Vicenza Sub. No. 3 FP H-2016-0096
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR VICENZA SUBDIVISION No. 3 (H-2016-0096)
Page 1 of 3
BEFORE THE MERIDIAN CITY COUNCIL
HEARING DATE: SEPTEMBER 6, 2016
IN THE MATTER OF THE
REQUEST FOR FINAL PLAT
CONSISTING OF 28 RESIDENTIAL
LOTS AND 4 COMMON LOTS ON
10.62 ACRES OF LAND IN THE R-4
ZONING DISTRICT FOR VICENZA
SUBDIVISION NO. 3.
BY: COTTONWOOD
INVESTMENTS, LLC
APPLICANT
)
)
)
)
)
)
)
)
)
)
)
)
)
CASE NO. H-2016-0096
ORDER OF CONDITIONAL
APPROVAL OF FINAL PLAT
This matter coming before the City Council on September 6, 2016 for final plat approval
pursuant to Unified Development Code (UDC) 11-6B-3 and the Council finding that the
Administrative Review is complete by the Planning and Development Services Divisions of the
Community Development Department, to the Mayor and Council, and the Council having
considered the requirements of the preliminary plat, the Council takes the following action:
IT IS HEREBY ORDERED THAT:
1. The Final Plat of “PLAT SHOWING VICENZA SUBDIVISION NO. 3,
LOCATED IN THE N ½ OF THE S ½ OF SECTION 27, T.4N., R.1W, B.M.,
MERIDIAN, ADA COUNTY, IDAHO, 2016, TRAVIS P. FOSTER, PLS,
SHEET 1 OF 3,” is approved subject to those conditions in the staff report to the
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR VICENZA SUBDIVISION No. 3 (H-2016-0096)
Page 2 of 3
Mayor and City Council from the Planning and the Development Services
Divisions of the Community Development Department dated September 6, 2016,
a true and correct copy of which is attached hereto marked “Exhibit A” and by
this reference incorporated herein, and the response letter from Cara Duskey, a
true and correct copy of which is attached hereto marked “Exhibit B” and by this
reference incorporated herein.
2. The final plat upon which there is contained the certification and signature of the
City Clerk and the City Engineer verifying that the plat meets the City’s
requirements shall be signed only at such time as:
2.1 The plat dimensions are approved by the City Engineer; and
2.2 The City Engineer has verified that all off-site improvements are
completed and/or the appropriate letter of credit or cash surety has been
issued guaranteeing the completion of off-site and required on-site
improvements.
NOTICE OF FINAL ACTION
AND RIGHT TO REGULATORY TAKINGS ANALYSIS
The Applicant is hereby notified that pursuant to Idaho Code § 67-8003, the Owner may
request a regulatory taking analysis. Such request must be in writing, and must be filed with the
City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at
issue. A request for a regulatory takings analysis will toll the time period within which a Petition
for Judicial Review may be filed.
Please take notice that this is a final action of the governing body of the City of
Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an
interest in real property which may be adversely affected by this decision may, within twenty-
eight (28) days after the date of this decision and order, seek a judicial review pursuant to Idaho
Code§ 67-52.
By action of the City Council at its regular meeting held on the
WON O•s �
1 �
By:
Tammy d erd
Q0 ATE IA, r, of Meridian
Attest: G
2
CI of O�
-4 E IDjAN .
C. ay Col
City Clerk 0 - SEAL
day of
Copy served upon the Applicant, Planning Division, Public Works Department, and City
Attorney.
Dated: I Ja l L
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR VICENZA SUBDIVISION No. 3 (H-2016-0096)
Page 3 of 3
Exhibit A
Vicenza No. 3 – H-2016-0096 PAGE 1
STAFF REPORT
Hearing Date: September 6, 2016
TO: Mayor and City Council
FROM: Josh Beach, Associate Planner
208-884-5533
Bruce Freckleton, Development Services Manager
208-887-2211
SUBJECT: Vicenza No. 3 – H-2016-0096
I. APPLICATION SUMMARY
The applicant, Cottonwood Investments, LLC, has applied for approval of a final plat consisting of
twenty-eight (28) buildable lots and four (4) common lots on approximately 10.62 acres of land.
