Loading...
Application MaterialsHearing Date: August 15, 2017 File No.: H-2017-0101 Project Name: Geddes Subdivision Request: Request for final plat consisting of 10 building lots and 4 common lots on 2.08 acres of land in the R-8 zoning district, by Schultz Development. Location: The site is located southeast of the W. Ustick Road and N. Black Cat Road intersection, in the NW ¼ of Section 3, Township 3N., Range 1W. (:�ENDIAN;:--- IFCFIVI JUL 1 1 2017 dX: STAFF USE ONLY: Project name: File number(s): 0101 Assigned Planner: Related files: Type of Review Requested (check all that apply) Planning Division REVIEW APPLICATION ❑ Accessory Use ❑ Planned Unit Development ❑ Administrative Design Review ❑ Preliminary Plat ❑ Alternative Compliance ❑ Private Street ❑ Annexation and Zoning ❑ Property Boundary Adjustment ❑ Certificate of Zoning Compliance ❑ Rezone ❑ City Council Review ❑ Short Plat ❑ Comprehensive Plan Map Amendment ❑ Time Extension: ❑ Comprehensive Plan Text Amendment Director/ Commission/Council (circle one) ❑ Conditional Use Permit ❑ UDC Text Amendment ❑ Conditional Use Modification ❑ Vacation: Director/Commission (circle one) Director/ Council (circle one) ❑ Development Agreement Modification ❑ Variance Final Plat ❑ Other ❑ Final Plat Modification Information Applicant name: ��1�1� "�-` �/ -� l�D U�� Phone: 56c-)`— L 5 Applicant address: P O �6� ` i i 5 Email: C-- ��w- City: f I G.y�- State:=j '�V'� (ll �� Zip: Applicant's inter n property: ❑ Own ❑ Rent ❑ Optioned n8ther Owner name: `9-e—C4--� q � 1. ^_P Phone: 1 ' 3667 V - C'V 1 —,. Email: Owner address: '�i`a�,� .� City: e b ck�tcL^ State: Zip: Agent/Contact name (e.g., archiect, e. (; c\r - Firm name: developer, representative): Phone: Agent address:PU `��— �� Email: City: �a-q-LCLLC, — 1 State: _�_ Zip: Primary contact is: KApplicant ❑ Owner (Agent/Contact Subject Property Information Location/street Assessor's parcel number(s) Township, range, section: 1Lo !>-2 Total acreage: 2 c 06 Zoning district: Community Development ■ Planning Division ■ 33 E. Broadway Avenue, Ste. 102 Meridian, Idaho 83642 Phone: 208-884-5533 Fax: 208-888-6854 www.meridiancity.org/planniU M (Rei,. 0611212014) Project/subdivision name: Ge -Ale -5 &"ckty l s t v. General description of proposed project/request: c-6 \c, , J� l o-„- Z -� �cd-� i r, , Proposed zoning district(s): R9F Acres of each zone proposed: `4' ` C*3 Type of use proposed (check all that apply): esidential ❑ Office ❑ Commercial ❑ Employment ❑ Industrial ❑ Other 1 Who will own & maintain the pressurized irrigation system in this development? Vv Which irrigation district does this ((property lie within? U M' t D Primary irrigation source: V" N�, i V Secondary: �• Square footage of landscaped areas to be irrigated (if primary or secondary point of connection is City water): 51F (QI oz� Residential Project Summary (if applicable) Number of residential units: b Number of building lots: Ly Number of common lots: Number of other lots: Proposed number of dwelling units (for multi -family developments only): 1 bedroom: 2-3 bedrooms: f1_0L_ 4 or more bedrooms: Minimum square footage of structure (excl. garage): , Maximum building height: 7 5 Minimum property size (s.f): 4, Average property size (s.f): 4, 5–,6 us Gross density (Per UDC 11-1A-1): �.�1 � Net density (Per UDC 11-1A-1): g,& Q''`� Acreage of qualified open space Percentageof qualified open space: Type and calculations of qualified open space provided in acres (Per UDC 11 -3G -3B): NCL. Amenities provided with this development (if applicable): 50Q.J–QQ– Type of dwelling(s) proposed: gle-family Detached ❑ Single-family Attached ❑ Townhouse ❑ Duplex ❑ Multi -family ❑ Vertically Integrated ❑ Other Non-residential Project Summary (if applicable) — V\4-;L– Number of building lots: Gross floor area proposed: Hours of operation (days and hours): Total number of parking spaces provided: Authorization Print applicant name Applicant signature: Common lots: Other lots: Existing (if applicable): Building height: Number of compact spaces provided: Date: ro , C-7 Community Development ■ Plamiing Division ■ 33 E. Broadway Avenue, Ste. 102 Meridian, Idaho 83642 Phone: 208-884-5533 Fax: 208-888-6854 www.meridiancity.org//planning -2- (Rev. 06/12/2014) July 6, 2017 Mayor Tammy DeWeerd and City Council City of Meridian 33 E. Broadway Street Meridian, ID 83642 RE: Geddes Subdivision Final Plat Submittal H-2017-0041 Dear Honorable Mayor and City Council Members, On behalf of Schultz Development LLC, this letter is to accompany the Final Plat submittal for Geddes Subdivision. The Annexation, Rezone, and Preliminary Plat applications (H-2017-0041) for the 2.08 acre site were approved on June 20, 2017 by the City Council. The signed Development Agreement is attached. The submitted final plat consists of 10 building lots and 4 common lots. The final plat conforms to all of the requirements and conditions of the approved Preliminary Plat. The submitted final plat, development plans, and landscape plans conform to the UDC and all applicable engineering, architectural, and surveying practices and local standards. Sincerely, Matt Schultz Schultz Development LLC Project Manager Attachments April 5, 2017 DESCRIPTION FOR R-8 ZONE GEDDES SUBDIVISION A parcel of land located in the NW 1/4 of the NW 1/4 of Section 3, Township 3 North, Range 1 West, B.M., Meridian, Ada County, Idaho being more particularly described as follows: Commencing at the NW corner of said Section 3 from which the W1/4 corner of said Section 3 bears South 00°37'58" West, 2697.53 feet; Thence along the West boundary line of said Section 3 South 00037'58" West, 443.88 feet; Thence leaving said West boundary line South 89°23'11" East, 414.76 feet to the REAL POINT OF BEGINNING; Thence continuing South 89°23'11" East, 260.26 feet to a point on the southwesterly boundary line of Klamath Basin Subdivision as filed in Book 96 of Plats at Pages 11914 and 11915, records of Ada County, Idaho; Thence along said southwesterly boundary line the following 2 courses and distances: Thence South 52°36'15" East, 106.58 feet; Thence South 60006'23" East, 22.04 feet to the SW corner of Staten Park Subdivision as filed in Book 86 of Plats at Pages 9713 and 9714, records of Ada County, Idaho; Thence along the southwesterly boundary line of said Staten Park Subdivision the following 3 courses and distances: Thence South 60007'02" East, 48.03 feet; Thence South 64000'36" East, 202.17 feet; Thence South 54°36'16" East, 44.31 feet to an angle point in the exterior boundary line of The Lake At Cherry Lane No. 9 Subdivision as filed in Book 81 of Plats at Pages 8885 and 8886, records of Ada County, Idaho; Thence along the North boundary line of said The Lake At Cherry Lane No. 9 Subdivision and the North boundary line of Ashford Greens Subdivision as filed in Book 73 of Plats at Pages 7567 through 7568, records of Ada County, Idaho North 89°23'11" West, 625.89 feet; Thence leaving said North boundary line North 00038'20" East, 210.00 feet to the REAL POINT OF BEGINNING. Contains an area of 2.08 acres, more or less. �® E 10 Ir W AFTER RECORDING MAIL TO: Robert C. Campbell 3313 W. Cherry Ln #144 Meridian , ID 83642 File No.: 4102-2664222 (PC) Date: May 27, 20:6 For Value Received, Michael G. Sorensen and Karen L. Sorensen, husband and wife, hereinafter referred to as Grantor, does hereby grant, bargain, sell and convey unto Robert C. Campbell, an unmarried man, hereinafter referred to as Grantee, whose current address is 3313 W. Cherry Ln #144, Meridian , ID 83642, the following described premises, situated in Ada County, Idaho, to wit: LEGAL DESCRIPTION: Real property in the County of Ada, State of Idaho, described as follows: A parcel of land in Ada County, Idaho, more particularly described as follows: Beginning at a half inch iron pin that bears South 0114'00" West 443.73 feet from the Northwest corner of Section 3, Township 3 North, Range 1 West, Boise Meridian, said pin being on the Section line; thence South 8904731" East 414.86 feet to the REAL POINT OF BEGINNING; thence South 8904731" East 256.11 feet; thence South 5502321" East 155.00 feet; thence South 64024'03" East 205.31 feet; thence South 56002'21" East 61.89 feet; thence North 89047'31" West 621.03 feet; thence North 0014'00" East 210.00 feet to the REAL POINT OF BEGINNING. AND EXCEPT any portion thereof lying within right of way of the 8 Mile Lateral. AND EXCEPT road rights of way. APN:S1203223480 TO HAVE AND TO HOLD the said premises, with their appurtenances, unto said Grantee, and to the Grantee's heirs and assigns forever. And the said Grantor does hereby covenant to and with the said Grantee, that the Grantor is the owner in fee simple of said premises; that said premises are free from all encumbrances except current years taxes, levies, and assessments, and except U.S. Patent reservations, restrictions, easements of record and easements visible upon the premises, and that Grantor will warrant and defend the same from all claims whatsoever. Page 1 of 2 APN: S1203223450 Warranty Deed File No.: 4102-2664222 (PC) -continued Date: 05/27/2016 Mich el G. Sorensen STATE OF Idaho ) ss. COUNTY OF Ada Karen L. Sorensen s' / da of May, 201 before me a Nota Public in and for said State personally appeared On thi ` Y V, Notary , P Y Pp Michael G. Sorensen and Karen L. Sorensen, known or identified to me to be the person(s) whose name(s) i are ubscribed to the within instrument, and acknowledged to me that he/she/ey e- ecuted the same. In witness whereof, I have hereunto set my hand and_ affixed my official seal the day and year in this certificate first above written. br0ffi6ei u n e a ,Det ®®•• q ®®®®°°° °°®®U�,�°®® Notary Pu is for the State of Idaho ° �OTARk ® Residing a . Boise, ID ® � My Commission Expires: J ®a®� OF 1960%, �0aseeieaem�° Page 2 of 2 AFFIDAVIT OF LEGAL INTEREST STATE OF IDAHO ) COUNTY OF ADA ) ess) V� (city) y` f (state) being first duly sworn upon, oath, depose and say: That I am the record owner of the property described on the attached, and I grant' my permission to: Mnf2t R/,4 /0 (name) (address) 3& to submit the accompanying application(s) pertaining to that property. 2. I agree to indemnify, defend and hold the City of Meridian and its employees harmless from any claim or liability resulting from any dispute as to the statements contained herein or as to the ownership of the property which is the subject of the application. 3. I hereby grant permission to City of Meridian staff to enter the subject property for the purpose of site inspections related to processing said application(s). Dated this L Z n day of �'�v+1� 20 SUBSCRIBED AND SWORN to before m MARTIN D' NOTARY PUBLIC IDAHOTATE OF TyJ e _ /] Y Residingat: My Commission Expires: lsr a a 33 E Broadway Suite 210 • Meridian, Idaho 83642 Phone: (208) 884-5533 • Facsimile: (208) 888-6678 9 Website: www.ineridiancity.org J 0 V � CL m. mz Gj Q w E IDIAN Meridian City Hall, Suite 102 33 E. Broadway Avenue IDAHO Meridian, Idaho 83642 Community Development 208.887.2211 Deportment Parcel Verification Date: 2/27/17 The parcel information below has been researched and verified as correct by the City of Meridian Community Development Department. Project Name: Geddes Subdivision Parcel Number: 51203223480 Acres: T/R/S: Property Owner qV 3N 1W 03 Robert C. Campbell 3313 W. Cherry Ln. #144 Meridian, ID 83642 Address Verification Rev: 04/23/12 �I � o T. TZ 10 Soo Lo, -LILAU is if Te i �"/�/�� �°1y-�o r�2 S� IIS ��dx�� gtoy3y=:_�S �'ga=$ •� �k £ �3 / # -L��I Ik a = 31 � a, � omnia v ss� -- - - _ ,ao�o� K egae —i Ho.: JJJ 0 e 3 _ I G'-' — acv (pjam�- o e i fill- j t ^-1 i3zf LJ 'gF opq I_•-.�� 3 Z XJOIB _ t , . r PON;� _�� �Y Q311ViRtl1/ n Him g ig --=�-------------- �-way A-----------a'----� ol�l++�,�� €¢$� � ON9f/3B i0 56Y8 &�o7F o� ON 1V0 M]Vp 'N $aS=g�s< X� ADA COUNTY STREET NAME REVIEW Preliminary Plat Review Date: March 29, 2017 Final Plat RX Project Name: GEDDES SUB T/R/S 3N 1W 03 Parcel Number(s): S1203223480 Project/Plat Applicant: SCHULTZ DEVELOPMENT Phone No: 208-880-1695 City/County Agency: ADA COUNTY -MAOI THE FOLLOWING EXISTING STREET NAMES SHALL APPEAR ON PLAT N BLACK CAT RD N GEDDES PL W USTICK RD Y Y > 0 Ln LO N U U) Q -E O Proposed Street Names: U a o in m Comments 1 N GEDDES PL X E Post type should be "Ave" 2 W SHIRDALE CT X 3 W SHIRDALE ST X 4 5 6 7 8 PLEASE MAKE THE FOLLOWING CHANGES OR CORRECTIONS Please replace existing street N GEDDES PL with N GEDDES AVE - COUNTY WILL FIX Please replace N GEDDES PL with N GEDDES AVE NOTE: If there are corrections and changes recommended, please make these changes on the subdivision plat and resubmit to the Ada County Assessor. A final review with no changes required and the matching plat must be presented to the Ada County Surveyor at time of recording. Codes/criteria regarding denial A Sounds like an existing street B Alignment with existing street C Duplicate street name within Ada County D Street name exceeds 13 letters E Other The overall final street names are subject to change at Final Plat phase levels due to design changes, time constraints and or previous recorded plat street alignments. Page 1 of 1 m Q J as i O" CIO :3 / L'Al I I L - - - - - w � M � - I I I I _ J , 1 / 1 ,l8 I� Y'6 O m I I , I I 1 I ,o -oz I— Q O I oloo Nlro •t. Q I N w 100 00 I3 L--------�I — � W zs ,98 3 I C-4 vi z WI v S: VII I0o0 - W z 1 I m � a I I Z 1 �m N a z 1 h O ,p a N 0 I O I U) .00.02 3„OZ,8£.M I �Ia 03LLVldNf1/ I I L - - - - - w � M � - I I I I _ J , 1 / 1 ,l8 m I I , I I 1 ,o -oz I— Q O I oloo Nlro Q 100 I3 L--------�I — 1= ,98 vi I I I L - - - - - w � M � - I I I I _ J , 1 ,l8 I I , I I ,o -oz I— I O I oloo Nlro 100 I3 L--------�I — 1= ,98 I0o0 - W z Z to W a I Z I O U) S I ,IB 1 m I N Z W 0 NI 0 n m J � Im Q 1 O 1 = l9 a C: 0 V/ C 16 y >92am 0 a a. c I H 1� Z NOOlB09 O N <I 31 O rnl Q I U zl Y N�7-'--- M„ --- --- --- J o fS'L69Z 9S,L£.OS CO � z :ONI8V38 30 SISHB 1 0 t7 O N M II \ =.6fd- N U w II > Naf10 'ld S30030 K Breckon Land Design Inc. Post Office Box 44465 Boise, Idaho 83711 - - i p: 208-376-5153 f: 208-376-6528 www.breckonlanddesign.com Landscape Architecture • Civil Engineering • Graphic Communication • Erosion Control • Irrigation Design • Land Planning June 5, 2017 City of Meridian, Community Development Department 33 E. Broadway Ave. Meridian, ID 83642 Project: Geddes Subdivision N. Black Cat Rd. Meridian, ID 83646 Re: Engineers statement of certification All street finish centerline elevations are set a minimum of three feet above the highest established normal groundwater elevation, per the attached geotechnical investigation performed by Site Consulting on June 7, 2017. If you require any additional information or supporting documentation, please let me know. Sincerely, Breckon Land Design, Inc. , G%Sl £N\ ��srfRFD�y��� ��TTF OF �TNEW S Matthew S. Derr, PE Cc: File Digitally signed by Matthew S. Derr, PE Reason: Document Signature Date: 2017.06.12 10:40:06 -06'00' CONSULTING, LLJ Mr. Matt Schultz June 7, 2017 Schultz Development Page 1 of 2 Post Office Box 1115 File # 17118-B Meridian, Idaho 83680 Re: Geotechnical Report Addendum #1 Geddes Property East of 3050 North Blackcat Road Meridian, Idaho Matt: As per you request, SITE has measured the groundwater elevation monthly in the three wells we installed in March 2017 on the referenced property. We will continue with month measurements through the end of this irrigation season. Groundwater elevations to date are listed in the table below. Location TP -1 TP -2 TP -3 Casing Height 3.44 3.58 3.79 Hub Elevation 2549.18 2550.28 2550.24 Casing Elevation 2552.62 2553.86 2554.03 311712017 Date Excavated 10.50 2542.12 11.00 2542.86 10.50 2543.53 4/28/2017 Water Elevation 12.15 2540.47 12.44 2541.42 12.51 2541.52 5/30/2017 Water Elevation 10.70 2541.92 10.52 2543.34 10.66 2543.37 Water Elevation Water Elevation Highest Measured Groundwater 2542.12 2543.34 2543.53 We appreciate this opportunity to be of service. Please contact our office if additional information or services are Respectfully subm Bob J. Arnold, PE SITE Consulting, L uired. 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 Z -ITE t,NSUJL T ING; L a C AerW Photo Monitoring WO Location -. Lj .ter r Google Earth nothing follows d) a 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 6/28/2017 Print W indow ® X A- Subject: RE: Geddes "trees" From: ehuff@meridiancity.org To: schultzdevelopment@yahoo.com Date: Wednesday, June 28, 2017,7:08:20 AM MDT You are good to go. No mitigation. Thanks, Elroy From: Matthew Schultz Sent: Wednesday, June 28, 2017 12:02 AM To: Elroy Huff Subject: Geddes "trees" took this pic a few weeks ago Matt Schultz (208) 880-1695 City of Meridian 33 E. Broadway Ave., Meridian, Idaho 83642 Phone: 208-888-4433 www.meddiancity.org All e-mail messages sent to or received by City of Meridian e-mail accounts are subject to the Idaho law, in regards to both release and retention, and may be released upon request, unless exempt from disclosure by law. o w N i¢ o o _� a2i>z a N a .tM o oom i �aoF w wo v}� ♦� w o�d� zoaz �i '� z gars >ii ♦ 1 / r .0 z y��ao z y V 3a z / ml ' 3^ami � -Fo rc a b oa N ui omo o'"r5m boa,=o�o�� i $ w a� ♦ '�i / \ g�a m� =rc�o aWh po F TR W. -'ate mo rc rV4N�W j _� pF2 p lyJ. x0� o�R_62w ✓Y.i 6ZN K oUa 2 Z�? z�laiiK p i 6 ¢ LLz a U Q ¢Oa¢dZa Z-�bII55m W6 w rc a ZdZ� ooi TO �w �am aUU OQo ¢QNy2 TF W`= F aQo Z6 % /1 1 O II Z LL ON O Vi�WZv� �o: tones€w yd Zg� / 1 .�(_. �-- 0 0 LL ,^ zy wrm0 �i¢ Zfi •m0 �^ W x Z66 F / m�N"' r_€fix¢Uu' K.- OF / ) ' L W 0] m Mvpmi �awin awm¢ r#moi.pw _ m m¢w w3 wz mop zu�s Vm� m5 o' o ma z& a'2 Nz b I N aoF 6w apo d`N� w N xz m bp�?0"5 omo8F co zF� zd QOa imp S�wa g3 vZi€ Maj ��pAI/ •4/ I o dQ w�W ZZF(p 4€4,, Y¢ w_ p. mg "Z N r7/ Oa w wT(_ wdKZ�vOWi 00 �o --a{{, aP Jo ZO� / N Im .- O MV Ra2ra'zz ¢m20i-�� OS a =Q mZ ¢ Rm / h (N n3Z 8i¢G -Z Z, �2 a4z1z om p0 ¢ Fi1�0 WW Z1- ao,u Nes-xo �of4 voii �w 56 p zzo? z'� / I O �S �1J1 h o wore xoi aKa< Ln I �5 mz asm �x / � O 15 O �y 0mo fi,.OF Ixo�� z im ¢w2gxno<s <F 3'n o€ GJ�,EyOR m o,�y�r N n a m n m P in p •T z � yO d6 0 0 3 O 3 ♦ ��-�— S'(p'G OG O N 0 ^O Oo p .0"Z l -;---1 w Hd W 'i ^ n 1 U•�________________� I< Itl ZN A^^. HOZ .S6'4L W m rQ� O W O Z a 2 0 Z f \ 0] O f hAbry € < I m n = U�N ♦ h N nj ' pl' b Z ¢ > / a rc w ^ IN z U U a Z Z m O YN y0♦ w _______,6S't8 ___� o: W. _____-M.64,9.0 yi ______ i vN ¢ 3= z M OO r zz o �r oiz ` o w Od/y0 :OU b N ory ' I O Q i h^ '-------------------'' 1 z ate. rV�) 6 \ZQ ,9L'S8 1 O Q ry aJ v�qM.64,9f.0S- Iil G� G—w r- o aol N° j I n b m .e090 Z I� `-------- , I 1'I m ; I (7 I I I --te -- - � ' R55-0'--e� ,84'l9 i C) 1 I ¢ NO 1 I , I s___ i 3- Io t� eS'fl S"fZ gl 1 i n F m z I i Z' NI t____________________! �! ______� I O i O e < ,9YtB _ ZS'lB _ M.fi4,9f. -- os Z 3I M,64,9£OS _� —i.Dztr— _ aI 0 0 z zI ' �i I ------------------- L----------},64'ZL M.Lt,9f.OS ' I �_____ M.64,9C.OS-___ oln 1 f toL ,l0'SOt M.Zt,B£.OS la r'+ In 1 n f0 3ntl 53003) N m'3Ad 530030 A ,q l0 1 ¢ 3 3 3 f 3 o w g N po 3 1 ,O'Ol ' I� 6 ,ff'09 M.L I,Bf.OS -N) 3 i � p 'a ��. _ Z NOOlB m o n ' N fr ZS'l8 m Y m lJi m z z m m .94_19 O z __—__ O Q z z U ' m n b m g •n- ,BB'f4/\ M W v n '00.01Z9TA.-9 __ ,99C40Z f m M e,. .f5'169Z M.BS,Lf.OS _ _ _ _ _ ., _ _ _ _ ONRM38 -40 SIStlB ` '021 1tl0 NOVIIS 'N Z � ^ Z -r D] N z o O •- 3 O ^ N � U YS �j Ci U N ry W O O�� O p � 018 <mz� c O Z N q R" NEa N N c p L Q as m I o oa O - a s c= m a m d W d o U) Z m r \ �J��OOR d6 m a p O O O% �ybp "` EE o M M 0 o jP U y N A Q m 310 �o N c ,o E v c a pOy7 U O n 41 y `O C L Tm 0 aQYi La s m y L o ¢ a E - n c U L m Q Q Iwo d Oi El G T U Z. O m N m E E j 1li _ rn U O $ rs q a 976 z° _ _ U _ .o q zo a5 32 o na 9 $ac y3oc�ro W � m w w Y m x rs U o w m _ 0 0 $ 3 a O m c m L U Z 'o § O o o 0a _� c a Z O as ¢ mro 'o - m � `o cm ¢ `o 00. �$ °� m a_ ro ofm 8 oc � c a ° v G � ..ommN o N N m Z, � wo N m A N cn o L �y0 _ .Oo �O me n m w m m £ v 'S w¢ N vY _ 00 ro G t v o m mo o mhm oc a@L Ea 65 8 E d o wUy c1g w moa�c c m + oa N o p mm m mm m mid m m 9 E o 3_ E z.P m m y £ o mm m �a o m E � yumv> U O N fn O1.6 2 N H 0 0 m a .°oo v a o N m w 5$ L v a m Us t'_m w w w w w`d do o io ioa N 3 o o 0 io o o io m y 0c zo m vm '.2 ;9 mL- W c mm 0 0 m mm y_ c a _ M o uNi �-% m m m � m8 u�im zy m� w` rnH ?o¢gkN m3v,o�8 O — m O Y U O W m O o ..oc��vo�m0o39 O m p F N f) N N N G m G m m O m E£ d -F G 3 - fy c E $ a E a m m m m aci m m m m N �- . - N ,d +- o loci (/1 N K O 0f�ry 3m��m w U •-amg wFa„� N _ o o U r o ao m 1 oam I O i a E=a m co 0 Z) O a o = v m 0 L R U i` . o -_ 0 > SA W a m 2 wa r 0 N p N- v m W m 'a U« Fc ` 8A p W o m Ex P rn m m 2 AGn voi p; m JAgOOR dd 1� Mi a) �dp�d6 tt�V vl �Oad o m (w wmga ° nom° d m W maoNs$�a' �O42 w c u m 'o n m3 m �n o m w ° v s d mm-=oaE�° = n�v�nmoa E T 00 0 o tO�E$'m w� m 'c m U pcr'=' H m o L` 'Dal ama �m m 2�m N a« m U o N e£10 - n w` ' b � D ° m m G m U m N« r C 7 �oam�m`mmm m oma o m m o m y a m rn �c'N n a m c rn A cc - �cma me rna N N Z'B!E y m p"° c E $ '.Q m L« $ $ '° to() O n N N FINAL HYDROLOGY REPORT for GEDDES SUBDIVISION Address: N Black Cat Road Meridian, Idaho Breckon Land Design, Inc. 6661 N Glenwood Street Garden City, Idaho 83714 p: (208) 376-5153 f: (208) 376-6528 4 "F OF THEW S . Project No. 17034 June 12, 2017 Digitally signed by Matthew S. Derr, PE Reason: Document Signature Date:2017.06.12 10:34:14 -06'00' Landscape Architecture • Land Planning • Storm Water Management • Erosion Control • Graphic Communication 9 Water Management • Irrigation Design PURPOSE The purpose of this report is to confirm that the on-site storm water management system design for the Geddes Subdivision is adequate for the specified design storms per the City of Meridian, Ada County Highway District (ACRD) and Idaho Department of Environmental Quality standards. SITE DESCRIPTION The subject property is located at N Black Cat Road, lying in Section 3 Township 3 North Range 1 West, Boise Meridian, City of Meridian, Ada County, Idaho. The limits of construction are approximately 2.1 acres, as shown on the attached drainage basin map and the construction documents. See Appendix A for the post development drainage basin map and a copy of the stormwater construction plans. Currently, the site is gently sloping and runoff from the study area collects drainage is conveyed to the southwest at an average slope of 0.4% and is ultimately intercepted by the existing N. Geddes Place that meets the site in the southwest corner. The northeast portion of the site contains the Eight Mile lateral. Proposed improvements consist of residential buildings, associated structures, utility and roadway improvements servicing the subdivision. Stormwater draining to the right-of-way in will be captured by proposed improvements, as described in the post development analysis. All stormwater within the limits of construction will be contained on site to the extent possible with the addition of the proposed improvements and on -lot retention of water completed during the building construction. Soil properties and infiltration rates were obtained from the Geotechnical Recommendation Report for Geddes Property, by Site Consulting, dated March, 2017 and Appendix #1, dated June, 2017. See Appendix D for a copy of the report. DESIGN CRITERIA ACHD Criteria The system is designed to accommodate the peak flow for the 25 -year and 100 -year design storm in accordance with the latest edition of the Ada County Highway District Policy Manual Sections 8000 and 8200. The portions of the project area draining to the right-of-way utilize the latest edition of spreadsheets provided by ACRD, equations derived from the spreadsheet and/or the Policy Manual. The storm water peak runoff flows are calculated using the Rational Method with a weighted post development runoff coefficient calculated for each drainage area and duration equal to the calculated time of concentration. The rainfall intensity used was taken from the Boise Area Intensity -Duration -Frequency, with Revised OF Curves for ACHD as published in Section 8202.1 in the latest edition of the Ada County Highway District Policy Manual Stormwater Management Design Manual. See Appendix B for a copy of this curve. The design storm peak volumes are calculated using the Modified Rational Method for a 100 -year, 1 -hour storm duration. The required pre-treatment volume (defined as the 95th percentile, 24 -hr storm (0.60" in Section 8007.2) is calculated as 0.60 inches over the basin area. This is effectively calculated equivalent to 63% of the design storm peak volume. The ACRD methodology for pre-treatment volume appears to be conservative by a factor of at least 4 due to varying methods of calculation (NRCS vs Modified Rational) and storm duration (24- hour vs 1 -hour) used. The conservative value derived from the ACHD spreadsheet methodology will be used. PEAK FLOW ANALYSIS OUTLINE The proposed storm drainage conveyance facilities are sized to provide the necessary capacity to convey the design storm, as required. The following steps were taken to design the storm conveyance facilities. 1. Calculate the individual drainage basin areas (A), the Runoff Coefficient (C) and Time of Concentration (Tc) values for the developed basins. Combine basins, as appropriate, to determine flow at specific Design Points. 2. Determine the peak flow for each basin and Design Point using the Rational Equation (Q=CIA), utilizing the Rainfall Intensity (1) from the appropriate Intensity -Duration -Frequency curves based on the Tc value. 3. Verify capacity of the inlets, storm drain lines, sand and grease traps and other storm water conveyance facilities to accommodate the peak flows. PEAK FLOW ANALYSIS RESULTS The proposed storm drainage conveyance system has been sized to accommodate the 100 -year peak flow rates. All facilities have been verified to adequately pass the peak flow and convey the stormwater to a facility for disposal by infiltration. See Appendix C for detailed calculations. DESIGN STORM RETENTION VOLUME ANALYSIS OUTLINE The proposed storm drainage retention facilities are sized to provide the necessary capacity to store the 100 - year storm event, to provide for initial settlement of sediments in the runoff and dispose by infiltration within the required time frame. The following steps were taken to design the storm drain facility. 1. Calculate the individual drainage basin areas (A) and estimate the Runoff Coefficient (C) for the developed basins. Combine basins, as appropriate, to determine volume at specific Design Points. 2. Determine the Rainfall Intensity (1) from the appropriate Intensity -Duration -Frequency curves based on the design storm event and storm duration (T) of one hour. 3. Size the drainage swale per the Modified Rational Method to accommodate the required volume using the following equation V= C*I*T*A, providing for freeboard and sedimentation. 4. Verify capacity of facilities for design volume and maximum drain time. 100 YEAR RETENTION RESULTS The proposed drainage facilities have been designed to adequately retain and dispose of the 100 -year design storm event. See Appendix C for detailed calculations. PRE- DEVELOPMENT DRAINAGE BASIN AND DESIGN POINT ANALYSIS A Pre -development analysis was not performed to demonstrate pre -development site conditions, as all drainage is proposed to be detained on-site to the extent possible. As the design intent is to retain the stormwater discharge from the project on-site, the off-site discharge will be reduced significantly with the proposed improvements. 2 POST DEVELOPMENT DRAINAGE BASIN AND DESIGN POINT ANALYSIS For the Post -development analysis, the drainage patterns for the proposed site have been divided into five (5) basin areas and five (5) design points as shown in Appendix A. The selected runoff coefficients are a composite of impervious surfaces (C=0.95) and single family residential lots (C=0.40). Each basin denotes an area of the project that drains to a specific point defined by a design point. Additional design points are utilized to study downstream conditions including junctions, drainage basins and outfalls. See Appendix C for detailed calculations. Design Point 1 is the point of discharge for Basin A, and, covers approximately 0. 19 acres consisting of mostly impervious surfaces and lot drainage. Stormwater runoff from Basin A includes sheet flow and gutter flow draining to a proposed sump inlet. The flow is intercepted by the inlet and directed to the proposed infiltration basin by the proposed storm sewer. Design flows are routed to Design Point 3. Design Point 2 is the point of discharge for Basin B, and, covers approximately 0.32 acres consisting of mostly impervious surfaces and lot drainage. Stormwater runoff from Basin B includes sheet flow and gutter flow draining to a proposed sump inlet. The flow is intercepted by the inlet and directed to the proposed infiltration basin by the proposed storm sewer. Design flows are routed to Design Point 3. Design Point 3 is the point of discharge for Design Points 1 & 2, and, covers approximately 0.51 acres consisting of mostly impervious surfaces and lot drainage. Stormwater runoff from Design Points 1 & 2 includes sheet flow and gutter flow directed to the proposed infiltration basin by the proposed storm sewer. Design flows are routed to and disposed in the proposed infiltration basin. See Appendix C for sizing calculations. Design Point 4 is the point of discharge for Basins C & D, and, covers approximately 0.36 acres consisting of mostly impervious surfaces and lot drainage. Stormwater runoff from Basins C & D includes sheet flow and gutter flow draining to a proposed sump inlet. The flow is intercepted by the inlet and directed to the proposed infiltration basin by the proposed storm sewer. Design flows are routed to Design Point 5. Design Point 5 is the point of discharge for Design Point 4 & Basin E, and, covers approximately 0.68 acres consisting of mostly impervious surfaces and lot drainage. Stormwater runoff from Design Point 4 & Basin E includes sheet flow and gutter flow directed to the proposed infiltration basin by the proposed storm sewer. Design flows are routed to and disposed in the proposed infiltration basin. See Appendix C for sizing calculations. Appendix A Drainage Basin Map Storm Sewer Improvement Plans O'KQ juawdoIanaa-Isod s�W ESLg•8XE• ;: Iigiux3 abauleJ(l uoisinipgnS sappa!D =j'NV�d �3SMdS W! i3 SNV1d 1NSWAAOHdW1 H" al 'NVICIIH3V NOISIAIaBnS Sat s, I I 3�Md S30Q3: I I I LL— W G 3, o H W =§� W HI Z I Fp 2 o IfI, 1 / / 3 I �3 I i3 f I I I I - / I , F II( I I 3�Md S30Q3: I I I LL— W G 3, o H W =§� W HI Z I Fp 2 o IfI, Appendix B Intensity -Duration -Frequency Curve BOISE AREA INTENSITY -DURATION -FREQUENCY, WITH REVISED IDF CURVES Intensity (inches per hour) Boise Area Intensity Duration Frequency (IDF) 3.00 ------ 2 year 2.50 -*- 5 year -x- 10 year E2.00 -ti- 25 year c1.50 X�\ --0- 50 year y� X -{ -- 100 year y1.00 �*\ w \x\ C .