Loading...
A-2017-0042 CapEd CZC DESConditions Document 1 CapEd at Southern Springs - CZC, DES - A-2017-0042 CERTIFICATE OF ZONING COMPLIANCE REPORT DATE: April 7, 2017 TO: Mike Hill, CapEd Federal Credit Union FROM: Erika Akin, Assistant City Planner SUBJECT: CapEd at Southern Springs - CZC, DES (A-2017-0042) Capital Educators Federal Credit Union OWNER: DESCRIPTION OF APPLICANT'S REQUEST The applicant, Mike Hill, requests Certificate of Zoning Compliance (CZC) and Desi gn Review (DES) approval of new construction of an approximately 2,860 square foot building, site improvements, ATM drive through and landscaping on a corner lot in Southern Springs No 2 Subdivision. The use, Financial Institution, is a principally permitted use in the zoning district. The site is zoned C-G, currently vacant and 1.19 acres. The site is located at 1650 S. Meridian. DECISION The applicant's request for Certificate of Zoning Compliance and Design Review is approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. General Conditions of Approval 1. From Public Works Engineering: A street light plan will need to be included in the building permit application. Street light plan requirements are listed in section 6-7 of the City's Design Standards. A copy of the standards can be found at http://www.meridiancity.org/public_works.aspx?id=272 A Type 1 street light will be required along Meridian Road. Existing Idaho Power lines are along this frontage so either a Davit pole will be needed or coordination with Idaho Power to place a light on their power pole on the SW corner of the parcel. Preferred mounting height is 35 feet on a 15 foot mast arm. Site Conditions of Approval 1. The applicant shall construct all proposed fencing and/or any fencing required by the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B. 2. Business hours of operation within the C-C and C-G districts shall be limited from 6 am to 11 pm when the property abuts a residential use or district as set forth in UDC 11-2B- 3A4. Conditions Document 2 CapEd at Southern Springs - CZC, DES - A-2017-0042 Process Conditions of Approval 1. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 3. Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC 11 - 3B-14A. 4. The site plan prepared by Schlicter | Ugrin on February 22, 2017, labeled A1.11, is approved by the City of Meridian Planning Division as shown in Exhibit B. 5. The landscape plan prepared by Stack Rock on January 23, 2017, labeled L1.2, is approved by the City of Meridian Planning Division as shown in Exhibit C. 6. The elevations prepared by Schlicter | Ugrin on February 22, 2017, labeled A3.01 are approved by the City of Meridian Planning Division as shown in Exhibit D. 7. The approved site plan, landscape plan and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 8. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 9. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. 10. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. Ongoing Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The applicant shall comply with the outdoor storage as an accessory use standards as set forth in UDC 11-3A-14. 3. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site. 4. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 5. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 6. The applicant shall have an ongoing obligation to maintain all pathways. 7. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 8. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. 9. The applicant and/or assigns shall have the continuing obligation to meet the specific use standards for the proposed use as set forth in UDC 11-4-3-17 Financial Institution. Conditions Document 3 CapEd at Southern Springs - CZC, DES - A-2017-0042 CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before April 24, 2017, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. EXPIRATION The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until April 7, 2017. EXHIBITS A: Vicinity Map B: Site Plan (dated: February 22, 2017) C: Landscape Plan (dated: January 23, 2017) D: Elevations (dated: February 22, 2017) Conditions Document 4 CapEd at Southern Springs - CZC, DES - A-2017-0042 Exhibit A: Vicinity Map Conditions Document 5 CapEd at Southern Springs - CZC, DES - A-2017-0042 Exhibit B: Site Plan (dated: February 22, 2017) Conditions Document 6 CapEd at Southern Springs - CZC, DES - A-2017-0042 Exhibit C: Landscape Plan (dated: January 23, 2017) Conditions Document 7 CapEd at Southern Springs - CZC, DES - A-2017-0042 Exhibit D: Elevations (dated: February 22, 2017) Conditions Document 8 CapEd at Southern Springs - CZC, DES - A-2017-0042