Loading...
CC - Drainage CalculationsDRAINAGE CALCULATIONS FOR The Oaksubo ivion City of Meridian Ada County, Idaho 3 -Nov -2016 fJmUmB J -U -B ENGINEERS, INC. 250 S. Beechwood Drive, #201 Boise, Idaho 83709 208-376-7330 PROJECT NO. 10-16-114 The Oaks Subidivions No. 5 SITE OVERVIEW The Oaks Subdivision No. 5 is located at the southwest corner of W. McMillan Road and N. Rustic Oak Way in Meridian, Idaho. The proposed development consists of 51 single family residential lots located on approximately 13.2 acres. EXISTING DRAINAGE The existing project site presently consists of a vacant agricultural field. The site is bounded by developed single family residential properties to the east, and agricultural land to the north, west, and south. The ground slopes gently from northeast to southwest at grades generally less than 2%. DRAINAGE DESIGN CONCEPT The proposed stormwater improvements include the installation of roadways, pipe networks, stormwater treatment systems, and storage facilities. The surface flow will be directed to and contained within the road sections to designed low points where inlets will capture the stormwater and convey it through a pipe network to a discharge location. A treatment system will be installed for each pipe network prior to allowing the stormwater to be be discharged to the storage facility. The site was divided into catchment areas based on the inlet locations. Each catchement area was analyzed for the 25 -year flow rate for conveyance, the water quality event for treatment and the 100 -year runoff for storage. CALCULATION METHODS Calcualtions were prepared in accordance with the current edition of the Ada County Highway District Stormwater Policy Manual using the rational method (Q=CIA). The catchment areas are shown on the Drainage Catchment Plan. The average rainfall intensity is estimated from the "Rainfall Intensity -Duration -Frequency Relationship" figure for each storm event noted. The time of concentration is determined using the TR -55 method and combines the longest overland grass flow time to gutter flow time. Calculations and spreadsheets are included with this report for all catchment areas. Based upon the preliminary soils and subsurface investigation provided in the soils report for this subdivision, the existing soils will accept the runoff. However, in the event that during construction the contractor encounters either groundwater or rock, a revised design will be done based upon field conditions. \\boisefiles\public\Projects\JUB\10-16-114 Oaks Phase 5\Drainage\Oaks 5 Drainage.xlsx 7 d (Q 4 r Cl d N Q U O S O O m_ m M E a E > O m m o a �am`�m > m C 0 ci O a N m co 3 S 0UO `" O y r N N m m a V I I; I y O O W N U O O O O > > U.a.h.I O W V g y R m m n m of 0 n aG z0m� O °��'� nn EL m w C vN� Q o�j m d �mm r o 1' OyC N N N (V Q_m�do v —`�c�rF OOUIIQ L me oc� N - C O p O O O U Lq w Lq Lq 00 .0 U C 0 0 LL N N G J ¢ NII LO _i N �i o o a c F N H 00 F' EN hvLci Y N N CJ N 0 t `c Y m o 3 o > d O yLL C O J O¢ m F O J dm d r T m m m a` 00 r N ¢ ¢ 3 ¢ aE F F Basin A Contributing Catchment Areas: Required Water Quality Volume: Required Water Quality Flow Rate: Required Storage Volume: Seepage Bed 3,019 fte 1.39 cfs 7,413 its