Loading...
PILOT RECYCLING PROGRAMPILOT RECYCLING PROGRAM: SETTLERS PARK 1 3245 N. Meridian Road   Proposed Recycling Container Locations (N=20) Playground Baseball/Softball complex Picnic Shelters (3) Concession Stand areas 2 Recycling Containers and Locations Match trash receptacle style Made w/recycled plastic Signage necessary Locate next to a trash receptacle “point of decision” Different Lid than trash receptacle Target plastic and tin beverage containers, paper 24 1/2” steel flat lid with 8”diameter round hold. Color: Black only. Will need signage regarding acceptable materials. Playground 3 Recycling Containers and Locations Picnic Shelters Baseball/Softball Complex 4 Recycling Container Signage 5 Parks Staffing and Collection Equipment Great people, durable equipment! 6 SSC Recycle Bin City Trash Enclosure Recycle bin w/lockable opening. Forfeit one parking space for placement of recycle bin adjacent to City’s trash enclosure. A temporary recycling bin will be placed next to the trash enclosure during high use times. 7 Event Recycling Settlers Park accommodates several popular Events throughout the year. Temporary Recycling Containers placed at suitable Events, could include: Movie Night in Meridian Large Baseball Tournaments to supplement stationary recycling containers Mayor’s Community Block Party 8 PROPOSED BUDGET Permanent Recycling Containers 32 gal Recycling Container (20 x $415) $ 8,300.00 32 gal Plastic Can (20 x $27) $ 540.00 Surface Mounts (10 x $25) $ 250.00 Kraft paper lawn bags + sh (1000 count) $ 680.00 Steel Lid w/8” Hole (20 x $85) $ 1,700.00 Signage (engraving, painting, labels) ($60 ea.) $ 1,200.00 Incidentals (chain, concrete, anchors) ($25 ea.) $ 500.00 SubTotal $13,170.00 Temporary (Event) Recycling Containers Temporary Recycling Bin (4 Pack) (20 x $79) $ 1,580.00 Kraft paper lawn bags (250 count) $ 152.00 SubTotal $ 1,669.00 Labor Cost Assembly (Parks staff, Eagle Scouts) $ 0.00 Installation (20x $75) $ 1,500.00 SSC Recycling Bin $ 0.00 SSC Collection Costs $ 0.00 SubTotal $ 1,500.00 Operational Cost Additional Parks staff and/or time $ 0.00 Parks equipment $ 0.00 SSC Collection $ 0.00 SubTotal $ 0.00 TOTAL $16,339.00 9 Questions? Comments? 10