D 170526 CZC HolyApostles LandscapeDetails 1170011.CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. 2.ALL EXISTING TREES OUTSIDE OF WORK LIMITS WILL BE RETAINED AND PROTECTED DURING THE CONSTRUCTION PROCESS. 3.NEW TREE PLANTING, SEE DETAILS 1/L1.00. CONTRACTOR SHALL STAKE ALL TREES DEEMED NECESSARY, I.E..... FROM BEING BLOWN OVER, PLANTED WITH LOOSE ROOT BALL, ETC. CONTRACTOR'S OPTION. 4.ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. 5.ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF ACCEPTANCE BY OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. 6.FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE WITH SITE GRADING PLAN. 7.IN ALL PLANTER BED AND LAWN AREAS, THE TOP 6 INCHES OF TOPSOIL WILL BE AMENDED TO PROVIDE NECESSARY NUTRIENTS TO PLANT MATERIAL AT A RATIO OF 3 CUBIC YARDS OF COMPOST/ORGANIC MATTER PER 1000 SQUARE FEET. ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL. ALL TREE PITS SHALL BE A MIX OF SEVEN PARTS TOPSOIL (AS SPECIFIED IN THESE NOTES) AND THREE PARTS COMPOST/ORGANIC MATTER, BY VOLUME. 8.FERTILIZE ALL TREES AND SHRUBS WITH 'AGRIFORM' PLANTING TABLETS. QUANTITY PER MANUFACTURER'S RECOMMENDATIONS. 9.ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18" OF TOPSOIL, SOD AREAS A MINIMUM OF 12" OF TOPSOIL. SPREAD, COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3" BELOW SURFACE OF WALKS AND CURBS IN PLANTING BED AREAS, AND 1/2" IN LAWN AREAS. 10.RE-USE EXISTING SURFACE TOPSOIL WHERE POSSIBLE. VERIFY SUITABILITY OF SURFACE SOIL TO PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN NECESSARY. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTORS ARE RESPONSIBLE TO EITHER: A) PROVIDE APPROVED IMPORTED TOPSOIL, OR B.) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS, PLANTS, SODS, STONES, CLAY LUMPS AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. 11.IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, PROVIDE NEW TOPSOIL THAT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. 12.OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OCCURS IN A DEPTH OF NOT LESS THAN 4 INCHES. 13.IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. 14.ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH ENSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. Landscape Notes: Sheet Notes: CHINDEN BLVD: WIDTH OF STREET BUFFER: 35 FOOT FUTURE RIGHT OF WAY: 70 FOOT LINEAR FEET OF STREET FRONTAGE:1,102 FEET LINEAR FEET OF EXISTING LANDSCAPED STREET FRONTAGE: 827 FEET LINEAR FEET OF STREET FRONTAGE TO BE LANDSCAPED: 275 FEET NUMBER OF STREET TREES REQUIRED 8 (MINUS CURB CUT):NUMBER PROVIDED 10 MERIDIAN ROAD: WIDTH OF STREET BUFFER: 35 FOOT LINEAR FEET OF EXISTING LANDSCAPED STREET FRONTAGE: 745 FEET RESIDENTIAL SUBDIVISION TREES:NA ACREAGE AND PERCENTAGE DEDICATED FOR COMMON OPEN SPACE:NA ACREAGE AND PERCENTAGE DEDICATED FOR QUALIFIED OPEN SPACE:NA NUMBER OF TREES PROVIDED ON COMMON LOTS:NA MITIGATION FOR REMOVAL OF TREES:ALL TREES DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED. ALL TREES ON SITE ARE TO BE RETAINED AND PROTECTED UNLESS OTHERWISE NOTED, REFER TO TREE PROTECTION NOTES. THE SITE DOES NOT HAVE ANY DITCHES OR OTHER NATURAL FEATURES SUCH AS CANALS, CREEKS, DRAINS, PONDS, WETLANDS, FLOODPLAINS, HIGH GROUNDWATER AREAS, AND ROCK OUTCROPPINGS EXISTING ON THE SITE. 1.PROTECT THE CRITICAL ROOT ZONE OF THE TREES TO BE RETAINED ON SITE: (NOTE: CRITICAL ROOT ZONE IS THE AREA