Loading...
CC - Certificate of Landscape Completion495 Main Street (Belgravia), Boise, Idaho 83702 Ph. (208) 343-7175 Fax (208) 343-7178 email jba@jensenbelts.com Date: October 10, 2016 To: Sonya Watters City of Meridian From: Josh Neill Re: Decatur Estates Phase 1 Certificate of Landscape Completion I have reviewed the installation and completion of the landscape for Decatur Estates Phase 1. An As- Built Landscape Plan set has been submitted to accurately depict the landscape as installed. The following are my findings for the Certificate of Completion for the City of Meridian.  Overall the landscape appears to be well done, however altered from the original submitted plans (Final Plat Landscape Plans dated 02/25/2016 - License Agreement). An As-Built Landscape Plan set has been submitted to accurately depict the landscape as installed.  There are (3) Honeylocusts along N. Linder Rd. that are struggling from transplant shock but appear to be recovering. Trees are to be monitored through next year and replaced if not fully recovers after one year warranty period.  Perimeter and common lot fencing has been installed per plans except for wrought iron fencing behind lots 2-5 on block 6 and the side yard fencing on the west side of N. Marche Ave. and N. Penngrove Way due to construction access to adjacent lot. These fencing areas are to be installed this week.  The irrigation system was not inspected however the shrub and lawn areas appear to be receiving adequate water.  Trees and lawn in front of home lots are to be installed during home construction per Landscape Note #6 on the Final Plat Landscape Plans As-Builts. Respectfully submitted, JENSEN BELTS ASSOCIATES, PLLC Joshua J. Neill, PLA Copies: Amyx Homes Engineering Solutions