Loading...
Shops at Victory H-2016-0029BEFORE THE MERIDIAN CITY COUNCIL IN THE MATTER OF THE REQUEST FOR FINAL PLAT CONSISTING OF THREE (3) COMMERCIAL LOTS ON 3.68 ACRES IN THE C -C ZONING DISTRICT FOR SHOPS AT VICTORY. BY: WHITE-LEASURE DEVELOPMENT COMPANY, LLC APPLICANT HEARING DATE: APRIL 5, 2016 CASE NO. H-2016-0029 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT This matter coming before the City Council on April 5, 2016 for final plat approval pursuant to Unified Development Code (UDC) 11-6B-3 and the Council finding that the Administrative Review is complete by the Planning and Development Set vices Divisions of the Community Development Department, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat, the Council takes the following action: IT IS HEREBY ORDERED THAT: 1. The Final Plat of "PLAT SHOWING SHOPS AT VICTORY SUBDIVISION, LOCATED IN NW 1/40F SECTION 28, TOWNSHIP 3N, RANGE 1E, BOISE MERIDIAN, MERIDIAN, ADA COUNTY, IDAHO, 2016, HANDWRITTEN DATE: MARCH 4, 2016, JAMES R. WASHBURN, PLS, SHEET 1 OF 3," is conditionally approved subject to those conditions of Staff as set forth in the staff ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SHOPS AT VICTORY (H-2016-0029) Page 1 of 3 report to the Mayor and City Council from the Planning and Development Services divisions of the Community Development Department dated April 5, 2016, a true and correct copy of which is attached hereto marked "Exhibit A" and by this reference incorporated herein, and the response letter from Ken Lenz, White Leasure Development Company, a true and correct copy of which is attached hereto marked "Exhibit B" and by this reference incorporated herein. 2. The final plat upon which there is contained the certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be signed only at such time as: 2.1 The plat dimensions are approved by the City Engineer; and 2.2 The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash surety has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified that pursuant to Idaho Code § 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SHOPS AT VICTORY (H-2016-0029) Page 2 of 3 Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code § 67-6521. An affected person being a person who has an interest in real property which may be adversely affected by this decision may, within twenty- eight (28) days after the date of this decision and order, seek a judicial review pursuant to Idaho Code§ 67-52. By action of the City Council at its regular meeting held on the 4vr1) , 2016. By: Tammy eerd GO�40�pTEDAZU1 j Mayor, y of Meridian Attest: 90 W Gty Of E IDIAN -- IDAHO acy Jones `�y SEAL City Clerk �Ibe TREks day of Copy served upon the Applicant, Planning and Development Services Divisions of the Community Development Department and City Attorney. By: Dated: ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SHOPS AT VICTORY (H-2016-0029) Page 3 of 3 EXHIBIT A Shops at Victory Final Plat - H-2016-0029 PAGE 1 STAFF REPORT HEARING DATE: April 5, 2016 TO: Mayor and City Council FROM: C.Jay Coles, Assistant City Planner 208-884-5533 Bruce Freckleton, Development Services Manager 208-887-2211 SUBJECT: H-2016-0029 – Shops at Victory I. APPLICATION SUMMARY The applicant, White-Leasure Development Company, has applied for final plat (FP) approval of three (3) commercial lots on 3.677 acres of land in the C-C zoning district. II. STAFF RECOMMENDATION Staff recommends approval of the Shops at Victory final plat subject to the conditions noted in Sections VI, VII and VIII below. These conditions shall be considered in full, unless expressly modified or deleted by motion of the City Council. III. PROPOSED MOTION Approval I move to approve File Number H-2016-0029 as presented in the staff report for the hearing date of April 5, 2016, with the following modifications: (Add any proposed modifications.) Denial I move to deny File Number H-2016-0029, as presented during the hearing on April 5, 2016, for the following reasons: (You should state specific reasons for denial.) Continuance I move to continue File Number H-2016-0029 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for conti nuance.) IV. APPLICATION AND PROPERTY FACTS A. Site Address/Location: The subject property is located at 3210 S Eagle Road in the NW ¼ of Section 28, Township 3 North, Range 1 East. (Parcel # S1128223210) B. Applicant(s): White-Leasure Development Company 8385 W Emerald Street Boise, ID 83704 C. Representative: The Land Group, Inc. 462 E Shore Drive, #100 Eagle, ID 83616 EXHIBIT A Shops at Victory Final Plat - H-2016-0029 PAGE 2 V. STAFF ANALYSIS The proposed final plat depicts three (3) commercial lots on 3.677 acres of land in a C-C zoning district. The street landscape buffers along the west and north boundaries, along with the boundary landscape buffers to the south and east, were approved with the Rite Aid Certificate of Zoning Compliance (A- 2015-0061). However, UDC 11-3B-7C2b requires “All commercial…street buffers shall be on a common lot or on a permanent dedicated buffer, maintained by the property owner or business owners’ association.” Staff has reviewed the proposed final plat for substantial compliance with the approved preliminary plat (PP-08-006). Because the number of building lots shown on the final plat is the same as the approved preliminary plat staff deems the final plat to be in substantial compliance as required by UDC11-6B-3C.2. VI. SITE SPECIFIC CONDITIONS 1. Applicant shall meet all terms of the approved annexation, preliminary plat, conditional use permit, alternative compliance, certificate of zoning compliance and recorded development agreement (AZ-08-007; PP-08-006; CUP-08-011; ALT-08-012; A-2015-0061 and DA instrument #111032845) for this subdivision. 2. The final plat prepared by The Land Group, Inc., stamped on March 4, 2016 by James R. Washburn, shall be revised as follows: a. Prior to recording the plat: note #8 insert instrument number. b. Prior to recording the plat: note #9 insert instrument number. c. The 25-foot wide street buffers along S. Eagle Road and E. Victory Road shall be graphically depicted on the face of the plat via a common lot or on a permanent dedicated buffer and maintained by property owner or business owners’ association in accord with UDC 11-3B- 7C2b. 3. If the City Engineer’s signature has not been obtained by September 9, 2016 per TEC-15-004, the final plat shall become null and void unless a time extension is obtained, per UDC 11-6B-7. 