CC - Agency CommentsRON PLATT
OPERATING AGENCY FOR 167,000
CHAIRMAN OF THE BOARD
1�
BOISE PROJECTBOA"OF CONTROL
J
ACRES FOR THE FOLLOWING
a�
IRRIGATION DISTRICTS
RICHARD MURGOITIO
VICE CHAIRMAN OF THE BOARD
(FORMERLY BOISE U.S. RECLAMATION PROJECT)
TIMOTHY M. PAGE
2465 OVERLAND ROAD
PROJECT MANAGER
BOISE, IDAHO 83705-3155
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
ROBERT D. CARTER
WILDER DISTRICT
ASSISTANT PROJECT MANAGER
NEW YORK DISTRICT
BIG BEND DISTRICT
APRYLGARDNER
SECRETARY -TREASURER
JERRIFLOYD
ASSISTANT SECRETARY-
TEL: (208) 344-1141
TREASURER
FAX: (208) 344-1437
19 July 2016
City of Meridian
City Clerk's Office
33 E. Broadway Avenue,
Meridian, Idaho 83642
RE: Oakwood Estates, LLC — Biltmore Subdivision No. 3 File NO. H-2016-0086
S. of W. Victory Rd. & W. of S. Meridian Rd.
Boise- Kuna Irrigation District BK- 88
Tumbler Lateral 30+00
Sec. 25,,T3N, RI.W,,B.M.
Jaycee Jones, Oily Clerk.
TheUnited States' Tumbler Lateral lies within the boundary of the above-mentioned location.
The easement for this lateral is held in the name of the .United States through the Bureau of
Reclamation under the authority of the Act of August 30, 1890.:(26 Stat. 391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert
this federal easement 15 feet Northeast and 15 feet Southwest of the lateral's centerline.
Whereas this area is, for the operation and maintenance of our facility, no activity should hinder
our ability to do so.
The Boise Project does not approve landscaping including trees and/or shrubs (other than grass)
within its easements, as this will certainly increase our cost of maintenance.
Any fencing, as may be required, must be constructed off of any Boise Project Easements.
Parking lots, curbing, light poles, signs, etc, and the ,placing, of asphalt and/or cement over
Project facility easements must be located outside of these, e4sements.
Utilities planning to`cross any project 'facility must do so in accordance with the master 'policies
now held between the. Bureau of Reclamation and most of the utilities. In any case no work shall
take place within the easement before proper crossing agreements have been secured through
both the Bureau of Reclamation and the Boise Project Board of Control.
Storm Drainage and/or Street Runoff must be retained on site.
Local irrigation/drainage ditches that cross this property, in order to serve neighboring
properties, must remain unobstructed and protected by an appropriate easement.
Boise Project is also under the understanding that the Home Owners Association will own and
operate any pump station that is associated with this phase.
This development is subject to Idaho Code 31-3805, in accordance, this office is requesting a
copy of the irrigation and drainage plans.
If you have any further questions or comments regarding this matter, please do not hesitate to
contact me at (208) 344-1141.
Sincer ly,
Thomas Ritthaler
Management / GIS
bdc/bc
cc: Clint McCormick Watermaster, Div; 2 BPBC
Lauren Boehlke Secretary -Treasurer, BKID
File
i & • • • • •
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395
FAX # 208-463-0092
Phones: Area Code 208
July 22, 2016
OFFICE: Nampa 466-7861
SHOP: Nampa 466-0663
33 E Broadway Avenue, Suite 102
Meridian, ID 83642-2619
RE: H2O16-0086FP/ Estates Subdivision No. 3
Dear Jacy:
This project lies within the Boise Kuna and New York Irrigation District. Therefore, Nampa
& Meridian Irrigation District (NMID) has no comment on the above -referenced application.
Please contact Bob Carter, Boise Project- Board of Control for a response, at 208-344-1141,
2465 Overland Rd. Room 202 Boise, ID 83705-3173.
All private laterals and waste ways must be protected. All municipal surface drainage must be
retained on-site. If any surface drainage leaves the site, NMID must review drainage plans.
The Developer must comply with Idaho Code 31-3805.
Sincerely,
Greg G. Curtis
Water Superintendent
Nampa & Meridian Irrigation District
GGC/gnf
PC: Office/File
B. Carter, Board of Control
APPROXIMATE IRRIGABLE ACRES
RIVER FLOW RIGHTS - 23,000
BOISE PROJECT RIGHTS - 40,000
CIO
CENTRALCENTRAL DISTRICT HEALTH DEPARTMENT DISTRICT Return to:
HEALTH Environmental Health Division ❑ ACz
DEPARTMENT
❑ Boise
❑ Eagle
Rezone #— 0CF�'(= ❑ Garden City
Conditional Use # ❑ Kuna
Preliminary / Final / Short Plat_ Omeridian
Cz -3t ❑ Star
❑ 1. We have No Objections to this Proposal.
❑ 2. We recommend Denial of this Proposal.
❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment.
❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
❑ high seasonal ground water ❑ waste flow characteristics
❑ bedrock from original grade ❑ other
❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and
surface waters.
❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
8. After written approval from appropriate entities are submitted, we can approve this proposal for:
W central sewage ❑ community sewage system ❑ community water well
❑ interim sewage 4 central water
❑ individual sewage ❑ individual water
49. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality:
central sewage ❑ community sewage system ❑ community water
sewage dry lines CiPcentral water
❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
❑ 12. We will require plans be submitted for a plan review for any:
❑ food establishment ❑ swimming pools or spas ❑ child care center
❑ beverage establishment ❑ grocery store
I�P13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be
submitted to CDHD.
❑ 14. Reviewed By: \
Date:. /Z� A
Review Sheet
15726-001EH1111
July 26, 2016
Jacey Jones
Meridian City Clerk’s Office
33 East Idaho Avenue
Meridian, Idaho 83642
VIA EMAIL
RE: H-2016-0086 FP BILTMORE ESTATES SUBDIVISION NO. 3
The Idaho Transportation Department (ITD) has reviewed the final plat hearing application referenced above
for Oakwood Estates LLC south of West Victory Road and west of SH-69. ITD has the following
comments:
1. ITD has no objection to construction of residential housing in this location.
2. This property does not abut the State highway system. No access is requested and none is
approved with this application. The project indicates access will be from existing streets.
3. Idaho Code 40-1910 does not allow advertising within the right-of-way of any State highway
system.
4. IDAPA 39.03.60 rules govern advertising along the State highway system. The applicant can
contact Dion Burch at 334-8355 for more information.
If you have any questions, you may contact me at 332-7190.
Sincerely,
Ken Couch
Development Services Coordinator
Ken.Couch@itd.idaho.gov