Indemnification and Limitation of Liability Agreement with Idaho Power for Installing 3-phase power to Parks and Recreation Building1 Idaho Power Company Page: 1
pmu D
Service Request ate: 8/15/2012
An IDACOPP Company
Service Request Number: 00326856
CITY OF MERIDIAN -1853 E LANARK ST/MERIDIAN, 11) 83642 COMM SERV
Work Order Number:
27368515
Eng Hours: 00010
Request Type:
CS
Eng Fee Amount(Att98): 640.00
Rate Sch.:
09
Eng Fee Amount(Att16):
Reply By:
Primary OH/UG
Eng Fee Service Agreement No:
1 Phase KW Demand
Service OH/UG
Eng Fee Service Agreement Date.
3 Phase KW Demand
Sry Owner
Customer No:
Feeder:
MRDNI4A
1000AMP
Service Location:
1853 E LANARK ST MERIDIAN,
ID 83642
Required in Service Date:
6/7/2012
Planning Center/Team:
MERIDIAN
Contact Detail:
1m
Attribute Information
RES/COM
Service Voltage 120/208
No. Of Meters
ONE
Number of Phases THREE
Meter Location
WEST EXTERIOR WALL
/.� KW Motor Load:
Ct Loc
WEST EXTERIOR WALL
Largest Motor
Primary OH/UG
UG
1 Phase KW Demand
Service OH/UG
UG
3 Phase KW Demand
Sry Owner
IPCO
Connected KW Load 112KW
Panel Amp Size
1000AMP
Commercial Deposit Amount
Notes
THREE PHASE LINE EXTENSION TO SERVE NEW PARKS AND RECREATION BUILDING.
SERVICE VOLTAGE WILL BE 120/208 THREE PHASE, TRANSFORMER, SERVICE, AND
C/T METERING PACKAGE WERE SIZED TO SERVE FIELD HOUSE BEING BUILT
IN THE FUTURE. A SIGNED, NOTARIZED EASEMENT WILL BE REQUIRED PRIOR TO THE
LINE BEING ENERGIZED. IPCO CREW TO INSTALL TWO 4" SERVICE STUBS FOR THIS
PROJECT, TWO 4" STUBS FOR FUTURE FIELD HOUSE, AND ONE 2" STUB FOR LIGHTING
PEDESTAL. 95% COMPACTION OF THE TRENCH WAS CALLED FOR IN WORK ORDER
FOR THE LAST 230' OF TRENCH GOING NORTH TO TRANSFORMER. CUSTOMER TO
STAKE TRANSFORMER LOCATION AND FINAL GRADE PRIOR TO CREW BEGINNING
JOB. RUNNING LINE WAS OK'D BY DC ENGINEERING ON 6-8-12. THANKS
I understand that the information provided above is accurate to the best of my knowledge. Changes to load; voltage; location; etc.
may result in additio I engineering charges.
,"Client Signature Date Idaho Power Representative Signature Date
w --:M 1
POWER.
An IOACORP Company
CUSTOMER COST QUOTE
IDAHO
Customer or Project Name: Design Number: Work Order #:
CITY OF MERIDIAN -1853 E LANARK ST/MERIDIAN ID 836 0000092963 27368515
Line Installation Cost
1. Line Installation/Upgrade Costs
2. Company Betterment / Other Credits
3. Salvage Taxable - Credit
4. Customer Provided Trench
5. Net Line Installation Cost
Terminal Facilities
6. Terminal Facilities
7. Customer Allowance
8. Net Terminal Faclilites
9. Unusual Conditions
8;rlB�a etter 9f&re�litt
y 1}nusua on r tuns over $10,000)
11. Net Construction Cost
12. Net Vested OR Refundable Construction Cost
(Limited to 5 years or 4 additional applicants)
13. Construction Cost Not Available for Vesting or Refund
Other Charges
14. Vested Interest Work Order #
15. Billable Right of Way Permits
16. Prepaid Right of Way Permits
1.0"IN 17. Billable Engineering Charges
18. Prepaid Engineering Fees
19. Underground Service Attachment Charge
20. Relocation or removal with new capacity
21. Relocation or removal with NO new capacity
22. Salvage Credit on Relocation or Removal
23. Miscellaneous Charges/Adjustments
24. Net Other Charges
25. Total Work Order Charges
26. Idaho Power Co. Contribution & Other Credits
27. Total Customer Payment Due (Line 11 + Line 24)
Notes:
Prepaid Fees Debit Credit Totals
24,3451
1,110
1J
23,235
13,297
3,549
9,748
1,500
L� ]
34,483
20,088
14,395
�0
$ 0
960
$ 0
1,904
0
0
� 0
Is 42,006
$ 4,659
2,864
3 37,347
Notice: This written quotation shall be binding on the Company for a period of sixty days (60) from the date below indicated, subject to changes in
information provided by the Customer or changes in the Company's ability to obtain satisfactory rights-of-way or to comply with governmental
regulations, including but not limited to the rules, regulations, and tariffs of the Idaho Public Utilities Commission. The Customer must make payment of the
quote amount not less than thirty (30) days prior to the start of construction, but the Company does not represent that construction will commence within
av oays or receipt of payment. The starW construction Yfl be subject to the Company's ability to obtain the necessary labor, materials and equipment
Customer Signature X Date X r/-?-Zh2
(Customer Initials) Ch rges for installationof and r nd electrical service are not included In this Cost Quote and will be billed to
the customer after work has completed
l (Customer Initials) The customer acknowledges receipt of the reduced charge option brochure/packet, also available at idahopower.00m
IPCo Representative � r} � Quotation Date 6 - //�--/ 'Z—
Customer or Project Name:
Unusual Conditions Acknowledgement
Design Number: Work Order M
Unusual Conditions are construction conditions not normally encountered.
These conditions may include, but are not limited to: frost, landscape
replacement, road compaction, pavement replacement, chip -sealing, rock
digging, boring, incomplete customer trench, nonstandard facilities or
construction practices, and other than available voltage requirements.
I have read and understand the above definition of Unusual
Conditions as set forth in Idaho Power Company's Line Installation
tariff, Rule H. I further understand that Idaho Power Company will
determine the type and extent of the Unusual Conditions encountered.
Unusual Conditions charged for on the Customer Cost Quote sheet, but
not encountered, will be refunded to the Customer by Idaho Power
Company after the completion of construction.
Signed: IC
customer
Date: 22 ?�
INDEMNIFICATION AND LIMITATION OF LIABILITY
(hereinafter referred to as "Customer") has entered
into an agreement with Idaho Power Company to
rA
(hereinafter referred to as "Service") Customer will identify for Idaho Power Company, prior
to the commencement of Services, the location of all underground pipes, lines, and other
facilities (collectively referred to as "Underground Lines") that may be in the area in which
Idaho Power Company is working. Customer agrees to be responsible for identification and
location of all underground lines and to indemnify and hold Idaho Power Company, its
agents, subcontractors, employees, officers and its directors, harmless from Customer's
failure to properly or adequately identify same except to the extent finally determined by a
court of law to have resulted from the gross negligence or willful misconduct of Idaho Power
Company, its agents, subcontractors, employees, officers, and directors.
This indemnification and limitation of liability agreement shall survive the
termination/completion of the Services.
Dated:-}'-'=12sz) X _
Customer: