Loading...
Indemnification and Limitation of Liability Agreement with Idaho Power for Installing 3-phase power to Parks and Recreation Building1 Idaho Power Company Page: 1 pmu D Service Request ate: 8/15/2012 An IDACOPP Company Service Request Number: 00326856 CITY OF MERIDIAN -1853 E LANARK ST/MERIDIAN, 11) 83642 COMM SERV Work Order Number: 27368515 Eng Hours: 00010 Request Type: CS Eng Fee Amount(Att98): 640.00 Rate Sch.: 09 Eng Fee Amount(Att16): Reply By: Primary OH/UG Eng Fee Service Agreement No: 1 Phase KW Demand Service OH/UG Eng Fee Service Agreement Date. 3 Phase KW Demand Sry Owner Customer No: Feeder: MRDNI4A 1000AMP Service Location: 1853 E LANARK ST MERIDIAN, ID 83642 Required in Service Date: 6/7/2012 Planning Center/Team: MERIDIAN Contact Detail: 1m Attribute Information RES/COM Service Voltage 120/208 No. Of Meters ONE Number of Phases THREE Meter Location WEST EXTERIOR WALL /.� KW Motor Load: Ct Loc WEST EXTERIOR WALL Largest Motor Primary OH/UG UG 1 Phase KW Demand Service OH/UG UG 3 Phase KW Demand Sry Owner IPCO Connected KW Load 112KW Panel Amp Size 1000AMP Commercial Deposit Amount Notes THREE PHASE LINE EXTENSION TO SERVE NEW PARKS AND RECREATION BUILDING. SERVICE VOLTAGE WILL BE 120/208 THREE PHASE, TRANSFORMER, SERVICE, AND C/T METERING PACKAGE WERE SIZED TO SERVE FIELD HOUSE BEING BUILT IN THE FUTURE. A SIGNED, NOTARIZED EASEMENT WILL BE REQUIRED PRIOR TO THE LINE BEING ENERGIZED. IPCO CREW TO INSTALL TWO 4" SERVICE STUBS FOR THIS PROJECT, TWO 4" STUBS FOR FUTURE FIELD HOUSE, AND ONE 2" STUB FOR LIGHTING PEDESTAL. 95% COMPACTION OF THE TRENCH WAS CALLED FOR IN WORK ORDER FOR THE LAST 230' OF TRENCH GOING NORTH TO TRANSFORMER. CUSTOMER TO STAKE TRANSFORMER LOCATION AND FINAL GRADE PRIOR TO CREW BEGINNING JOB. RUNNING LINE WAS OK'D BY DC ENGINEERING ON 6-8-12. THANKS I understand that the information provided above is accurate to the best of my knowledge. Changes to load; voltage; location; etc. may result in additio I engineering charges. ,"Client Signature Date Idaho Power Representative Signature Date w --:M 1 POWER. An IOACORP Company CUSTOMER COST QUOTE IDAHO Customer or Project Name: Design Number: Work Order #: CITY OF MERIDIAN -1853 E LANARK ST/MERIDIAN ID 836 0000092963 27368515 Line Installation Cost 1. Line Installation/Upgrade Costs 2. Company Betterment / Other Credits 3. Salvage Taxable - Credit 4. Customer Provided Trench 5. Net Line Installation Cost Terminal Facilities 6. Terminal Facilities 7. Customer Allowance 8. Net Terminal Faclilites 9. Unusual Conditions 8;rlB�a etter 9f&re�litt y 1}nusua on r tuns over $10,000) 11. Net Construction Cost 12. Net Vested OR Refundable Construction Cost (Limited to 5 years or 4 additional applicants) 13. Construction Cost Not Available for Vesting or Refund Other Charges 14. Vested Interest Work Order # 15. Billable Right of Way Permits 16. Prepaid Right of Way Permits 1.0"IN 17. Billable Engineering Charges 18. Prepaid Engineering Fees 19. Underground Service Attachment Charge 20. Relocation or removal with new capacity 21. Relocation or removal with NO new capacity 22. Salvage Credit on Relocation or Removal 23. Miscellaneous Charges/Adjustments 24. Net Other Charges 25. Total Work Order Charges 26. Idaho Power Co. Contribution & Other Credits 27. Total Customer Payment Due (Line 11 + Line 24) Notes: Prepaid Fees Debit Credit Totals 24,3451 1,110 1J 23,235 13,297 3,549 9,748 1,500 L� ] 34,483 20,088 14,395 �0 $ 0 960 $ 0 1,904 0 0 � 0 Is 42,006 $ 4,659 2,864 3 37,347 Notice: This written quotation shall be binding on the Company for a period of sixty days (60) from the date below indicated, subject to changes in information provided by the Customer or changes in the Company's ability to obtain satisfactory rights-of-way or to comply with governmental regulations, including but not limited to the rules, regulations, and tariffs of the Idaho Public Utilities Commission. The Customer must make payment of the quote amount not less than thirty (30) days prior to the start of construction, but the Company does not represent that construction will commence within av oays or receipt of payment. The starW construction Yfl be subject to the Company's ability to obtain the necessary labor, materials and equipment Customer Signature X Date X r/-?-Zh2 (Customer Initials) Ch rges for installationof and r nd electrical service are not included In this Cost Quote and will be billed to the customer after work has completed l (Customer Initials) The customer acknowledges receipt of the reduced charge option brochure/packet, also available at idahopower.00m IPCo Representative � r} � Quotation Date 6 - //�--/ 'Z— Customer or Project Name: Unusual Conditions Acknowledgement Design Number: Work Order M Unusual Conditions are construction conditions not normally encountered. These conditions may include, but are not limited to: frost, landscape replacement, road compaction, pavement replacement, chip -sealing, rock digging, boring, incomplete customer trench, nonstandard facilities or construction practices, and other than available voltage requirements. I have read and understand the above definition of Unusual Conditions as set forth in Idaho Power Company's Line Installation tariff, Rule H. I further understand that Idaho Power Company will determine the type and extent of the Unusual Conditions encountered. Unusual Conditions charged for on the Customer Cost Quote sheet, but not encountered, will be refunded to the Customer by Idaho Power Company after the completion of construction. Signed: IC customer Date: 22 ?� INDEMNIFICATION AND LIMITATION OF LIABILITY (hereinafter referred to as "Customer") has entered into an agreement with Idaho Power Company to rA (hereinafter referred to as "Service") Customer will identify for Idaho Power Company, prior to the commencement of Services, the location of all underground pipes, lines, and other facilities (collectively referred to as "Underground Lines") that may be in the area in which Idaho Power Company is working. Customer agrees to be responsible for identification and location of all underground lines and to indemnify and hold Idaho Power Company, its agents, subcontractors, employees, officers and its directors, harmless from Customer's failure to properly or adequately identify same except to the extent finally determined by a court of law to have resulted from the gross negligence or willful misconduct of Idaho Power Company, its agents, subcontractors, employees, officers, and directors. This indemnification and limitation of liability agreement shall survive the termination/completion of the Services. Dated:-}'-'=12sz) X _ Customer: