PAINTED YELLOW EXPANSION — JOINT AROUND PIPE BOLLARD FINISH PAVING 16"0 CONCF FOUNDATIOP NOTE: VERII LOCATION 0 UNDERGROU UTILITIES BE DRILLING FC CONCRETE FOUNDATION. 'Lut BOLLARD 5 SCALE: 3/4" = V-0" CAP 3" DIA. SCHEDULE 40 GATE POST Y2" EXPANSION JOINT I I• I• I I '1 � I I I I COMPACT E I II I; �• �10"O x 36" GATE POST _L J FOOTING 10 1/4" F3,7 SECTION COPYRIGHT 2017 BRS ARCHITECTS ALL RIGHTS RESERVED. REPRODUCTION OR TRANSLATION OF ANY PART OF THIS WORK WITHOUT WRITTEN PERMISSION OF BRS ARCHITECTS IS UNLAWFUL AND SUBJECT TO CRIMINAL PROSECUTION. LICENSED ARCHITECT AR -2782 7-24- 7 , RENT K CI STATE OF IDAHO :N I I I I I' v •I . I I• I I I I L—J v F3,7 SECTION COPYRIGHT 2017 BRS ARCHITECTS ALL RIGHTS RESERVED. REPRODUCTION OR TRANSLATION OF ANY PART OF THIS WORK WITHOUT WRITTEN PERMISSION OF BRS ARCHITECTS IS UNLAWFUL AND SUBJECT TO CRIMINAL PROSECUTION. LICENSED ARCHITECT AR -2782 7-24- 7 , RENT K CI STATE OF IDAHO O 00 F X000 QZ 0 M M J QOOM L Q�OOMO 'M Lu Lu rsj CD F_ (j) c) Z m (=) < VJ U W T� i U O UI� zz z Oa I—I � Lu W0 Q 0� �z H 0 0 I --I Lu 0� LL L.ri O ILLz z4t Lu Ow d /1/ Lu �O Lu Lu Q Lu Lu Um z w a 0 < Lu N d M DRAWN CMH DATE 7/24/17 CHECKED JOB NO. 17077 SHEET AS102 ■111111 O 00 F X000 QZ 0 M M J QOOM L Q�OOMO 'M Lu Lu rsj CD F_ (j) c) Z m (=) < VJ U W T� i U O UI� zz z Oa I—I � Lu W0 Q 0� �z H 0 0 I --I Lu 0� LL L.ri O ILLz z4t Lu Ow d /1/ Lu �O Lu Lu Q Lu Lu Um z w a 0 < Lu N d M DRAWN CMH DATE 7/24/17 CHECKED JOB NO. 17077 SHEET AS102