DIRECTLY BELOW THE DRIP LINE OF THE TREE.) - INSTALL PROTECTIVE ORANGE CONSTRUCTION FENCING AT LOCATION SHOWN PRIOR TO DEMOLITION OR CONSTRUCTION. - DO NOT ALLOW COMPACTION BY EQUIPMENT TRAFFIC DURING CONSTRUCTION OR DURING DEMOLITION. - DO NOT STOCKPILE MATERIALS, DEBRIS OR DIRT WITHIN THE TREE PROTECTION AREA. - MAINTAIN WATERING WITHIN THE CRITICAL ROOT ZONE FROM MID-APRIL TO MID-OCTOBER AT THE RATE OF NOT LESS THAN THE EQUIVALENT OF 1-1/2" OF WATER OVER THE ENTIRE AREA PER WEEK. - DO NOT TRENCH, EXCAVATE, FILL OR OTHERWISE DISTURB THE SOIL WITHIN THE CRITICAL ROOT ZONE. 2.PROTECT THE CROWN AND TRUNK OF TREES TO BE RETAINED ON SITE: - OPERATE EQUIPMENT IN SUCH A WAY AS TO AVOID CONTACT WITH TREE TRUNKS OR BRANCHES. - PRUNING OF TREES SHALL BE PERFORMED BY A LICENSED ARBORIST. 3.ALL TREES DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REPLACED. Tree Protection Notes: PREVAILING WIND DIRECTION REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. SET ROOTBALL ON NATIVE UNDISTURBED SUBSOIL COMMERCIAL SLOW RELEASE FERTILIZER TABLETS BACKFILL WITH SOIL PLANTING MIX. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. ROCK MULCH PER PLANS, KEEP ROCK MULCH 6" AWAY FROM TRUNK 2" x 2" x 8' CEDAR STAKE - DO NOT PENETRATE ROOTBALL. SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. RUBBER CINCH TIE FINISH GRADE ROOT PROBE SOIL LINE UTILIZE SOIL/ROOT PROBE AROUND TRUNK (APPROX. 3-4" AWAY FROM TRUNK) TO LOCATE HIGHEST ROOTS. HIGHEST ROOTS SHOULD BE POSITIONED AT OR SLIGHTLY ABOVE GRADE LEVEL. REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 12 OF ROOTBALL, REMOVE ALL NAILS, TIES, AND PLASTIC FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY BIODEGRADEABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 2x ROOTBALL DIAMETER 3x ROOTBALL DIAMETER NOTES: 1.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD. 2.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5.WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 6.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. 7.ALL TREES LOCATED WITHIN TURF AREAS SHALL RECIEVE 1-IN CRUSHED DECORATIVE ROCK MULCH, 3-IN DEPTH PER SPECIFICATION SECTION 32 93 00. 6" TREE WRAP TRUNK PROTECTION, REMOVE AFTER INSTALLATION 6" 1 Deciduous Tree Planting Scale: NTS 70'10' 1. 6 6 ' HWY 26/CHINDEN BLVD. EXISTING PAVEMENT. EXISTING SWALE EXISTING BERM NEW 10FT PEDESTRIAN PATHWAY EXISTING TREES EXISTING SOD FUTURE 70FT RIGHT OF WAY LINE Pr o j e c t N a m e : Fi l e L o c a t i o n : g: \ 2 0 1 7 \ 1 1 7 0 0 1 \ c a d \ 1 1 7 0 0 1 c z c l 1 . 0 0 l a n d s c a p e p l a n . d w g La s t P l o t t e d B y : mi c h a e l t h o m a s Da t e P l o t t e d : Fr i d a y , M a y 2 6 2 0 1 7 a t 0 9 : 5 2 A M Re v i s i o n s Th i s d o c u m e n t a n d t h e i n f o r m a t i o n c o n t a i n e d h e r e i n m a y n o t b e c o p i e d o r r e p r o d u c e d wi t h o u t e x p r e s s w r i t t e n p e r m i s s i o n o f T h e L a n d G r o u p , I n c . Un a u t h o r i z e d d i s c l o s u r e o r c o n s t r u c t i o n u s e a r e p r o h i b i t e d b y c o p y r i g h t l a w . Date of Issuance: Project No.: Designed by: Checked by: Sheet No.: Sh e e t T i t l e : L1.50 MTA MRT 05.26.2017 117001 CZ C L a n d s c a p e D e t a i l s Ho l y A p o s t l e s Ca t h o l i c C h u r c h Me r i d i a n Id a h o HORIZONTAL SCALE: 1"=5'_XREF 10FT Pedestrian Corridor Pathway Exhibit 5'10'0 A 05.30.17