PZ - Letter by David Hertel to NMID - 7/11E M_ r
ARC.-HF ,
e74.,s.NN9 4 �.
rs,;A
July 11, 2016
Greg Curtis, Water Superintendent
Nampa & Meridian Irrigation District
1503.First Street South
Nampa, ID 83651-4395
Re: H2O16-0064 / Linder Pet Medical Care; 3150 W. Sheryl Drive; Meridian Idaho 83646
Dear Mr. Curtis,
I am writing in response to your letter to Jacy at the City of Meridian, City Clerk's Office, dated June
22, 2016, regarding storm drainage for the subject property.
A Geotechnical Engineering Study was conducted by Materials Testing & Inspection to provide base
information for our civil engineering consultant, Rock Solid Civil, to design the surface drainage
system for this project.
Our civil engineering design provides for all storm drainage to be retained on -site and will have no
impact on the Nampa & Meridian irrigation District (NMID). There will be no surface drainage leaving
the subject property.
spectfully Submitted,
David Hertel
cc: Jacy, City Clerks Office
512 W. Idaho Street Boise, Idaho 83702
ID: 208.720.2848 CA: 925.382.4337 e-mail: david@dhertel.com