- --- x0.50 ---. ;;\ 0.00 10 min 15 min 30 min 1 hour 2 hours 3 hours 6 hours 12 hours 24 hours Duration in minutes and hours ACHD_SD_CALCS_4-21-16 10/11/2016, 8:18 AM Version 8.7, April 2016 With New IDF Curves Design Storm 2 5 10 25 50 100 Tc 0.17 10 min 0.69 1.15 1.45 1.85 2.20 2.58 0.25 15 min 0.59 0.97 1.22 1.56 1.86 2.18 0.33 20 min 0.49 0.81 1.01 1.30 1.54 1.81 0.42 25 min 0.43 0.71 0.89 1.14 1.35 1.58 0.50 30 min 0.41 0.67 0.85 1.08 1.29 1.51 0.58 35 min 0.34 0.56 0.70 0.90 1.07 1.25 0.67 40 min 0.31 0.51 0.64 0.82 0.98 1 1.15 0.75 45 min 0.29 0.48 0.60 0.77 0.91 1.07 0.83 50 min 0.27 0.45 0.56 0.72 0.85 1.00 0.92 55 min 0.26 0.43 0.54 0.69 0.82 0.96 1.00 1 hour 0.26 0.43 0.54 0.69 0.82 0.96 2.00 2 hours 0.16 0.25 0.31 0.39 0.46 1 0.54 3.00 3 hours 0.13 0.19 0.23 0.29 0.34 0.40 6.00 6 hours 0.09 0.12 0.14 0.18 0.21 0.25 12.00 12 hours 0.06 0.08 0.10 0.12 0.14 0.16 24.00 24 hours 0.04 1 0.06 1 0.06 0.08 0.09 0.10 Boise Area Intensity Duration Frequency (IDF) 3.00 ------ 2 year 2.50 -*- 5 year -x- 10 year E2.00 -ti- 25 year c1.50 X�\ --0- 50 year y� X -{ -- 100 year y1.00 �*\ w \x\ C .- --- x0.50 ---. ;;\ 0.00 10 min 15 min 30 min 1 hour 2 hours 3 hours 6 hours 12 hours 24 hours Duration in minutes and hours ACHD_SD_CALCS_4-21-16 10/11/2016, 8:18 AM Version 8.7, April 2016 With New IDF Curves Appendix C Storm Water Calculations ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin A, Design Point 1 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 25 4 Enter number of storage facilities (25 max) 7 Click to Show More Subbasins 0 5 Area of Drainage Subbasin (SF or Acres) Acres Acre! 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn))/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User calculate min to c int J Subbasin 1.85 Subbasin Subbasin Subbasin cis Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 0.10 0.09 Heavv areas 090 0.19 0.95 0.40 0.69 8 Determine the average rainfall intensity (i) from IDF Curve based on 9 Calculate the Post -Development peak discharge (QPeak) 10 Calculate total runoff vol (V) (for sizing primary storage) V = Ci(Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 13 Volume Summary Surface Storage: Basin Basin Forebay Primary Treatment/Storage Basin Subsurface Storage Volume With 15` o Sediment Factor 1 1.85 in/ Qp..k 0.24 cis Urban neighborhoods 0.50-_0.70 Residential V 325 ft Multi -family ------ ---- .0.600.75 ------------------------- 95th 0.60 in Vrr 283 ft' Light areas cfs Type of Surface Runoff Coefficients "t Business Downtown areas 0,70-0.95 Urban neighborhoods 0.50-_0.70 Residential Brick Single Family 0.35.0.50 Multi -family ------ ---- .0.600.75 ------------------------- Resldential (rural)_ ____ ............ 0_25-0.40 ApartmentOwelling Areas 0 70 Industrial and Commercial Light areas 0.$o Heavv areas 090 fta ovrea . V 33 Concrete V 293 W Brick Roofs ft' _Gravel V 374 fields: Sar Slope Flat: O.2% Average:: 0.95 0.95 A B C D 0.04 0.07 0.11 0.09 0.12 0.15 0.13 0.18 0.23 O:: S:\_projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS_12-15-16 5/31/2017,1:51 PM Version 9.0, December 2016 ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin 8, Design Point 2 2 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100 -Year or 2S -Year With 100 -Year Flood Route) 25 5 Area of Drainage Subbasin (SF or Acres) Acres Acre! 6 Determine the Weighted Runoff Coefficient (C) C=((C1xA1)+(C2xA2)+(CnxAn))/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 1 User calculate min [io -7.11_ int rtirir to Chn Mnre Snhha li I1 Subbasin I Runoff Coefficients "C Subbasin Subbasin Subbasin 0.70-0.45 Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 0.14 0.18 0.32 0.95 0.40 0.64 8 Determine the average rainfall intensity (i) from IDF Curve based on 9 Calculate the Post -Development peak discharge (QPeak) 10 Calculate total runoff vol (V) (for sizing primary storage) V = Ci(Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 13 Volume Summary Surface Storage: Basin Basin Forebay Primary Treatment/Storage Basin Subsurface Storage Volume With 15% Sediment Factor Q* .k 0.38 cfs V 509 ft 95th 0.60 in V„ 443 ft, cfs V 51 ft' V 458 fts V 586 W S:\_projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS_12-15-16 Version 9.0, December 2016 Estimated Runoff Coefficients for Various Surface Type of Surface I Runoff Coefficients "C Business Downtown areas 0.70-0.45 neighborhoods_ 0.50-0.7o _Urban Residential Single Family 0.35.0.50 _Multbfamily_ 0.60.0.75 Residential (rural) 0-25.0.40 Apartment Dwelling Areas_ _ Industrial and commercial Light areas a.ao Streets Asphalt Concrete Slope Flat: 0-2% Average: 2-6% 0,95 0.95 Soil Type A I B C 0 0.04 0.07 0.11 0,: o.09 0.12 0.15 0.; 0.13 0,18 0.23 0.: 5/31/2017, 1:51 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basins A&B, Design Point 3 3 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations} 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 25 5 Area of Drainage Subbasin (SF or Acres) Acres Acre! 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn))/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 1 User calculate min rio mi,, Click to Show More Subbasins ❑ Subbasin i Ctae,k Subbasin Subbasin Subbasin V Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 0.24 0.27 726 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.95 Brick cfs 13 Volume Summary 0.51 Surface Storage: Basin Basin Forebay V 83 fts 0.95 0.40 751 ft' Subsurface Storage Volume With 15% Sediment Factor V 0,66 W 8 Determine the average rainfall intensity (i) from IDF Curve based on 9 Calculate the Post -Development peak discharge (4Peak) i Ctae,k 1.85 0.62 in/hr cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 835 ft V = Ci (Tc=60)Ax3600 Railroad yard areas 11 Calculate Volume of Runoff Reduction Vrr t1n]mproved areas .:_.:._._ ... ............ Enter Percentile Storm I (95th percentile = 0.60 in) Streets 95th 0.60 in Enter Runoff Reduction Vol 195th Percentile=0.60-in x Area x C) Vr, 726 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.95 Brick cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 83 fts Primary Treatment/Storage Basin V 751 ft' Subsurface Storage Volume With 15% Sediment Factor V 960 W S:`projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD CALCS_12-15-16 Version 9.0, December 2016 Estimated Runoff Coefficients for Various Surfac< Type of Surface Runoff Coefficients "C Business Downtown areas 0.70-0.95 Wban_neighb_orhoods 0.50.0.70 Residential Single Family 0 35 0.50 Multi -family 0600.75_ Residential (ruralV 0.25-0.40 Light areas 0.80 Heavy areas 0.90 Parks, cemeteries 0.10 Railroad yard areas t1n]mproved areas .:_.:._._ ... ............ t0,20 0.10 ____..... Streets Asphalt .0.95 Concrete 0.95 Brick .0.95 Slope Flat: 0 -try Average: 2-6% Steep:>6 Adapted from ASCE Sol] Type A B C () 0-040.17 0.11 0.09 0,12 0.15 0.13 0.18 0.23 0.: 5/31/2017,1:51 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin C 4 2 Is area drainage basin map provided? YES (map mustbe included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 25 5 Area of Drainage Subbasin (SF or Acres) Acres Acre. 6 Determine the Weighted Runoff Coefficient (C) C=[(CSxAl)+(C2xA2)+(CnxAn))/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User calculate min rllrk to Shnw Mnre Suhhaslns n Subbasin Runoff Coefficients "< Subbasin Subbasin Subbasin 0.70-0.95 Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 0.12 0.02 Heavy areas 0.90 0.14 0.95 0.40 0.87 8 Determine the average rainfall intensity (i) from IDF Curve based on 9 Calculate the Post -Development peak discharge (C.Peak) 10 Calculate total runoff vol (V) (for sizing primary storage) V = Ci(Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 13 Volume Summary Surface Storage: Basin Basin Forebay Primary Treatment/Storage Basin Subsurface Storage Volume With 15% Sediment Factor Q,.k 0.23 cis V 303 ft 95th 0.60 in V„ 264 ft, cfs V 30 W V 273 fts V 349 ft' 5:\_projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS_12-15-16 Version 9.0, December 2016 Estimated Runoff Coefficients for Various Surfac( Type of Surface Runoff Coefficients "< Business Downtown areas 0.70-0.95 Urban neighborhoods 0,50.0.70 Residential Single Family. 0.35.0.50 Multi -family 0.60.0.75 Residential (rural) 0.25-0.40 _Apartmary Dwelling Areaz 0.70 _- Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Asphalt Concrete Fields: Sandy soil Slope Flat! 0.2%, Average: 2-6% 0.95 0.95 Soil Type A B C 0 0.04 0.07 0.11 0:: 0.09 0.12 0:15 0.: 0.13 0.18 0.23 0.: 5/31/2017,1:51 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin D 5 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 25 5 Area of Drainage Subbasin (SF or Acres) Acres Acre! 6 Determine the Weighted Runoff Coefficient (C) C=((C1xA1)+(C2xA2)+(CnxAn))/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or default 10 1 User Calculate min 10'Min. [lick to Show More Subbasins F1 Subbasin 1.85 Subbasin Subbasin Subbasin cfs Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 30 0.11 0.11 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs Industrial and Commercial _02_0 0.22 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10.0.25 Playgrounds 0.95 0.40 Railroad card areas —i 0 ZO 0.40 0.68 8 Determine the average rainfall intensity (i) from IDF Curve based on 1 1.85 in/hr 9 Calculate the Post -Development peak discharge (QPeak) (beak 0.27 cfs Downtown areas- 0.70-0.95 10 Calculate total runoff vol (V) (for sizing primary storage) V 369 ft V = Ci(Tc=60)Ax3600 _ I 11 Calculate Volume of Runoff Reduction Vrr 35 0.50 0":' Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vol321 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 37 ft' Primary Treatment/Storage Basin V 332 W Subsurface Storage Volume With 15% Sediment Factor V 424 W S:\_projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS_12-15-16 Version 9.0, December 2016 Estimated Runoff Coefficients for Various SUrfaC( Type of Surface Runoff Coefficients "( Business Downtown areas- 0.70-0.95 Urban neighborhoods 0.50.0.70 Residential _ I Single Family: 35 0.50 0":' Multi -family }IL 11:6. 