Loading...
ElevationsMAIN FLOOR 100' - 0" T.O. PLATE 110' - 9" B.O. FOUNDATION 98' - 0" B.O. FOOTING 97' - 0" BASEMENT 90' - 0" B.O. BASE FOOTING 88' - 6" TOP OF ROOF 130' - 5 1/2" 1 T2 4 33 T6 T6 T3 S1 4 T1 E A B B D B B A E T1 T1 T1 2 2 3 T6 6 5 9 10 13 MAIN FLOOR 100' - 0" T.O. PLATE 110' - 9" B.O. FOUNDATION 98' - 0" B.O. FOOTING 97' - 0" TOP OF ROOF 130' - 5 1/2" 1 2 T1 4 5 6 A E T2 BB A 44 33 T6 T6 T3 S1 T1 T1 3 T6 13 1. ANY DISCREPANCY OR CONFLICT IN THESE DRAWINGS AND SPECIFICATIONS ARE TO BE REPORTED TO BRIGHTON HOMES AND RESOLVED PRIOR TO ACQUISITION OF MATERIALS / COMPONENTS OR CONSTRUCTION RELATED TO THE ITEM(S) IN QUESTION. 2. DO NOT SCALE DRAWINGS 3. THE BUILDER RESERVES THE RIGHT TO ADJUST THE ACTUAL CONSTRUCTION ELEMENTS TO MEET ALL CODE REQUIREMENTS AND SITE CONDITIOINS. BUILDING MATERIALS ARE SUBJECT TO CHANGE WITHOUT PRIOR NOTICE PER THE BUILDERS DISCRETION. 4. ATTIC VENTILATION: PROVIDE MIN. 1 SF / 300 SF OF FREE AREA VENTING w/ ROOF, RIDGE AND/OR GABLE VENTS. 5. TRIM WIDTHS CALLED FOR ARE NOMINAL SIZE. 6. SOFFIT WIDTHS ARE NOMINAL. ACTUAL WIDTHS TO BE 1/4" GREATER THAN CALLOUT. 5' - 0 " 3' - 0" 3' - 0" 3' - 0" 4' - 6" 4' - 6" 2" T2 T3 T4 T5 8 5' - 0 " 3' - 0" 3' - 0" 3' - 0" 3' - 0" 2" T2 T3 T4 T5 8 MAIN FLOOR 100' - 0" 2' - 6" 2' - 6" 5' - 0 " 2' - 8 " 2' - 6" 2' - 6" 2" T2 T3 T4 T5 8 MAIN FLOOR 100' - 0" 2' - 0 " 5' - 8 " 3' - 0" 3' - 0" 2" T2 T3 T3 8 2' - 0" 3' - 0 " T2 2" 7 10' - 9" A B C D E F G H © 2017 STEELE ARCHITECTURE DATE: PROJECT NO: DRAWN BY: DRAWING TITLE: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 J 22 SHEET NO: PROJECT TITLE: SEAL: ARCHITECT: CONTRACTOR: CONSULTANT: 4/ 4 / 2 0 1 7 1 0 : 3 0 : 4 8 P M D: \ 0 1 - S A P R O J E C T S \ 1 7 0 0 3 F H C P a r a m o u n t \ P r e l i m s \ 1 7 0 0 3 -4 . r v t A5 04.04.17 17003 WAS BUILDING ELEVATIONS 1588 W CAYUSE CREEK DR | MERIDIAN, ID 83646 FAMILY HEALTH CARE 3/16" = 1'-0" 2 SOUTH ELEVATION 3/16" = 1'-0" 1 EAST ELEVATION GENERAL NOTES - ELEVATIONS ELEVATION KEYNOTES 1 VENTED BOSTON RIDGE 2 ARCHITECTURAL LAMINATED SHINGLE SYSTEM. CERTAINTEED PRESIDENTIAL TL SERIES - COUNTRY GRAY. 3 BUILT UP, TAPERED STONE COLUMN 4 3-COAT STUCCO SYSTEM WITH ACRYLIC FINISH COAT. COLOR TO MATCH SHERWIN WILLIAMS 'SW6119' ANTIQUE WHITE 5 INSULATED CONCRETE FOUNDATION WALL 6 STONE VENEER. MATCH EXISTING 7 FABRICATED CEDAR LOUVER WITH BUG SCREEN. 8 MILGARD ULTRA SERIES FIBERGLASS WINDOW. COLOR BARK. CRAFTSMAN GRID. MULLED AS SHOWN. GLASS 3/16 SUNCOAT / i89 DUAL (ARGON) U 0.24 | SHGC 0.25 | VT 0.45 9 INSULATED CONCRETE BASEMENT WALL 10 6" ADDRESS LETTERS ON GLASS 11 ELECTRICAL GEAR LOCATION 13 DARK BRONZE ANODIZED ALUMINUM STOREFRONT SYSTEM WTIH WIDE STYLE DOORS. NO. REVISION / SUBMISSIONS DATE TRIM KEYNOTES T1 FASCIA - (3) 2X8 R.S. CEDAR - STAIN T2 2X6 R.S. CEDAR - STAIN T3 2X8 R.S. CEDAR - STAIN T4 4X12 R.S. CEDAR - STAIN T5 6X10 R.S. CEDAR ACCENT CORBLE- STAIN T6 6X12 R.S. CEDAR CAPITAL (8 PCS EA)- STAIN 3/16" = 1'-0" A WINDOW TYPE A 3/16" = 1'-0" B WINDOW TYPE B 3/16" = 1'-0" C WINDOW TYPE C 3/16" = 1'-0" D WINDOW TYPE D 3/16" = 1'-0" E LOUVER 1. ANY DISCREPANCY OR CONFLICT IN THESE DRAWINGS AND SPECIFICATIONS ARE TO BE REPORTED TO BRIGHTON HOMES AND RESOLVED PRIOR TO ACQUISITION OF MATERIALS / COMPONENTS OR CONSTRUCTION RELATED TO THE ITEM(S) IN QUESTION. 