Ada County Dispatch Center Driveway Modification
CERTIFICATE OF ZONING COMPLIANCE
REPORT
DATE:
January 19, 2017
TO:
Bruce Krisko, Ada County
FROM:
Bill Parsons, Planning Supervisor
SUBJECT:
Ada County
Dispatch Center Driveway Modification – A-2017-0009
OWNER:
Ada County
DESCRIPTION OF APPLICANT'S REQUEST
The applicant, Bruce Krisko,
requests Certificate of Zoning Compliance (CZC) approval to modify the northern driveway approved with the construction of the Ada County Dispatch Center (CZC-15-037). The scope of work
includes a wider approach onto Stonehenge Drive; the addition of a concrete median for traffic separation between the ingress/egress drive aisles; and the removal and relocation of existing
landscaping and sidewalk.
The site is located at 963 E. Pine Avenue.
DECISION
The applicant's request for Certificate of Zoning Compliance is approved with the conditions listed in
this report.
Note: This is not a building permit. You must complete this process before you commence the use or any construction. Please contact Building Services at (208) 887-2211
to verify the building permit and/or inspection requirements.
Site Conditions of Approval
The applicant shall construct all proposed fencing and/or any fencing required by
the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B.
Process Conditions of Approval
No signs are approved with this application. Prior to installing
any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs.
The applicant
shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC
11-5C-3C.
Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC
11-3B-14A.
The site plan prepared by CTA Architects, dated April 28 September 9, 2015, labeled L101 is approved on May 29 September 10, 2015 by the City of Meridian Planning Division
as shown in Exhibit B with the following comments:
A portion of the fencing visible from S. Stonehenge Way, in front of the communication tower, shall be constructed as decorative wrought
iron fencing as approved with the CUP Findings. Currently, the civil plan, sheet C101, depicts it will be the wrought iron fencing and the architectural site plan, sheet L101, depicts
black vinyl coated chainlink (L101) (See Exhibit B).
The gravel area depicted on the submitted site plan is not approved for parking until it is approved in accord with UDC Table 11-3C-5
and UDC 11-3B-8C with a subsequent CZC application.
The landscape plan prepared by, CTA Architects, dated April 27 September 10, 2015, labeled L301 and L302 are approved on May 29 September
10, 2015 by the City of Meridian Planning Division as shown in Exhibit C with the following comments:
Per UDC 11-3B-10, the applicant shall work with the City Arborist, Elroy Huff, on
designing, adopting, and implementing a protection and mitigation plan for the existing trees on site that may be removed.
The existing landscaping near the construction must remain
protected during construction.
Add seven (7) 2-inch caliper trees to the parking area as shown in Exhibit C.
The approved site plan, landscape plan and/or elevations may not be altered
without prior written approval of the City of Meridian Planning Division.
The elevations prepared by CTA Architects, dated March 20, 2015, labeled A201 is approved on May 29, 2015 by
the City of Meridian Planning Division as shown in Exhibit D.
The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
If any changes must be made
to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building
permit.
The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building
Official has issued a Certificate of Occupancy.
Per the approved CUP Findings, the applicant shall grant a cross access easement in favor of the property to the east (Parcel #S1107417301).
A copy of the recorded cross access agreement shall be submitted with the CZC application. The agreement has not been finalized because the City’s Legal Department has been coordinating
on the language contained in the agreement. A draft copy of the legal description and exhibit has been submitted to the Planning Division for review. Prior to Certificate of Occupancy,
the applicant shall record said easement to adjoining property to the east (Parcel #S1107417301) and submit a copy to the Planning Division in accord with the provisions of UDC 11-3A-3A2.
Further, the applicant has not provided a recorded cross access for the property located on the west side of N. Stonehenge Way because access has been granted via a note recorded with
the Weed and Pest Control Campus Subdivision.
The City of Meridian requires that the owner enter into a Warranty Surety Agreement and post a Warranty Surety in the amount of 20% of
the total construction cost for all completed public sewer and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing
provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond, and must be in place prior to Certificate of Occupancy.
Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Services for more information at 208-887-2211.
Ongoing Conditions of Approval
The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to
install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14.
The applicant shall comply with the outdoor storage as an accessory use standards as
set forth in UDC 11-3A-14.
The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (CUP-14-018).
The issuance
of this CZC does not release the applicant from any previous requirements of the other permits issued for the site.
The applicant and/or property owner shall have an ongoing obligation
to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area.
The applicant has a continuing obligation to comply
with the outdoor lighting provisions as set forth in UDC 11-3A-11.
The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features
within the clear vision triangle consistent with the standards in UDC 11-3A-3.
The applicant and/or assigns shall have the continuing obligation to meet the specific use standards for
the proposed uses as set forth in UDC 11-4-3-30 and UDC 11-4-3-43.
CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of
the Director. All requests for review shall be filed in writing with the Planning Division on or before June 12 September 25, 2015, within fifteen (15) days after the written decision
is issued, and contain the information listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a final decision on a land
use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003.
EXPIRATION
Certificates of Zoning Compliance issued in conjunction with a proposed
use shall expire if the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance.
Certificates of Zoning Compliance issued in conjunction
with construction or alteration of a structure shall expire if the construction or alteration has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance.
In
accord with the above provisions, the subject Certificate of Zoning Compliance is valid until May 29 September 10, 2016.