0.75 Residential Qural 0 25-0.40 — — — Apartment Dwelling Areas Industrial and Commercial _02_0 Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10.0.25 Playgrounds Railroad card areas —i 0 ZO 0.40 Streets Asphalt Concrete Brick Fields; Sandy soil Slope Flat: 0.2% Average: 2-6%. 0.95 0;95 0.95 Soil Type A B E D 0.04 0.07 0.09 0,12 0,13 0.18 0.23 O.: 5/31/2017,1:51 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin C&D, Design Point 4 6 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 25 5 Area of Drainage Subbasin (SF or Acres) Acres Acre! 6 Determine the Weighted Runoff Coefficient (C) C=((C1xA1)+(C2xA2)+(CnxAn))/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 1 User calculate min 79 `!n:� Click to Show More Subbasins ❑ Subbasin (� 1 Cy..k Subbasin Subbasin Subbasin V Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 0.23 0.13 584 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary 0.36 Surface Storage: Basin Basin Forebay V 67 ft' 0.95 0.40 605 ft' Subsurface Storage Volume With 1S% Sediment Factor V 0.75 W 8 Determine the average rainfall intensity (i) from IDF Curve based on 9 Calculate the Post -Development peak discharge (QPeak) (� 1 Cy..k 1.85 0.50 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 672 ft V = Ci (Tc=60)Ax3600 0,95 Brick 0.95 11 Calculate Volume of Runoff Reduction Vrr 0.13 0:18 0.23' 0.. Adapted from ASCE Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V„ 584 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 67 ft' Primary Treatment/Storage Basin V 605 ft' Subsurface Storage Volume With 1S% Sediment Factor V 773 W S:\_projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS_12-15-16 Version 9.0, December 2016 Estimated Runoff Coefficients for Various Surface Type of Surface Runoff Coefficients "t Business Downtown areas 0.70-0.95 _ Urban neighborhoods 0.500.70 Residential ------- —_ — Single Family: 0.35.0.50 _Multi -family 0.60.0.75 Residential (rural) 0.25-0.40 Light areas 10:80 I Railroad yard areas 1 0.20 ........_.._..._.._.......___.._.__..__ .............. lJnimproved areas .,......... .010 Streets Asphalt 0.95 Concrete 0,95 Brick 0.95 Fields: Sandy soil Soil Type Slope -A—__ 8...__:_ Flat: 04% 0.04 0-07 0.11 0..' Average: 2-6% 0.09 0,12 0.15 0.; Steep;>6% 0.13 0:18 0.23' 0.. Adapted from ASCE 5/31/2017,1:51 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin C, D & E, Design Point 5 7 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 25 5 Area of Drainage Subbasin (SF or Acres) Acres Acre. 6 Determine the Weighted Runoff Coefficient (C) C=[(ClxA1)+(C2xA2)+(CnxAn)j/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 1 User calculate min �10 Mi i. _ ..... ............� rlir4 to Chnu, Mnrn Ciihha<inc I1 Subbasin 1 Subbasin Subbasin Subbasin Qpeak Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 0.28 0.40 Heavv areas 0.90. Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vr, 0.68 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary 0.95 0.40 Basin Forebay V 106 ft' Primary Treatment/Storage Basin V 0.63 ft° Subsurface Storage Volume With 15% Sediment Factor V 1,217 ft' 8 Determine the average rainfall intensity (i) from IDF Curve based on 1 1.85 in/hr 9 Calculate the Post -Development peak discharge (QPeak) Qpeak 0,79 cfs _ _ Residential _ l SingleFamily 0350.50 10 Calculate total runoff vol (V) (for sizing primary storage) V 1,058 ft V = Ci(Tc=60)Ax3600 0.70 Industrial and Commercial 11 Calculate Volume of Runoff Reduction Vrr 080 Heavv areas 0.90. Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vr, 920 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 106 ft' Primary Treatment/Storage Basin V 952 ft° Subsurface Storage Volume With 15% Sediment Factor V 1,217 ft' S:\_projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS_12-15-16 Version 9.0, December 2016 Estimated Runoff Coefficients for Various Surfac< Type of Surface I Runoff Coefficients "t Business Downtown areas 0.70-0.95 Urban neighborhoods_ 0.50.0.70_ _ _ Residential _ l SingleFamily 0350.50 Multi-family--I{I�0 Multi- 60 0.75 Residential (rural) 0.25-0.40 - Apartment Owe0Ing Areas 0.70 Industrial and Commercial Light areas 080 Heavv areas 0.90. Streets Asphalt Concrete Brick Roots G_r_a_vei _ Fields: Sandy soil Slope Flat: 0.29$ Average: 2-6%. Steep:>6% __...___ ___............. _..._. Adanted from ASCE 0,95 0:95 A B C 0 0.04 0.07 0.11 0:: 0.09 0.12 0:15 0.13 018 0.23 0.: 5/31/2017,1:51 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin A, Design Point 1 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100 4 Enter number of storage facilities (25 max) 7 Click to Show More Subbasins ❑ 5 Area of Drainage Subbasin (SF or Acres) Acres Acre! 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn))/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 user Calculate min to Min Subbasin i Subbasin Subbasin Subbasin /� O* .k Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 0.10 0.09 Enter Percentile Storm t (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 0.19 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary 0.95 0.40 Basin Forebay V 45 WPrimary Treatment/Storage Basin V 0.69 W Subsurface Storage Volume With 15% Sediment Factor V 521 W 8 Determine the average rainfall intensity (i) from IDF Curve based on i 2.58 in/hr 9 Calculate the Post -Development peak discharge (CiPeak) /� O* .k 0.34 cfs Single Family 0.35.0.50 Multi -family-__ ------------------- 0.60.0.75 10 Calculate total runoff vol (V) (for sizing primary storage) V 453 it V = Ci (Tc=60)Ax3600 Light areas 0.80 11 Calculate Volume of Runoff Reduction Vrr 0.90 Enter Percentile Storm t (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 283 W 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 45 WPrimary Treatment/Storage Basin V 407 W Subsurface Storage Volume With 15% Sediment Factor V 521 W S:`,projects\2017\17034 Geddes Sub\Admin\Reports\SW\Caiclulations\ACHD_SD_CALCS_12-15-16 Version 9.0, December 2016 Business Downtown areas. 0.70-0.95 Urban neighborhoods 0,50_0.70 Residential Single Family 0.35.0.50 Multi -family-__ ------------------- 0.60.0.75 Resid6ntinl (rurai� 0.25.0.40 _Apartment_Dwelling Areas _0.70___ d� Industrial and Commercial Light areas 0.80 Heavv areas 0.90 Streets Asphalt Concrete Slope Plat: 0-2`90 Average: 2.6% 0.95 0.95 A6 C D 0.04 0.07 0.11 0.' 0.09 0.12 0.15 0.; 0.13 0.18 0.23 0:: 5/31/2017, 1:50 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin B, Design Point 2 2 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) Acres Acre: 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xAl)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 Usercalculate min �to 4i.. 111,4 - chnu, AA— 4ihkxinc n Subbasin i Subbasin Subbasin Subbasin QPeA Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 30 0.14 0.18 Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vr, 0.32 ft - 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary 0.95 0.40 Basin Forebay V 71 ft' Primary Treatment/Storage Basin V 0.64 ft' Subsurface Storage Volume With 1S% Sediment Factor V 815 ft' 8 Determine the average rainfall intensity (i) from IDF Curve based on i 2.58 in/hr 9 Calculate the Post -Development peak discharge (QPeak) QPeA 0.53 cis 10 Calculate total runoff vol (V) (for sizing primary storage) V 708 ft V = Ci(Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vr, 443 ft - 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 71 ft' Primary Treatment/Storage Basin V 638 ft' Subsurface Storage Volume With 1S% Sediment Factor V 815 ft' S:\_projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS_12-15-16 Version 9.0, December 2016 Estimated Runoff Coefficients for Various Surfaca Type of Surface Runoff Coefficients"( Business Downtown areas 0.70-0.95 urban neighborhoods 0.500.70 Residential Single Family: 0.35.0.50 areas 0.80 r areas 0.9Q Cemeteries 0.10 roundsul 0.20 gad yard areas 10,20 Asphalt Concrete Brick Fields: Sandy soil Slope Flat: 0.2`Yr, Average: 2-6Yo Steep:>6% _ Adapted from ASCE 0,95 Soil Type A 6 C Q 0.040.07 0.11 0.09 0.12 0:15 0.13 0.18 0.23 0.: 5/31/2017,1:50 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACRD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basins A&B, Design Point 3 3 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) Acres Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 r1911,1 seM6r cakuiate min to ,� ? rlirk to Chnw Mora Suhhadns rl Subbasin 2.58 Subbasin Subbasin Subbasin cfs Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 0.24 0.27 726 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.80 cis Heavy areas 0.90 0.51 0.10.0.25 Playgrounds Railroad yard areas I 0 20 0.40 Unimproved areas. 0.95 0.40 Streets Asphalt 9.95 Concrete 0.95 0.66 Brick .0:95 _-� Roofs 0.95 8 Determine the average rainfall intensity (i) from IDF Curve based on 1 2.58 in/hr r� 9 Calculate the Post -Development peak discharge (CiPeak) 0,p .k 0.87 cfs Residential 10 Calculate total runoff vol (V) (for sizing primary storage) V 1,161 ft V = Ci(Tc=60)Ax3600 0.60-0.75 _ it Calculate Volume of Runoff Reduction Vrr 0.25-0.40 Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 726 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.80 cis 13 Volume Summary Surface Storage: Basin Basin Forebay Primary Treatment/Storage Basin Subsurface Storage Volume With 15% Sediment Factor V 116 fti V 1,045 W V 1,335 ft' S:`projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS 12-15-16 Version 9.0, December 2016 �Estimated Runoff Coefficients for Various 5urfac( Tl voe of Surface I Runoff Coefficients "t Downtown areas 0.70-0.95 Urban neighborhoods 0.50.0.70 Residential Single Family 0.35x0.50 Multifamily _ 0.60-0.75 _ Residential rural 0.25-0.40 Apartment Owelling_Area_s_-- 0.70------ - Industrial and Commercial - -- Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10.0.25 Playgrounds Railroad yard areas I 0 20 0.40 Unimproved areas. 0.10.0.30 Streets Asphalt 9.95 Concrete 0.95 Brick .0:95 _-� Roofs 0.95 Fields; Sandy soil _____...........-.-___.._ Soli Type Slope A B C 0 Flat: 0.2% 004 007 0.11 0' Average: 2-6%. 0 09 0 12 0.15 0.: 6t.