PILOT RECYCLING PROGRAMPILOT RECYCLING PROGRAM: SETTLERS PARK
1
3245 N. Meridian Road
Proposed Recycling Container Locations (N=20)
Playground
Baseball/Softball complex
Picnic Shelters (3)
Concession Stand areas
2
Recycling Containers and Locations
Match trash receptacle style
Made w/recycled plastic
Signage necessary
Locate next to a trash receptacle “point of decision”
Different Lid than trash receptacle
Target plastic and
tin beverage containers, paper
24 1/2” steel flat lid with 8”diameter round hold.
Color: Black only.
Will need signage regarding acceptable materials.
Playground
3
Recycling Containers and Locations
Picnic Shelters
Baseball/Softball Complex
4
Recycling Container Signage
5
Parks Staffing and Collection Equipment
Great people, durable equipment!
6
SSC Recycle Bin City Trash Enclosure
Recycle bin w/lockable opening. Forfeit one parking space for placement of recycle bin adjacent to City’s trash enclosure.
A temporary recycling bin will be placed next to
the trash enclosure during high use times.
7
Event Recycling
Settlers Park accommodates several popular Events throughout the year.
Temporary Recycling Containers placed at suitable Events, could
include:
Movie Night in Meridian
Large Baseball
Tournaments to supplement stationary recycling containers
Mayor’s Community Block Party
8
PROPOSED BUDGET
Permanent Recycling Containers
32 gal Recycling Container (20 x $415) $ 8,300.00
32 gal Plastic Can (20 x $27) $ 540.00
Surface Mounts (10 x $25) $ 250.00
Kraft paper lawn
bags + sh (1000 count) $ 680.00
Steel Lid w/8” Hole (20 x $85) $ 1,700.00
Signage (engraving, painting, labels) ($60 ea.) $ 1,200.00
Incidentals (chain, concrete, anchors) ($25
ea.) $ 500.00
SubTotal $13,170.00
Temporary (Event) Recycling Containers
Temporary Recycling Bin (4 Pack) (20 x $79) $ 1,580.00
Kraft paper lawn bags (250 count) $ 152.00
SubTotal $
1,669.00
Labor Cost
Assembly (Parks staff, Eagle Scouts) $ 0.00
Installation (20x $75) $ 1,500.00
SSC Recycling Bin $ 0.00
SSC Collection Costs $ 0.00
SubTotal $
1,500.00
Operational Cost
Additional Parks staff and/or time $ 0.00
Parks equipment $ 0.00
SSC Collection $ 0.00
SubTotal $ 0.00
TOTAL $16,339.00
9
Questions?
Comments?
10