Loading...
Task Order No 10083 heroes parkPURCHASING AGENT 33 E. Broadway Ave, Meridian, ID 83642 Phone: (208) 888-4433 x 417 Fax: (208) 887-4813 TASK ORDER NO. 10083 Between CITY OF MERIDIAN AND DC Engineering This Task Order is issued by City and accepted by the Engineer pursuant to the mutual promises, covenant and conditions contained in the Master Agreement between the above mentioned parties dated January, 2007. Heroes Park Water Quality Analyzer Relocation SCOPE OF SERVICES Provide services required to move the existing Heroes Park water quality analyzer from the Meridian Waste Water Treatment Plant to the Heroes Park pond. DC Engineering will sub -contract the installation to JC Constructors and Peak Electric to fast track this project. • Provide PLC control panel. • Program the PLC and Radio at Heroes Park and the Waste Water Treatment Plant. • Develop daily flow and water quality report in Wonderware Historian. • Relocate the existing water quality analyzer. TIME OF PERFORMANCE DC Engineering has a capable staff that can start immediately. COMPENSATION DC Engineering Community Service JC Constructors (see attachT Proposal) $3,167.47 Peak Electric (see attached Proposal) less metering pump $8,018.00 Total $11,185.00 CITY OF MERIDIAN BY: TAMMY de WEERD, MAYOR Dated: _ j Approved by City Council: N% Attest: JAYCEE L. HOL�", CITY CLEIAK Approved as to Cont BY: KEITH WATTS. PukaMWG AGENT Dated: 'r DC Engineering Dated: 6/3/09 TITLE: Dated: CA /09 *C%VHANGE PROPOSAL REQUEST I.PROJECT 2.CONTRACTOR JC CONSTRUCTORS 3.PROJECT NO. 5.CONTRACT NO: Change Proposal # 6.131ROPOSAL DATE 26 -Ma ±9 DESCRIPTION OF CHANGE Remove panel and mount at new location at Heros Park Trench from shed to pipe at west side Install conduit and poly tubing Install saddle tap and bushing Backfill trench and clean up COST SUMMARY A. FOR CHANGE WORK DIRECTLY PERFORMED BY THE UNDERSIGNED CONTRACTOR 1. Direct labor wl labor fringes (Attach supporting detail estimates with man-hours and rates) $ 949.78 2. Insurance and Labor Taxes $ 226.34 3. Materials and Equipment. Detailed quantities attached. $ 1,537.50 4. Overhead & Fee @ 15% $ 407.04 Time Extention ReWested 0 working day JC Constructors' Cost $ 3,120.66 B. For work to be performed by subcontractors, per proposals and detailed breakdowns TOTAL SUBCONTRACTOR AMOUNT (INCLUDING $US, OH&P): 3 CONTRACTORS COMMISSION ON TOTAL- SUBCONTRACTOR AMOUNT 0 5 PERCENT: $ CONTRACTORS BOND COST O &01811000 $ 46.81 C. TOTAL INCREASE OR DECREASE OF CONTRACT PRICE - (A5+B5) S 3.167.47 JC CONSTRUCTORS, INC. CONTRACTOR NAME Jim Cox PRINTED NAME ON PROPOSAL R. M. M SIGNAWREIDATE /o=DCEngineering/ou=Exchange Administrative Group (FYDIBOH F23SPDL7)/cn=Recipients/cn=lhuddieston From: Peak Electric [office@peak-electric.net] Sent: Tuesday, June 02, 2009 2:46 PM To: Lane Huddleston Cc: aj.lehman@peak-eiectric.net Subject: Meterina Panel. Lane, Here it is, please call with any questions. AJ PO Box 217 — Star 208-585-9424 , !ToU Free. 877-585-9424 To: Lane Huddleston Date: June 2, 2009 From: A] Lehman Re: Metering Panel Lane, Here is the breakdown in cost for the Metering Panel and Neptune PZ pump. Metering Panel $ 4,918.00 Charge to Expedite $ 600.00 Lahr and Material to Install $ 2,500.00 Neptune PZ Pump $ 1.691.00 Total $ 9,709.00 Please feel free to contact me @ 941-5870 If you have any questions. Thank you, A] Lehman Peak Electric, Inc. 6/3/2009 Page 1 of 1