->6% 013 O S$ 0:23 0.: 5/31/2017, 1:S0 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHO checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin C 4 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) Acres Acre 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xAl)+(C2xA2)+(CnxAn))/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 luserCalculate min to Kelp, 1 Click to Show More Subbasins f Subbasin 1 Subbasin Subbasin Subbasin Qp.k Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 0.12 0.02 Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 0.14 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary 0.95 0.40 Basin Forebay V 42 ft' Primary Treatment/Storage Basin V 0.87 ft' Subsurface Storage Volume With 1S% Sediment Factor V 48S ft' 8 Determine the average rainfall intensity (i) from IDF Curve based on 1 2.58 in/hr 9 Calculate the Post -Development peak discharge (QPeak) Qp.k 0.31 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 422 ft V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr 264 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 42 ft' Primary Treatment/Storage Basin V 379 ft' Subsurface Storage Volume With 1S% Sediment Factor V 48S ft' S:\_projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CAICS_12-15-16 Version 9.0, December 2016 Estimated Runoff Coefficients for Various Sur fact Type of Surface Runoff Coefficients "C Business Downtown areas 0,70-0.95 Urban neighborhoods 0.50.0.70 Residential Single Family 0.35,0.50 Mitlti•family_ _ _0.60-0.75 ________-___________ ------ -Residential (rural) _ 0.25-0.4.0 _ Apartment Dwelling Areas 0,70 Industrial and Cot 'cial Light areas 0.80 Heavv areas 0.90 Asphalt 0.95 Concrete 0,95 Brick 0.95 Fields: Sandy soil I Soil Type Slope A B C D Flat: 0-2% 0.04 .0.07 0.11 0.' Average: 2-6% 0.09 0.12 OAS 0.; *--Aly - 0.13 0.18 0.23 0.: 5/31/2017,1:50 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin D 5 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) Acres Acre. 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avi rlirk to Shnw Mnre Suhhaslns n Subbasin ISubbasin In/hr Subbasin Subbasin cfs Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 30 0.11 0.11 321 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.10.0.25 cfs __-... _... _0q Railroad yard areas 0.20-0.40 0.22 0.95 0.40 0.68 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 User Calculate min tonin: 8 Determine the average rainfall intensity (i) from IDE Curve based on1 2.58 In/hr (� 9 Calculate the Post -Development peak discharge (QPeak) C pe.k 0.38 cfs urban neighborhoods 0,500.70 Residential 10 Calculate total runoff vol (V) (for sizing primary storage) V 513 ft V = Ci(Tc=60)Ax3600 0,60-0,75 Residential rural 11 Calculate Volume of Runoff Reduction Vrr _Apartment Owelng Areas 0.70 Enter Percentile Storm 1(95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) Vrr, 321 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 0.10.0.25 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 51 W Primary Treatment/Storage Basin V 462 W Subsurface Storage Volume With 15% Sediment Factor V 590 ft' Sc\_projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS_12-15-16 Version 9.0, December 2016 Estimated Runoff Coefficients for Various Surfact Type of Surface Runoff Coefficients "t Business Downtown areas 0.70-0.45 urban neighborhoods 0,500.70 Residential Single Family. 0.35.0.50 Multbfamii� 0,60-0,75 Residential rural 0.25-0,40 _Apartment Owelng Areas 0.70 Industrial and Commercial Light areas 0.80 Heavy areas 0.90 Parks, Cemeteries 0.10.0.25 _ ou -...� _ . __,.. Playgrounds __-... _... _0q Railroad yard areas 0.20-0.40 Streets Asphalt Concrete Brick Roofs_ Fields; Sandy soil slope Flat: 0.2% Average: 2-6% 0.95 0,95 0.95 Soil Type A B C D 0.04 0.07 0.11 0.' 0.09 0.12 0.15 0.: 0.13 0.18 0.23 0.: 5/31/2017,1:50 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin C&D, Design Point 4 6 2 Is area drainage basin map provided? YES (map must be included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) Acres Acre! 6 Determine the Weighted Runoff Coefficient (C) C=[(ClxAl)+(C2xA2)+(CnxAn))/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 us r[akufate min o R4iii:� rlir4 to chew Mnrn oihhacin< rI Subbasin Runoff Coefficients "C Subbasin Subbasin Subbasin 70-0.95 Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 0.23 0.13 Heavv areas 0.90 0.36 0.95 0.40 0.75 8 Determine the average rainfall intensity (i) from ]OF Curve based on 9 Calculate the Post -Development peak discharge (QPeak) 10 Calculate total runoff vol (V) (for sizing primary storage) V = Ci(Tc=60)Ax3600 it Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile =0.60 in) Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) 13 Volume Summary Surface Storage: Basin Basin Forebay Primary Treatment/Storage Basin Subsurface Storage Volume With 15% Sediment Factor Q.pezk 0.70 cfs V 935 ft 95th 0.60 in Vrr 584 W cfs V 93 W V 841 fts V 1,075 W S:`projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD CALCS_12-15-16 Version 9.0, December 2016 Estimated Runoff Coefficients for Various Surfac( Type of Surface Runoff Coefficients "C Business Downtown areas0 70-0.95 Urban neighborhoods 0 50.0.70 Residential Single Family; 0.35.0.50 Multi -family 0,60-0.7S ------------ Residential (rural) — 0.25-0.40 Apartment Dwelling Areas —0,T0 - 70Industrial Industrial and Commercial Light areas 0.80 Heavv areas 0.90 ( Asphalt slope Flat: 0-2% Average: 2-691 0,95 0.95 AB C 0 0.04 0-07 0.17. 0:: 0.09 0.12 0.15 0.; 0.13 0.18 0.23 0.: 5/31/2017,1:50 PM ACHD Calculation Sheet for Finding Peak Discharge/Volume - Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Peak Discharge Rate using the Rational Method calculated for post -development Calculate Post -Development Flows (for pre -development flows, increase number of storage facilities to create new tab) User input in yellow cells. 1 Project Name Geddes Subdivision, Basin C, D & E, Design Point 5 7 2 Is area drainage basin map provided? YES (map mustbe included with stormwater calculations) 3 Enter Design Storm (100 -Year or 25 -Year With 100 -Year Flood Route) 100 5 Area of Drainage Subbasin (SF or Acres) Acres Acre! 6 Determine the Weighted Runoff Coefficient (C) C=[(C1xA1)+(C2xA2)+(CnxAn))/A Weighted Avg 7 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default 10 1 User calculate Cto hrjn;�-� min [ flick in Shnw Mnre 9ihha<in< n Subbasin V Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 5 Subbasin 6 7 8 9 10 0.28 0.40 cfs 13 Volume Summary Surface Storage: Basin 0.68 Basin Forebay V 147 ft' Primary Treatment/Storage Basin V 1,325 ft' 0.95 0.40 Volume With 15% Sediment Factor V 1,693 ft' 0.63 8 Determine the average rainfall intensity (i) from IDF Curve based on (� 1 2.58 in/I 9 Calculate the Post -Development peak discharge (QPeak) Q,..k 1.10 cfs 10 Calculate total runoff vol (V) (for sizing primary storage) V 1,472 ft' V = Ci (Tc=60)Ax3600 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm I (95th percentile = 0.60 in) 95th 0.60 in Enter Runoff Reduction Vol (95th Percentile=0.60-in x Area x C) V,r 920 ft' 12 Detention: Approved Discharge Rate to Surface Waters (if applicable) cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 147 ft' Primary Treatment/Storage Basin V 1,325 ft' Subsurface Storage Volume With 15% Sediment Factor V 1,693 ft' 5:\_projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS_12-15-16 Version 9.0, December 2016 nated Runoff Coefficients for Various 10 Downtotyn areas 11:70-0:95 70-0.95 Urban neighborhoods 0,.7. Residential --- ------- Single Family 0 35.0.50 Light areas Streets Asphalt .0.95 Concrete 0.95 Brick 0.95 Fields: Sandy soil. I Soil Type Slops A B Flan 0-2% 0 040.07 0 11 0.: Average 2-6% 0 09 0.12 0.15. 0.; Steep:>6%_ 013 0.18 0.23 0.: Adapted from ASCE 5/31/2017, 1:50 PM ACHD Calculation Sheet for Sizing Basins NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Sizing Basins: Size for forebay and print then size for primary storage/treatment basin. User input in yellow cells. 1 Project Name Geddes Subdivision, Basins A&B, Design Point 3 truer numoer or uasins fro maxi c 3 Number of Cells (Forebay+Primary=2, Primary Only=1) 1 4 Design Storm 100 '0, y3' 5 Weighted Runoff Coefficient C 0.66 6 Area A (Acres) 0.51 acres 7 Approved Discharge Rate (if applicable) 0.00 cis 8 1 -Basin Forebay V 1,161 it Toggle between Forebay and Primary Basin, enter data and print far each sac sole z A qw '' Sa4 S}4et < -----------L ----- -9. $ik$14,L Forebay 9 Select Forebay Shape 5 -Irregular 10 Width of Forebay Bottom W 5.0 ft 11 Length of Forebay Bottom L 55.0 ft 12 Side Slopes (H:1) H:1 3.00 13 Enter Bottom Elevation 14 Enter Top Bank Elevation 15 Enter Water Surface Elevation (WSE) 16 Distance Between Forebay and Primary Basin (blank if na) 17 Enter Elevation Berm 18 Enter High Groundwater Elevation 19 Min. Freeboard Requirement 20 Freeboard Provided 21 Infiltration Area for Forebay Infiltration? Design Infiltration Rate, Enter 0 for no infiltration 22 Infiltration Area for Forebay Asand Enter 0 for no infiltration 23 2548.60 ft 2548.10 it 0.00 ft 0.00 it 0.00 it Link to: IQvN QY>' ': Qv4 4Vs ;OV6 3 iuvl (QV iRSS su<suye: f1BV wC: % �L 0.50 Basin Side Slope Width at New Stage (ft) (H:V) Stage (ft) 8.00 in/hr Ir. NZ Note: infiltration required if bottom slope<l%or 0 outflow IStorm Duration l f total I Q (RunoffVoll Perc Vol I -l- l -Total I Max Vol 24 ( 0 i 24 Saved Stage (ft) Basin Side Slope Width at New Stage (ft) (H:V) Stage (ft) Basin Length at Stage (ft) Surface Area A at Stage ft) Saved Surface Area A at Stage (ft) Surface Area A at Volume Stage (ft) Below Stage OVERIDE (ft') 2545.60 2545.60 3.000 5.0 55.0 Override 0.00 0 2546.00 3.000 0.0 0.0 Override 164.00 33 2546.50 1 3.000 1 0.0 0.0 1 Override 335.00 158 2547.00 3.000 0.0 0.0 Override 524.00 372 2547.50 3.000 0.0 0.0 Override 733.00 687 2548.00 3.000 0.0 0.0 Override 968.00 1,112 2548.10 3.000 0.0 0.0 Override 1021.00 1,211 2548.50 3.000 0.0 0.0 Override 1233.00 1,662 0.00 0.00 0 0.00 0.00 0 ll 0.00 0.00 0 2.90 it depth for storage 25 Does forebay have capacity? 26 Time to drain forebay 90% volume in 48 -hours minimum YES 43.5 hours OK aIUKAEA UK S:LProjects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS_12-15-16 5/31/2017, 1:51 PM Version 9.0, December 2016 ACHD Calculation Sheet for Sizing Basins NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement. The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. Steps for Sizing Basins: Size for forebay and print then size for primary storage/treatment basin. User input in yellow cells. 