II. STAFF RECOMMENDATION
Staff recommends approval of Vicenza Subdivision No. 3 final plat (FP) application subject to the
conditions noted below. These conditions shall be considered in full, unless expressly modified or deleted
by motion of the City Council.
III. PROPOSED MOTION
Approval
I move to approve File Number H-2016-0096 as presented in the staff report for the hearing date of
September 6, 2016, with the following modifications: (Add any proposed modifications.)
Denial
I move to deny File Number H-2016-0096 as presented during the hearing on September 6, 2016, for
the following reasons: (You should state specific reasons for denial.)
Continuance
I move to continue File Number H-2016-0096 to the hearing date of (insert continued hearing date
here) for the following reason(s): (You should state specific reason(s) for continuance.)
IV. APPLICATION AND PROPERTY FACTS
A. Site Address/Location:
The site is located on the north of W. McMillan Road between N. Black Cat Road and N. Ten
Mile Road in the S ½ of Section 27, Township 4 North, Range 1 West.
B. Applicant/Owner:
Cottonwood Investments, LLC
2228 Piazza Drive, Suite #150
Meridian, Idaho 83646
C. Representative:
Matt Munger, WH Pacific
3130 S. Owyhee Street
Boise, Idaho 83705
Exhibit A
Vicenza No. 3 – H-2016-0096 PAGE 2
V. STAFF ANALYSIS
The proposed final plat consists of twenty-eight (28) buildable lots and four (4) common lots on
approximately 10.62 acres of land. This is the third phase of development for the Volterra North
Subdivision.
Open space planned for this phase consists of parkways and two pedestrian pathways. The proposed open
space and site amenities comply with the overall open space and site amenities approved with the Volterra
North development.
Because the number of buildable lots is the same and the common open space is the same, staff finds the
proposed plat to be in substantial compliance with the approved preliminary plat as required by UDC11-
6B-3C.2.
VI. SITE SPECIFIC CONDITIONS
1. Applicant shall meet all terms of the approved preliminary plat (PP-10-004), time extension
(TED-12-002), final plat (FP-13-033) and amended development agreement (instrument
#111010393).
2. The applicant has until June 8, 2018 to obtain City Engineer’s signature on the final plat or apply
for a time extension in accord with UDC 11-6B-7.
3. Prior to submittal for the City Engineer’s signature, have the Certificate of Owners and the
accompanying acknowledgement signed and notarized.
4. The final plat prepared by WHPacific stamped on July 21, 2016, by Travis P. Foster, shall be
revised prior to signature of the final plat by the City Engineer as follows:
Modify Note #1 to include 5-foot side lot line easements for Public Utility, Drainage, and
Irrigation. Revise the rear lot line easement from 5-foot to 10-foot width.
Modify Note #2 and remove Lot 2, Block 13 and add Lot 3, Block 14 as a common lot to
be owned and maintained by the homeowner’s association.
Note #9: insert the instrument number.
Add the missing lot line between Lots 11 and 12, Block 13.
Add a note indicating that the property is subject to recorded development agreement
instrument #111010393.
5. The landscape plan prepared by South Architecture dated 06/25/14 shall be revised as follows:
Remove Lot 1, Block 13 from the landscape plan as it was included in a previous final plat.
Lot 3, Block 14 shall be landscaped in accord with UDC 11-3G-3E.2.
All fencing installed on the site must be in compliance with UDC 11-3A-6 and 11-3A-7.
Temporary construction fencing to contain debris shall be installed at the subdivision
boundary prior to release of building permits for this subdivision.
All landscape improvements approved with the proposed subdivision must be installed
prior to releasing occupancy for any homes constructed within the subdivision.
Provide two (2) full size copies of landscape plan with the aforementioned changes prior to
obtaining City Engineer’s signature on the final plat.
6. Prior to signature of the final plat by the City Engineer, the applicant shall provide a letter from
the United States Postal Service stating that the applicant has received approval for the location of
mailboxes. Contact the Meridian Postmaster, Kimberly Cutler, at 887-1620 for more information.
Exhibit A
Vicenza No. 3 – H-2016-0096 PAGE 3
7. Staff’s failure to cite specific ordinance provisions or conditions from the preliminary plat does
not relieve the applicant of responsibility for compliance.
8. Prior to the issuance of any new building permits, the property shall be subdivided in accordance
with the UDC.
9. The applicant shall submit a final approval letter from the Street Naming Committee approving
the street names for the proposed subdivision.
10. Applicant shall be required to construct a second water main connection to W. Gondola Drive via
their proposed off-site route in order to provide necessary fire flows to the proposed development.
VII. GENERAL REQUIREMENTS
1. Sanitary sewer service to this development is available via extension of existing mains adjacent to
the development. The applicant shall install mains to and through this subdivision; applicant shall
coordinate main size and routing with the Public Works Department, and execute standard forms
of easements for any mains that are required to provide service. Minimum cover over sewer
mains is three feet, if cover from top of pipe to sub-grade is less than three feet than alternate
materials shall be used in conformance of City of Meridian Public Works Departments Standard
Specifications.
2. Water service to this site is available via extension of existing mains adjacent to the development.
The applicant shall be responsible to install water mains to and through this development,
coordinate main size and routing with Public Works.
3. Street signs are to be in place, sanitary sewer and water system shall be approved and activated,
fencing installed, drainage lots constructed, road base approved by the Ada County Highway
District (ACHD) and the Final Plat for this subdivision shall be recorded, prior to applying for
building permits.
4. Upon installation of the landscaping and prior to inspection by Planning Department staff, the
applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A.
5. A letter of credit or cash surety in the amount of 110% will be required for all incomplete
fencing, landscaping, amenities, pressurized irrigation, prior to signature on the final plat.
6. The City of Meridian requires that the owner post with the City a performance surety in the
amount of 125% of the total construction cost for all incomplete sewer, water infrastructure prior
to final plat signature. This surety will be verified by a line item cost estimate provided by the
owner to the City. The applicant shall be required to enter into a Development Surety Agreement
with the City of Meridian. The surety can be posted in the form of an irrevocable letter of credit,
cash deposit or bond. Please contact Land Development Service for more information at 887 -
2211.
7. The City of Meridian requires that the owner post to the City a warranty surety in the amount of
20% of the total construction cost for all completed sewer, and water infrastructure for a duration
of two years. This surety amount will be verified by a line item final cost invoicing provided by
the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash
deposit or bond. Please contact Land Development Service for more information at 887-2211.
8. All development improvements, including but not limited to sewer, water, fencing, pressurized
irrigation and landscaping shall be installed and approved prior to obtaining certificates of
occupancy, or as otherwise allowed by UDC 11-5C-1.
9. Applicant shall be required to pay Public Works development plan review, and construction
inspection fees, as determined during the plan review process, prior to the issuance of a plan
Exhibit A
Vicenza No. 3 – H-2016-0096 PAGE 4
approval letter.
10. It shall be the responsibility of the applicant to ensure that all development features comp ly with
the Americans with Disabilities Act and the Fair Housing Act.
11. Applicant shall be responsible for application and compliance with any Section 404 Permitting
that may be required by the Army Corps of Engineers.
12. Developer shall coordinate mailbox locations with the Meridian Post Office.
13. All grading of the site shall be performed in conformance with MCC 11-12-3H.
14. Compaction test results shall be submitted to the Meridian Building Department for all building
pads receiving engineered backfill, where footing would sit atop fill material.
15. The engineer shall be required to certify that the street centerline elevations are set a minimum of
3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom
elevation of the crawl spaces of homes is at least 1-foot above.
16. All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways, intersecting,
crossing or laying adjacent and contiguous to the area being subdivided shall be tiled per UDC
11-3A-6. In performing such work, the applicant shall comply with Idaho Code 42-1207 and any
other applicable law or regulation.
17. The applicants design engineer shall be responsible for inspection of all irrigation and/or
drainage facility within this project that do not fall under the jurisdiction of an irrigation district
or ACHD. The design engineer shall provide certification that the facilities have been installed in
accordance with the approved design plans. This certification will be required before a certificate
of occupancy is issued for any structures within the project.
18. At the completion of the project, the applicant shall be responsible to submit record drawings per
the City of Meridian AutoCAD standards. These record drawings must be received and approved
prior to the issuance of a certification of occupancy for any structures within the project.
19. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public
roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights
shall be installed at developer’s expense. Final design shall be submitted as part of the
development plan set for approval, which must include the location of any existing street lights.
Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not
exceed that outlined in the Standards. The contractor’s work and materials shall conform to the
ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. Contact the City of
Meridian Transportation and Utility Coordinator at 898-5500 for information on the locations of
existing street lighting.
20. The applicant shall provide easement(s) for all public water/sewer mains outside of public right of
way (include all water services and hydrants). The easement widths shall be 20-feet wide for a
single utility, or 30-feet wide for two. The easements shall not be dedicated via the plat, but
rather dedicated outside the plat process using the City of Meridian’s standard forms. The
easement shall be graphically depicted on the plat for reference purposes. Submit an executed
easement (on the form available from Public Works), a legal description, which must include the
area of the easement (marked EXHIBIT A) and an 81/2” x 11” map with bearings and di stances
(marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a
Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this
document. All easements must be submitted, reviewed, and approved prior to development plan
approval.
21. Applicant shall be responsible for application and compliance with and NPDES permitting that
Exhibit A
Vicenza No. 3 – H-2016-0096 PAGE 5
may be required by the Environmental Protection Agency.
22. Any existing domestic well system within this project shall be removed from domestic service per
City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Engineering Department at
(208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic
purposes such as landscape irrigation if approved by Idaho Department of Water Resources
Contact Robert B. Whitney at (208)334-2190.
23. Any existing septic systems within this project shall be removed from service per City Ordinance
Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment procedures and
inspections (208)375-5211.
24. The City of Meridian requires that pressurized irrigation systems be supplied by a year -round
source of water (MCC 12-13-8.3). The applicant should be required to use any existing surface or
well water for the primary source. If a surface or well source is not available, a single-point
connection to the culinary water system shall be required. If a single -point connection is utilized,
the developer will be responsible for the payment of assessments for the common areas prior to
development plan approval.
VIII. EXHIBITS
A. Vicinity Map
B. Approved Volterra North Subdivision (PP-10-004)
C. Proposed Final Plat (dated: 07/21/2016)
D. Proposed Landscape Plan (dated: 06/20/2016)
Exhibit A
Vicenza No. 3 – H-2016-0096 PAGE 6
Exhibit A – Vicinity Map
Exhibit A
Vicenza No. 3 – H-2016-0096 PAGE 7
Exhibit B – Approved Volterra North Subdivision (PP-10-004)
Exhibit A
Vicenza No. 3 – H-2016-0096 PAGE 8
Exhibit C – Proposed Final Plat (dated: 07/21/2016)
Exhibit A
Vicenza No. 3 – H-2016-0096 PAGE 9
Exhibit D. – Proposed Landscape Plan (dated: 06/20/16)
Exhibit A
Vicenza No. 3 – H-2016-0096 PAGE 10
WHF&�fic
September 2, 2016
Josh Beach
City of Meridian
33 E. Broadway
Meridian, Idaho 83642
RE: H-2016-0096 — Vicenza No. 3
Dear Josh:
I have received your letter of conditions. I have discussed these conditions with the
owner/applicant and they have agreed to comply with all listed conditions and requirements for
the plat for Vicenza No. 3.
Thank you for your time and consideration on this project. Please do not hesitate to contact Matt
Munger or me if you have any questions.
Sincerely,
LOA. 6�
Cara Duskey
Project Coordinator
2141 West Airport Way, Suite 104 • Boise, ID 83705 • 1 208.342.5400 • F 208.342.5353 • www.whpacific.com