PROJECT NO, 10-16-114 The Oaks Subidivions No. 5 Volume Calculations Box Volume = Storage Duration Depth = 4 ft 46 in ()Wo = 1.39 ft'/sec Length = 185 ft Infiltration Area = 740 fe Width = 26 ft Infiltration Rate = 0.93 in./hr Void Ratio = 40 % Trench Infiltration = 57 ft3/hr Trench Volume = 7,696 ft3 Time for 90% Percolation = 47.38 hr Sand and Grease Trao Calculations \\boisefiles\public\Projeef5\fUB\10-16-114 Oaks Phase 5\Drainage\Oaks 5 Drainage.xlsx Page 4 of 6 Box Volume = 1000 gallon Interior Box Width = 46 in ()Wo = 1.39 ft'/sec Baffle Separation = 20 in Throat Velocity = 0.21 ft/sec Number of Boxes = 1 Throat Area = 6.67 ftz Throat Velocity must be < 0.50 ft/sec \\boisefiles\public\Projeef5\fUB\10-16-114 Oaks Phase 5\Drainage\Oaks 5 Drainage.xlsx Page 4 of 6 Temp Basins Contributing Catchment Areas: Required Water Quality Volume: Required Water Quality Flow Rate: Required Storage Volume: Storm Pond Temp 1,475 ft' 0.41 cfs 4,164 ft' PROJECT NO. 10-16-114 The Oaks Subidivions No. 5 Volume Calculations Storage Duration Forebay Bottom Area = 357 ft Infiltration Area = 1,462 ftp Primary Basin Bottom Area = 1105 ft Infiltration Rate = 8 in./hr Trench Infiltration = 975 ft3/hr Time for 90% Percolation = 3.85 hr Contributing Catchment Areas: Required Water Quality Volume: Required Water Quality Flow Rate: Required Storage Volume: Storm Pond Temp 783 ft' 0.22 cfs 2,212 ft' Volume Calculations Storage Duration Forebay Bottom Area = 166 ft Infiltration Area = 480 fe Primary Basin Bottom Area = 314 ft Infiltration Rate = 8 in./hr Trench Infiltration = 320 ft3/hr Time for 90% Percolation = 6.22 hr \\boisefiles\public\ProjeasWUB\10-16-114 Oaks Phase 5\Drainage\Oaks 5 Drainage.xlsx Page 5 of 6 Boise Area Intensity -Duration -Frequency NOAA Atlas 2 Intensity Duration Frequency 3.5 T 0.5 -------- 0 10 min 15 min 30 min 1 hour 2 hours 3 hours 6 hours 12 hours 24 hours Duration in minutes and hours Intensity (inches per hour) Design Storm 2 5 10 25 50 100 Tc_---------------- __________ 0.17 10 min 0.69 1.15 1.45 1.85 2.20 2.58 0.25 15 min 0.59 0.97 1.22 1.56 1.86 2.18 0.33 20 min 0.49 0.81 1.01 1.30 1.54 1.81 0.42 25 min 0.43 0.71 0.89 1.14 1.35 1.58 0.50 30 min 0.41 0.67 0.85 1.08 1.29 1.51 0.58 35 min 0.34 0.56 0.70 0.90 1.07 1.25 0.67 40 min 0.31 0.51 0.64 0.82 0.98 1.15 0.75 45 min 0.29 0.48 0.60 0.77 0.91 1.07 0.83 50 min 0.27 0.45 0.56 0.72 0.85 1.00 0.92 55 min 0.26 0.43 0.54 0.69 0.82 0.96 1.00 1 hour 0.26 0.43 0.54 0.69 0.82 0.96 2.00 2 hours 0.16 0.25 0.31 0.39 0.46 0.54 3.00 3 hours 0.13 0.19 0.23 0.29 0.34 0.40 6.00 6 hours 0.09 0.12 0.14 0.18 0.21 0.25 12.00 12 hours 0.06 0.08 0.10 0.12 0.14 0.16 24.00 24 hours 0.04 0.06 0.06 0.08 0.09 0.10 NOAA Atlas 2 Intensity Duration Frequency 3.5 T 0.5 -------- 0 10 min 15 min 30 min 1 hour 2 hours 3 hours 6 hours 12 hours 24 hours Duration in minutes and hours -.------T ----T- -- EP - - -- EP - - _ zP- _�_ -JIL1J �-- — — — llr / e/v- !II � Il�ll II I II I I II SII I I I I I I I oil Temporary II SII I , II zll I - - EP - - - - \\ THE OAKS SUBDIVISION NC Meridian, Idaho DRAINAGE CATCHMENT PLAN 0 150 3p0 0 =° SCALE IN FEET — es eo �Jma s 1 -U -B ENGINEERS, INC. THE OAKS SUBDIVISION NC Meridian, Idaho DRAINAGE CATCHMENT PLAN