2. DO NOT SCALE DRAWINGS 3. THE BUILDER RESERVES THE RIGHT TO ADJUST THE ACTUAL CONSTRUCTION ELEMENTS TO MEET ALL CODE REQUIREMENTS AND SITE CONDITIOINS. BUILDING MATERIALS ARE SUBJECT TO CHANGE WITHOUT PRIOR NOTICE PER THE BUILDERS DISCRETION. 4. ATTIC VENTILATION: PROVIDE MIN. 1 SF / 300 SF OF FREE AREA VENTING w/ ROOF, RIDGE AND/OR GABLE VENTS. 5. TRIM WIDTHS CALLED FOR ARE NOMINAL SIZE. 6. SOFFIT WIDTHS ARE NOMINAL. ACTUAL WIDTHS TO BE 1/4" GREATER THAN CALLOUT. MAIN FLOOR 100' - 0" T.O. PLATE 110' - 9" B.O. FOUNDATION 98' - 0" B.O. FOOTING 97' - 0" BASEMENT 90' - 0" B.O. BASE FOOTING 88' - 6" TOP OF ROOF 130' - 5 1/2" 1 T2 4 T1 T1 T1 2 3 T6 6 5 9 6 D DBDDBB B 13 MAIN FLOOR 100' - 0" T.O. PLATE 110' - 9" B.O. FOUNDATION 98' - 0" B.O. FOOTING 97' - 0" BASEMENT 90' - 0" B.O. BASE FOOTING 88' - 6" TOP OF ROOF 130' - 5 1/2" 1 2 T1 4 9 6 T2 T1 T1 3 T6 E C D B B 9 T1 11 A ROOFING: CERTAINTEED PRESIDENTIAL TL SHAKE 'COUNTRY GRAY' B STUCCO: MATCH SHERWIN WILLIAMS SW6119 'ANTIQUE WHITE' C WOOD TRIM: SHERWIN WILLIAMS SW3518 'HAWTHORNE' EXTERIOR SEMI -TRANSPARENT STAIN D BORAL CULTURED STONE BLEND (75%) COUNTRY LEDGESTONE 'CARAMEL' (TOP IMAGE) (25%) DRESSED FIELDSTONE 'SEVILLA' (BOTTOM IMAGE) E WINDOWS AND STOREFRONT: DARK BRONZE (MILGARD 'BARK') A B C D E F G H © 2017 STEELE ARCHITECTURE DATE: PROJECT NO: DRAWN BY: DRAWING TITLE: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 J 22 SHEET NO: PROJECT TITLE: SEAL: ARCHITECT: CONTRACTOR: CONSULTANT: 4/ 4 / 2 0 1 7 1 0 : 2 9 : 0 4 P M D: \ 0 1 - S A P R O J E C T S \ 1 7 0 0 3 F H C P a r a m o u n t \ P r e l i m s \ 1 7 0 0 3 -4 . r v t A6 04.04.17 17003 WAS BUILDING ELEVATIONS 1588 W CAYUSE CREEK DR | MERIDIAN, ID 83646 FAMILY HEALTH CARE ELEVATION KEYNOTES 1 VENTED BOSTON RIDGE 2 ARCHITECTURAL LAMINATED SHINGLE SYSTEM. CERTAINTEED PRESIDENTIAL TL SERIES - COUNTRY GRAY. 3 BUILT UP, TAPERED STONE COLUMN 4 3-COAT STUCCO SYSTEM WITH ACRYLIC FINISH COAT. COLOR TO MATCH SHERWIN WILLIAMS 'SW6119' ANTIQUE WHITE 5 INSULATED CONCRETE FOUNDATION WALL 6 STONE VENEER. MATCH EXISTING 7 FABRICATED CEDAR LOUVER WITH BUG SCREEN. 8 MILGARD ULTRA SERIES FIBERGLASS WINDOW. COLOR BARK. CRAFTSMAN GRID. MULLED AS SHOWN. GLASS 3/16 SUNCOAT / i89 DUAL (ARGON) U 0.24 | SHGC 0.25 | VT 0.45 9 INSULATED CONCRETE BASEMENT WALL 10 6" ADDRESS LETTERS ON GLASS 11 ELECTRICAL GEAR LOCATION 13 DARK BRONZE ANODIZED ALUMINUM STOREFRONT SYSTEM WTIH WIDE STYLE DOORS. GENERAL NOTES - ELEVATIONS 3/16" = 1'-0" 4 NORTH ELEVATION 3/16" = 1'-0" 3 WEST ELEVATION NO. REVISION / SUBMISSIONS DATE TRIM KEYNOTES T1 FASCIA - (3) 2X8 R.S. CEDAR - STAIN T2 2X6 R.S. CEDAR - STAIN T3 2X8 R.S. CEDAR - STAIN T4 4X12 R.S. CEDAR - STAIN T5 6X10 R.S. CEDAR ACCENT CORBLE- STAIN T6 6X12 R.S. CEDAR CAPITAL (8 PCS EA)- STAIN EXTERIOR FINISHES