1 Project Name Geddes Subdivision, Basin C, D & E, Design Point 5 2 toter numcer or basins to maxi 3 Number of Cells (Forebay+Primary=2, Primary Only=1) 1 4 Design Storm 100 '0, y7' 5 Weighted Runoff Coefficient C 0.63 6 Area A (Acres) 0.68 acres 7 Approved Discharge Rate (if applicable) 0.00 cis 8 1 -Basin Forebay V 1,472 ft' Toggle between Foreboy and Primary Basin, enter data and print for each S�SbteL Stir SiereZ t A -_fin., A Y yam/' ' Sfb57geL L <------- .,..,�........... SiIt SlgeZ Forebay 9 Select Forebay Shape 5 -Irregular 10 Width of Forebay Bottom W 5.0 it 11 Length of Forebay Bottom L 55.0 ft 12 Side Slopes (H:1) H:1 3.00 13 Enter Bottom Elevation 2546.90 it 14 Enter Top Bank Elevation 2549.50 it 15 Enter Water Surface Elevation (WSE) 2549.00 it 16 Distance Between Forebay and Primary Basin (blank if na) 0.00 it 17 Enter Elevation Berm 0.00 ft 18 Enter High Groundwater Elevation 0.00 it 19 Min. Freeboard Requirement 0.50 20 Freeboard Provided 0.50 Link to: o.v •'` Qvz QV3 y Q.V4 4.V5 QV6 �0,v7-� ,QV TR5S Sae Styei �'Y L n. W1 E. \�55d¢/$ipez L 21 infiltration Area for Forebay Infiltration? 8.00 in/hr Note; infiltration required if Design Infiltration Rate, Enter 0 for no infiltration bottom slope<I%or 0outflow 22 Infiltration Area for Forebay Asad 42 ftz Enter 0 for no infiltration 23 Adjusted Storage Required Storm Duration I i total I Q Runoff Vol Perc Vol fm -D- _.Total Max Vol 60 Lam! Saved Stage (ft) Basin Side Slope Width at New Stage (it) (H:V) Stage (ft) Basin Length at Stage (ft) Surface Area A at Stage (it') Saved Surface Area A at Stage (ft) Surface Area A at Volume Stage yt) Below Stage OVERIDE (ft) 2546.90 2546.90 3.000 5.0 55.0 Override 42.00 0 2547.00 3.000 0.0 0.0 Override 92.00 7 2547.50 1 3.000 1 0.0 0.0 Override 558.00 169 2548.00 3.000 0.0 0.0 Override 751.00 496 2548.50 3.000 0.0 0.0 Override 963.00 925 2549.00 3.000 0.0 0.0 Override 1195.00 1,464 2549.50 3.000 0.0 0.0 Override 1453.00 2,126 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 2.60 ft depth for storage 25 Does forebay have capacity? 26 Time to drain forebay 90% volume in 48 -hours minimum YES 47.3 hours OK 51UKAGE UK S:\_projects\2017\17034 Geddes Sub\Admin\Reports\SW\Calclulations\ACHD_SD_CALCS_12-15-16 5/31/2017, 1:51 PM Version 9.0, December 2016 Appendix D Geotechnical Report XSITE CONSULTING, LLC Mr. Matt Schultz Revised April 13, 2017 Schultz Development March 27, 2017 Post Office Box 1115 Page 1 of 14 File # 17118-A Meridian, Idaho 83680 Re: Geotechnical Recommendation Report Geddes Property East of 3050 North Blackcat Road Meridian, Idaho Matt: Laboratory test results have been added to our original report. There are no changes to the recommendations within this report. As per your authorization, on March 17, 2017, SITE personnel logged and sampled three test pits on your Geddes Property and generated the following geotechnical recommendations. The test pits were excavated on a single parcel located east of 3050 North Blackcat Road in Meridian, Idaho. A tax parcel number of S1203223480 was located for the parcel on the Ada County Assessor's website. This source indicates the property includes a total of 2.0 acres. Preliminary plans, supplied by the client, indicate that the proposed subdivision will include a short ACHD right of way and approximately nine lots for single-family residences. Current plans include subsurface infiltration trenches for storm water disposal. Based upon our research, observations, and laboratory test results, the site is acceptable for development as a residential subdivision. Recommendations for construction are included herein. We appreciate this opportunity to be of service. When appropriate, we would like to discuss continuing our role as geotechnical consultant during construction. Please contact our office if additional information or services are required. Respectfully subm Bob J. Arnold, PE SITE Consulting, L 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 H /LONSU LTI NG, LLC EXISTING CONDITIONS Subsurface conditions were similar in all three test pits. The site is covered with a thin layer of brown, moist, sandy, silt that ranged from 1.0 to 2.0 feet deep. This layer supports a 4-6 inch organic / rootzone layer. Beneath the topsoil layer is a weakly cemented silt or sandy silt. At approximately five feet deep, this layer becomes more sand than silt and is free of cementing. In the west test pit, this deeper layer is described as sand while in the other two test pits silty sand is appropriate. A thin hardpan or cemented silt layer was encountered in TP -2 at ten feet deep. This layer was not observed in the other two test pits. Groundwater was encountered in all three test pits at 10.5 to 11.0 feet. Monitoring wells were installed in all three test pits for future groundwater measurements. Below the groundwater, the sand was observed to be very clean with little to no silt present. Below the groundwater, sloughing soils prevented deeper excavation with the retained excavation equipment. The subject property consists of a single parcel located in township 3 north, range 1 west, section 3. Well logs for this and adjacent sections were reviewed on the Idaho Department of Water Resources website. The nearest well identified is for a property to the west across Blackcat Road at 3185 Blackcat Road. The attached well log indicates that the static water level was 12 feet deep when the well was drilled in October 2014. It is noted that this was right at the end of the typical irrigation season and therefore should reflect a seasonal high. It is anticipated that groundwater will rise on the subject property during the irrigation season. Staining (rust) in the sand layer indicates that groundwater has risen as high as seven feet below the surface. a, ba a 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 /SITE ONSULTING, LLC CONSTRUCTION RECOMMENDATIONS The following recommendations are based upon observed conditions and reported laboratory test results. • Building code allowed bearing capacity of 1500 psf is appropriate for residential structures to be built on this site. Foundation embedment depth and reinforcement are to meet local code requirements. • Every effort is to be made to prevent irrigation / storm water from entering crawlspaces / basements. This is to include proper waterproofing of foundations, proper compaction of foundation and basement backfill, and lot grading that directs runoff away from foundations. Foundation drains are not required for this development. • Stripping of organic material will require only minor excavation; 4-6" of grubbing can be anticipated to completely remove all organic materials from future right of ways and building pads. This is to be adjusted as needed in the field at the time of construction. Deeper removal depths should be anticipated near ditches and where large bushes and trees are present. • The onsite surface soils are acceptable for use as fill on the residential lots. • Any subgrade surface to receive structural fill or pavement section materials is to be watered and compacted as necessary to meet ISPWC compaction requirements. (95% of maximum dry density as determined by ASTM D-698, "Standard Proctor). The exposed subgrade surface is also to be proof rolled with a loaded water truck or ten yard dump truck to confirm that no soft, excessively wet, or deflecting areas are present. Any such area encountered is to be over M excavated as directed by the project geotechnical consultant. a 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 ZSITE oe CONSULTING, LLC • Subgrade surface must pass both visual inspection and compaction testing. • It should be anticipated that the surface soil will rut or deflect severely if wet when loaded with rubber tire equipment. Wet or deflecting areas are to be over - excavated and repaired with structural fill at the time of construction. Subgrade issues caused by using rubber tire equipment on wet subgrade soils are to be repaired by and any additional cost borne by the contractor. • Imported structural fill used to repair over excavations or to elevate the building pads, support foundations or other concrete, and beneath future pavements should meet the "Sub Base" specifications of the ISPWC Specifications. • The cleared, grubbed and approved subgrade and each lift of imported structural fill is to be compacted to a minimum of 95% of the maximum dry density as determined by ASTM D698, "Standard Proctor". • Inplace testing to confirm proper compaction is required. One test each lift, (minimum of three), for every 5000 square feet of fill surface is recommended. The project geotechnical engineer can waive subgrade compaction testing based upon visual inspection at the time of construction. • For structural fill placed on residential lots, inspection at the time of testing should confirm that subgrade and structural fill is firm and stable, and free of soft, excessively wet, or deflecting areas. Subgrade and structural fill can pass compaction results and still be rejected if rutting or deflection is present. • Unacceptable soils are to be removed to firm bearing or a maximum depth of 2.0' and replaced with structural fill. Over excavation of wet or soft areas must extend laterally outside foundations a distance equal to the depth of fill. a 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 ONSULTING, LLC • Based upon an R -Value result of R=20, it is recommended that ACHD right of ways consist of the following section. It is noted that SITE uses a maximum value of R=20 for design of residential streets. Structural Layer Thickness HMA 2.5" Base Course 4.0" Sub Base 10.0" • The following slab on grade floors sections are recommended for inside the residential structures: Structural Layer Living Space Garage Floors PCC w/ fiber mesh 4.0" 4.0" Base Course 4.0" 6.0" Subgrade Properly Compacted and Inspected • Stormwater disposal can be accomplished with conventional infiltration facilities. A percolation rate of P = 8 inches / hour is recommended for design of onsite facilities provided they extend to the