Loading...
Village at Meridian C-100 -DES A-2016-0364Conditions Document 1 Village at Meridian C-100 - DES - A-2016-0364 CERTIFICATE OF ZONING COMPLIANCE REPORT DATE: December 15, 2016 TO: CenterCal Properties, LLC FROM: Sonya Allen, Associate City Planner SUBJECT: Village at Meridian C-100 - DES (A-2016-0364) OWNER: CenterCal Properties, LLC DESCRIPTION OF APPLICANT'S REQUEST The applicant, CenterCal Properties, LLC, requests Design Review (DES) approval of store front upgrades to the existing building façade. The site is located at 3424 E. Longwing Lane Ste 100 and is in the C-G zoning district. DECISION The applicant's request for Design Review is approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. General Conditions of Approval 1. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer’s expense. Final design shall be submitted as part of the development plan set for approval. Applicant shall also include the location of any existing street lights in the development plan set. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor’s work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. Process Conditions of Approval 1. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 3. The elevations prepared by Lindgren:Labrie Architecture on November 30, 2016, labeled Sheet DR-2, are approved by the City of Meridian Planning Division as shown in Exhibit B. 4. The approved elevations may not be altered without prior written approval of the City of Meridian Planning Division. 5. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. Conditions Document 2 Village at Meridian C-100 - DES - A-2016-0364 6. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. Ongoing Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The subject property adjoins a state highway; access to the state facility is restricted as set forth in UDC 11-3H-4B. 3. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (CZC-12-082; DES-12-049). 4. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 5. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 6. The applicant shall have an ongoing obligation to maintain all pathways. 7. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 8. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before December 30, 2016, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. EXPIRATION The Certificate of Zoning Compliance shall expire if the construction, alteration or the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until December 15, 2017. EXHIBITS A: Vicinity Map B: Elevations (dated: November 30, 2016) Conditions Document 3 Village at Meridian C-100 - DES - A-2016-0364 Exhibit A: Vicinity Map Conditions Document 4 Village at Meridian C-100 - DES - A-2016-0364 Exhibit B: Elevations (dated: November 30, 2016)