EXHIBITS
Vicinity Map
Site Plan (dated: April 28, 09/09/15)
Landscap
e Plan (dated: April 27, 09/09/15)
Elevations (dated: March 20, 2015)
CERTIFICATE OF ZONING COMPLIANCE
REPORT
DATE:
January 19, 2017
TO:
Bruce Krisko, Ada County
FROM:
Bill Parsons, Planning Supervisor
SUBJECT:
Ada County
Dispatch Center Driveway Modification – A-2017-0009
OWNER:
Ada County
DESCRIPTION OF APPLICANT'S REQUEST
The applicant, Bruce Krisko,
requests Certificate of Zoning Compliance (CZC) approval to modify the northern driveway approved with the construction of the Ada County Dispatch Center (CZC-15-037). The scope of work
includes a wider approach onto Stonehenge Drive; the addition of a concrete median for traffic separation between the ingress/egress drive aisles; and the removal and relocation of existing
landscaping and sidewalk.
The site is located at 963 E. Pine Avenue.
DECISION
The applicant's request for Certificate of Zoning Compliance is approved with the conditions listed in
this report.
Note: This is not a building permit. You must complete this process before you commence the use or any construction. Please contact Building Services at (208) 887-2211
to verify the building permit and/or inspection requirements.
Site Conditions of Approval
The applicant shall construct all proposed fencing and/or any fencing required by
the UDC, consistent with the standards as set forth in UDC 11-3A-7 and 11-3A-6B.
Process Conditions of Approval
No signs are approved with this application. Prior to installing
any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs.
The applicant
shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC
11-5C-3C.
Upon installation of the landscaping and prior to inspection by Planning Division staff, the applicant shall provide a written certificate of completion as set forth in UDC
11-3B-14A.
The site plan prepared by CTA Architects, dated April 28 September 9, 2015, labeled L101 is approved on May 29 September 10, 2015 by the City of Meridian Planning Division
as shown in Exhibit B with the following comments:
A portion of the fencing visible from S. Stonehenge Way, in front of the communication tower, shall be constructed as decorative wrought
iron fencing as approved with the CUP Findings. Currently, the civil plan, sheet C101, depicts it will be the wrought iron fencing and the architectural site plan, sheet L101, depicts
black vinyl coated chainlink (L101) (See Exhibit B).
The gravel area depicted on the submitted site plan is not approved for parking until it is approved in accord with UDC Table 11-3C-5
and UDC 11-3B-8C with a subsequent CZC application.
The landscape plan prepared by, CTA Architects, dated April 27 September 10, 2015, labeled L301 and L302 are approved on May 29 September
10, 2015 by the City of Meridian Planning Division as shown in Exhibit C with the following comments:
Per UDC 11-3B-10, the applicant shall work with the City Arborist, Elroy Huff, on
designing, adopting, and implementing a protection and mitigation plan for the existing trees on site that may be removed.
The existing landscaping near the construction must remain
protected during construction.
Add seven (7) 2-inch caliper trees to the parking area as shown in Exhibit C.
The approved site plan, landscape plan and/or elevations may not be altered
without prior written approval of the City of Meridian Planning Division.
The elevations prepared by CTA Architects, dated March 20, 2015, labeled A201 is approved on May 29, 2015 by
the City of Meridian Planning Division as shown in Exhibit D.
The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
If any changes must be made
to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building
permit.
The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building
Official has issued a Certificate of Occupancy.
Per the approved CUP Findings, the applicant shall grant a cross access easement in favor of the property to the east (Parcel #S1107417301).
A copy of the recorded cross access agreement shall be submitted with the CZC application. The agreement has not been finalized because the City’s Legal Department has been coordinating
on the language contained in the agreement. A draft copy of the legal description and exhibit has been submitted to the Planning Division for review. Prior to Certificate of Occupancy,
the applicant shall record said easement to adjoining property to the east (Parcel #S1107417301) and submit a copy to the Planning Division in accord with the provisions of UDC 11-3A-3A2.
Further, the applicant has not provided a recorded cross access for the property located on the west side of N. Stonehenge Way because access has been granted via a note recorded with
the Weed and Pest Control Campus Subdivision.
The City of Meridian requires that the owner enter into a Warranty Surety Agreement and post a Warranty Surety in the amount of 20% of
the total construction cost for all completed public sewer and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing
provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond, and must be in place prior to Certificate of Occupancy.
Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Services for more information at 208-887-2211.
Ongoing Conditions of Approval
The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to
install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14.
The applicant shall comply with the outdoor storage as an accessory use standards as
set forth in UDC 11-3A-14.
The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (CUP-14-018).
The issuance
of this CZC does not release the applicant from any previous requirements of the other permits issued for the site.
The applicant and/or property owner shall have an ongoing obligation
to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area.
The applicant has a continuing obligation to comply
with the outdoor lighting provisions as set forth in UDC 11-3A-11.
The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features
within the clear vision triangle consistent with the standards in UDC 11-3A-3.
The applicant and/or assigns shall have the continuing obligation to meet the specific use standards for
the proposed uses as set forth in UDC 11-4-3-30 and UDC 11-4-3-43.
CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of
the Director. All requests for review shall be filed in writing with the Planning Division on or before June 12 September 25, 2015, within fifteen (15) days after the written decision
is issued, and contain the information listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a final decision on a land
use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003.
EXPIRATION
Certificates of Zoning Compliance issued in conjunction with a proposed
use shall expire if the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance.
Certificates of Zoning Compliance issued in conjunction
with construction or alteration of a structure shall expire if the construction or alteration has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance.
In
accord with the above provisions, the subject Certificate of Zoning Compliance is valid until May 29 September 10, 2016.
EXHIBITS
Vicinity Map
Site Plan (dated: April 28, 09/09/15)
Landscap
e Plan (dated: April 27, 09/09/15)
Elevations (dated: March 20, 2015)
A. Vicinity Map
B. Site Plan (dated: March 28, 09/09/15)
C. Landscape Plan (dated: April 28 09/09/15)
D. Elevations (dated: March 20, 2015)