free flowing sands encountered in the test pits at greater than five feet deep. It should be anticipated that ACHD will require confirmation of percolation rate at the time of construction. • Testing and engineering inspection services recommended herein are critical for successful construction of the planned subdivision. Any recommendations provided by a licensed geotechnical or civil engineer during the construction of this development, that differ from recommendations herein are to be communicated to SITE prior to execution. Appendix Follows Ln v to M a 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 SITE /orLONSULT1NG, LLC Proposed Plat Aerial Photo (Test Pit Locations) Test Pit Logs (3 pages) Soil Log Legend / Abbreviations and Acronyms Pavement Section R -Value Report Well Log 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 NFIN 0 0 z F— 'p CJS 110' 90 L10 Cil Iml Co S2 Cn 110, 110, //SITE ONSULTING.. LLC PROPOSED PLAT 1,295 -0- Cli :0. (M CO cn cn 82' Cli — Cn C� 0 823_ CO Cn 0 N 82' Gn c OD a C, C� 83' Cn - 0 C�o C� -j 0 83' I 82' 1-0 O 82' CD 0 46' 82' ca C� Cn 0, )0 C') > Fr] F-9 F9 I -I 'm 208-440-6276 bjarnoldpe@msn.com Post Office Box 190537 Boise, Idaho 83719 SITE ONSULTING, LLC AERIAL PHOTO (Google Earth) Test Pit Locations by hand held GPS 00 w tw a 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 SITE ONSULTING, LLC TEST PIT LOG Test Pit: TP -1 File #: 17118-A Client: Schultz Development Date Excavated: 03/17/17 Project: Geddes Property Excavated By: Culver Excavation Location: West End Logged By: B. Arnold - SITE DEPTH SOILS DESCRIPTION 1.0" 1 3/4" 1 1/2" 1 3/8" 1 #4 #10 #40 #100 #200 1 %M I LL I PI 0.0-1.0 Brown, Moist, Silty, SAND with 4-6" rootzone 1.0-5.0 Brown, Wet, Sandy, SILT (ML) with cemented layers (cemented pieces in sieves) 1.5 100 90 87 78 59 46 36.5 28.6 1 NP NP 4.5 1 100 92 79 76 65 42 32 27.4 29.4 NP NP 5.0-11.0 Tan to White, Wet to Saturated, SAND 6.0 1 100 1 97 1 87 1 81 68 13 2 1.4 2.7 NP NP 11.0 Bottom of Test Pit Groundwater at 10.5' Sloughing Soils below Groundwater Monitoring Well Installed... TL=14.33', CH=3.44' Cn 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 SITE ONSULTING, LLC TEST PIT LOG Test Pit: TP -2 File #: 17118-A Client: Schultz Development Date Excavated: 03/17/17 Project: Geddes Property Excavated By: Culver Excavation Location: Center, North side Logged By: B. Arnold - SITE DEPTH SOILS DESCRIPTION 1.0" 3/4" 1/2" 3/8" #4 #10 #40 #100 #200 %M LL PI 0.0-1.0 Brown, Moist, Silty, SAND with 4-6" rootzone 1.0-5.0 Brown, Moist, Cemented, Sandy, SILT (ML) (cemented pieces in sieves) R -Value Sampled R=76 100 92 75 60 41 32.2 21.1 NP NP 5.0-10.0 Brown, Moist, Sandy, SILT (ML) 7.5 1 1 1 100 92 87 71 60.0 25.1 NP NP 10.0-10.2 2-3" cemented silt, Hardpan Layer 10.2-11.5 Coarse, Tan to White, Saturated, Silty, SAND 10.5 1 100 1 95 1 90 1 70 55 36 26 20.3 17.8 NP NP 11.5 Bottom of Test Pit Groundwater at 11.0 - Sloughing Soils below Groundwater Monitoring Well Installed... TL=15.09', CH=3.58' 0 a M A a 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 ONSULTING, LLC TEST PIT LOG Test Pit: TP -3 File #: 17118-A Client: Schultz Development Date Excavated: 03/17/17 Project: Geddes Property Excavated By: Culver Excavation Location: East End Logged By: B. Arnold - SITE DEPTH SOILS DESCRIPTION 1.0" 3/4" 1/2" 3/8" #4 #10 #40 #100 #200 %M LL PI 0.0-2.0 Brown, Moist, Silty, SAND with 4-6" rootzone 2.0-5.0 Brown, Wet, Cemented, Sandy, SILT (ML) (cemented pieces in sieves) 3.0 100 1 98 1 95 83 50 36 20.7 21.6 NP NP 5.0-11.0 Light Brown to Tan, Moist to Saturated, SAND 11.0 Bottom of Test Pit Groundwater at 10.5' Sloughing Soils below Groundwater Monitoring Well Installed... TL=15.00', CH=3.79' rl a M co CL 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 SITE ONSULT1NG, LLC SOIL LOG LEGEND UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM STANDARD TEST METHOD D 2487 FOR CLASSIFICATION OF SOIL FOR ENGINEERING PURPOSES) DIVISIONS American Association of State Highway & Transportation Officials TYPICAL DESCRIPTIONS COARSE GRAINED SOILS < 50% - #200 GRAVEL & GRAVELLY SOILS <50% - #4 <5% #200 GW Well -graded gravel, gravel -sand mixture, little or no fines. GP Poorly -graded gravel, gravel sand mixture, little or no fines 5-12%-#200 > 12% - #200 GM Silty gravel, gravel -sand silt mixtures GC Clayey gravel, gravel -sand -clay mixtures SAND & SANDY SOILS > 50%- # 4 <5% #200 SW Well -graded sand, gravelly sand, little or no fines. SP Poorly -graded sand, gravelly sand, little or no fines >12%- #200 SM SC Silty sand, sand -silt mixtures Clayey sand, sand -clay mixtures FINE GRAINED SOILS SILTS AND CLAYS LL < 50% INORGANIC ML CL Inorganic silt and very fine sand, rock flour, silty or clayey fine sand or clayey silt with slight plasticity Lean clay -low to medium plasticity, gravelly clay, sandy clay, silty clay ORGANIC OL Organic silt and organic silty clay of low plasticity SILTS AND CLAYS LL > 50% INORGANIC MH 11 CH Elastic silt, micaceous or diatomaceous fine sand or silty soil. Fat clay - high plasticity ORGANIC OHI Organic clay-med. or high plasticity: organic silt 71 ORGANIC SOILS PT Peat, humus, swamp soil with high organic content ABBREVIATIONS AND ACRONYMS AASHTO American Association of State Highway & Transportation Officials ACP Asphaltic Concrete Pavement ASTM American Society for Testing and Materials BH Bore Hole IBC International Building Code ISPWC Idaho Standard for Public Works Construction ITD Idaho Transportation Department NP Non Plastic PCC Portland Cement Concrete PCF Pounds per Cubic Foot PSF Pounds per Square Foot TP Test Pit USES Unified Soil Classification System N bioN M f6 CL 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 SITE CONSULTING. LLC DESIGN SECTION CALCULATIONS Project: Geddes Property File No.: 17118-A Geddes @ MoonLake Drive Calc By: B. Arnold client: Schultz Development Date: 03/27/17 Design Thickness Equation: T = (0.0384) (TI) (100-R) = GE (inches) T= Design Thickness TI = Traffic Index = 6 By ACHD GE = Gravel Equivalent R = R -Value = 20 By Soils Test GE= 18.4 Inches ACHD ACP, 3/4" Road Base and Aggregate Subbase Actual Thickness Equivalent Thickness ACHD Asphalt Concrete Thickness = 2.5 Inches ACE= 5.0 Inches 3/4" Road Base Thickness Desired = 4.0 Inches RBE= 4.6 Inches Calculated Aggregate Subbase Thickness Equation: SB= 9.8 Inches RECOMMENDED DESIGN SECTION Asphaltic Concrete = 2.5 inches 3/4" Road Base = 4.0 inches Aggregate Subbase = 10.0 inches SITE Recommends maximum R -Value of R=20 for Subdivisions 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 /'SITE ONSULTING. LLC pavoolont 811gineetyng 11m RejIng " S8n Lois Obi,,-,pu RESISTANCE (R) VALUE TES ASTM D 2844 Laboratory No.- L170240 Project No.: 170023 Sample Date: NIA Report Date: April 5, 2017 Client Site Consulting LLC Project Name. 2017 Laboratory Testing Sample Description* Brown Silty San Sample Location! Geddes 800 700 600 500 400 300 200 100 0 'Exudation Pressure (RS.1.) —Resistance Value Test —300 P. 100 90 80 70 60 50 40 30 20 10 0 Specimen No. 4 6 Moisture Content 21.4 -5 20.0 19.3 Dry Density (PCF) 99,0 99.0 98.7 Resistance Value (R) 72 77 80 Exudation Pressure (PSI) 160 336 557 ,Expansion Pressure 4 30 35 JAs Received Moisture Content 21.4 A Ktblb IANL;h VALUL Al MU fb Reviewed By: Brandon Rodobaugh AN Materials Engineer WELL LOGS 208-440-6276 bjarnoldpe@msn.com Post Office Box 190537 Boise, Idaho 83719 SITE /CONSULTING, LLC Fem 23,0-7 &07 IDAHO DEPARTMENT OF WATER RESOURCES WELL DRILLER'S REPORT 1, WELL TAG NO 13 VI 1U, v erff'@ tic, -" A Z 0WHERL AHM's C it, la '2 StAff Z1,11 300-4 LQCATIOM 'o - L rtK sf Wml $1, --f& e ft-k... 41 USE n 6. 01111.1, METHM "W-11,Aw LJC---b'o EI0jw-_--- 7, SEALING pR0CrbUIlE8! CASNGILINEW 411 0 0 0 n Ll n El [3 S. PERFORATIDIMSCRERM ny nn m -j oy nwTqm '1214-"L�,��-�--,,-.-.-�--.-.,. f,7 2- Lel,11t of HL -41"l. Lt Qf TOO" rz':f,.!y Ely oil Type 10,FILTERPACK: M FL6I'IRIGARTiSM: RIMmqAAC�'­7 6 Y P—a (PSIG) "cO,v corLTA deVm 12STATIC WATER LEVEL .,,d WELL MIS,, i1eplAG:yt.txlgrc-- ----- Sisk 13o.lblll 1,0. klv. Ct") Well lost Test- th.di waW qu"Izfy ",I C"" ZK� A? P— of efi T. Is) ---- " -11�11i�'A�V.C—t0a—'—"�' --l' -11m, — I J11- ,CIL 9 77", VPD --------------- - - - 14. DRILLERS CERTIFICATION! bVis eel' (y 9 i a I all ir!filmm v.A a r,St Ne, ,sn sia rd wd s wsro Co; p p4' -d we!F M ols Ims isrmm d, yam= r 'Op.'V'3,.11 Coto 0"'tor, I _-, Dat. I--,--- I---,- - S19 -f— of Pd -1p.1 bflil.r .,.d IV qulld, 6�0 Nothing Follows Ln on 208-440-6276 bjarnoldpe@msn.com Post Office Box 190537 Boise, Idaho 83719 Mr. Matt Schultz June 7, 2017 Schultz Development Page 1 of 2 Post Office Box 1115 File # 17118_B Meridian, Idaho 83680 Re: Geotechnical Report Addendum #1 Geddes Property East of 3050 North Blackcat Road Meridian, Idaho Matt: As per you request, SITE has measured the groundwater elevation monthly in the three wells we installed in March 2017 on the referenced property. We will continue with month measurements through the end of this irrigation season. Groundwater elevations to date are listed in the table below. Location TP -1 TP -2 TP -3 Casing Height 3.44 3.58 3.79 Hub Elevation 2549.18 2550.28 2550.24 Casing Elevation 2552.62 2553.86 2554.03 311712017 Date Excavated 10.50 2542.12 11.00 2542.86 10.50 2543.53 4/28/2017 Water Elevation 12.15 2540.47 12.44 2541.42 12.51 2541.52 5/30/2017 Water Elevation 10.70 2541.92 10.52 2543.34 10.66 2543.37 Water Elevation Water Elevation Highest Measured Groundwater 2542.12 1 2543.34 2543.53 We appreciate this opportunity to be of service. Please contact our office if additional information or services are re uired. AL Respectfully Respectfully submi Bob J. Arnold, PE SITE Consulting, L 1-4 cu 40 nom. 208-440-6276 * bjarnoldpe@msn.com * Post Office Box 190537 * Boise, Idaho 83719 ONSULTING, LLC Aerial Photo Monitoring Well Location nothing follows 71 a) to ro a 208-440-6276 * bjarnoldpe@msn.com * Posh Office Box 190537 * Boise, Idaho 83719 NVId �dVOWNV� flSNVld 1N3Vl3AOHdVll 3dVOSCINVI l C11 'NVl(]lH3V4 klil 7* NOlSlAl(iensS3(1G30 11 I lmO>IC)I3aa CL c SliVi 4 3dVOSaMdI SNdld 1N3W3AOHdWl 3d`dOSGNV] al 'NdlalH3W NOISIA1a8nS S3aa3J y 11 I VUE a $ 8i$ YHO, �� M 0 Z � Nn 9 g LQ � J k� a 4 zLu W z 5`LL U� GL® 0 z C7 m O w Qa z°in N c� M 9 g LQ � J