Loading...
A2.0 ELEVATIONSVF CHECKED JOB NO. 16134 TJK DATE DRAWN RE V I S I O N S FA X ( 2 0 8 ) 3 3 6 - 8 3 8 0 (2 0 8 ) 3 3 6 - 8 3 7 0 10 1 0 S . A L L A N T E P L . BO I S E , I D A H O 8 3 7 0 9 SU I T E 1 0 0 NO . DA T E SHEET ME R I D I A N , ID A H O 8 3 6 4 2 03/20/2017 EXISTING SCALE: 1 A2.0 NORTH ELEVATION 1/4" = 1'-0" SCALE: 3 A2.0 WEST ELEVATION 1/4" = 1'-0" SCALE: 2 A2.0 EAST ELEVATION 1/4" = 1'-0" +96'-0" FINISH GRADE +100'-0" FINISH FLOOR +128-8" T.O. MASONRY +108'-0" T.O. OVERHEAD DOOR +96'-0" FINISH GRADE +100'-0" FINISH FLOOR +128'-8" T.O. MASONRY +128'-8" T.O. MASONRY EXISTING EXISTING DOOR TYPES: DOOR SCHEDULE: DOOR #TYPE SIZE PAIR CONSTRUCTION THICKNESS FINISH FINISH COLOR GLASS FRAME FRAME FINISH HARDWARE GROUP REMARKS 100A - - - 100E DOOR HARDWARE: A 3'-0" x 7'-0"-HOLLOW METAL 1 3 4" 3'-0" x 7'-0"A - - -- - - -HOLLOW METAL 1 3 4" -- -- --- - - PAINT MATCH EXISTING ---HOLLOW METAL PAINT 01 01 - --- --- --- --- - HOLLOW METAL - - - PAINT - --- -- -- MATCH EXISTING PAINT - - GROUP 01: 3EA 1 1 2" PR NRP HINGES 1EA LOCKSET 1EA THRESHOLD 1EA WEATHER STRIPPING 1EA CLOSER A 4 A3.0 1.WALL MOUNTED LIGHT FIXTURES, SEE ELECTRICAL. 2.STEEL PIPE RAILING, WELDED, PAINTED, MATCH EXISTING. 1 1 2" DIAMETER TOP AND BOTTOM RAILINGS. 3.NEW METAL STAIRS AND LANDING. SEE SUBMITTED STEEL FABRICATOR PLANS. 4.NOT USED 5.BUILDING ROOF DRAIN. SEE CIVIL SITE DRAINAGE PLAN. 6.PARAPET ROOF LADDER. SEE A6/A3.0. 32 1 1 23 1 2323 111 5 5 +96'-0" FINISH GRADE +100'-0" FINISH FLOOR 6 1 1 PL A N R E V I E W C O M M E N T S 04 . 1 0 . 2 0 1 7 2 OW N E R R E V I S I O N S 05 . 1 2 . 2 0 1 7 2 2 2 2 2