4. Prior to submittal for the City Engineer’s signature, have the Certificate of Owners and the accompanying acknowledgement signed and notarized. 5. Prior to applying for building permits for Lots 1 and 3, Block 1, the applicant shall obtain the Planning Division’s approval of a certificate of zoning compliance and design review application. Future development shall be consistent with the design standards listed in UDC 11-3A-19 and the guidelines contained in the City of Meridian Architectural Standards Manual. 6. Per H-2015-0010, the subject property shall be subdivided in accordance with the Unified Development Code prior to applying for certificates of zoning compliance, design review and/or building permits for Lots 1 and 3, Block 1. 7. A street light plan shall be submitted and approved with the construction drawings. Street light plan requirements are listed in section 6-5 of the Improvement Standards for Street Lighting. A copy of the standards can be found at http://www.meridiancity.org/public_works.aspx?id=272. 8. Applicant shall be responsible for the extension of sanitary sewer and water mains to provide service to the individual lots. 9. Applicant shall be responsible to provide as-built drawings for all new and existing sanitary sewer and water mains serving the subject development. EXHIBIT A Shops at Victory Final Plat - H-2016-0029 PAGE 3 10. The applicant has submitted evidence to the City Engineer that satisfactorily demonstrates that adequate surface irrigation water does not currently exist for the provision of a pressurized irrigation system. Therefore, the City Engineer has granted a waiver to the pressurized irrigation requirements and has approved the use of domestic water for landscape irrigation purposes. VII. ONGOING CONDITIONS OF APPROVAL 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. (Staff has approved a waiver to the pressurized irrigation requirement through a letter dated October 15, 2015 signed by the City Engineer as noted above.) 2. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 3. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 4. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11- 3A-3. VIII. GENERAL REQUIREMENTS 1. Sanitary sewer service to this development is available via extension of existing mains adjacent to the development. The applicant shall install mains to and through this subdivision; applicant shall coordinate main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2. Water service to this site is available via extension of existing mains adjacent to the development. The applicant shall be responsible to install water mains to and through this development, coordinate main size and routing with Public Works. 3. Street signs are to be in place, sanitary sewer and water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved by the Ada County Highway District (ACHD) and the Final Plat for this subdivision shall be recorded, prior to applying for building permits. 4. Upon installation of the landscaping and prior to inspection by Planning Department staff, the applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A. 5. A letter of credit or cash surety in the amount of 110% will be required for all incomplete fencing, landscaping, amenities, and prior to signature on the final plat. 6. The City of Meridian requires that the owner post with the City a performance surety in the amount of 125% of the total construction cost for all incomplete sewer, water infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The applicant shall be required to enter into a Development Surety Agreement with the City of Meridian. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety, which can be found on the EXHIBIT A Shops at Victory Final Plat - H-2016-0029 PAGE 4 Community Development Department website. Please contact Land Development Service for more information at 887-2211. 7. The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 8. All development improvements, including but not limited to sewer, water, fencing, and landscaping shall be installed and approved prior to obtaining certificates of occupancy, or as otherwise allowed by UDC 11-5C-1. 9. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to the issuance of a plan approval letter. 10. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 11. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 12. Developer shall coordinate mailbox locations with the Meridian Post Office. 13. Developer shall coordinate trash enclosure locations with Republic Services. 14. All grading of the site shall be performed in conformance with MCC 11-12-3H. 15. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 16. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1-foot above. 17. The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 18. At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 19. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer’s expense. Final design shall be submitted as part of the development plan set for approval, which must include the location of any existing street lights. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The contractor’s work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. Contact the City of Meridian Transportation and Utility Coordinator at 898-5500 for information on the locations of existing street lighting. EXHIBIT A Shops at Victory Final Plat - H-2016-0029 PAGE 5 20. The applicant shall provide easement(s) for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easement widths shall be 20-feet wide for a single utility, or 30-feet wide for two. The easements shall not be dedicated via the plat, but rather dedicated outside the plat process using the City of Meridian’s standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement (on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor, which must include the area of the easement (marked EXHIBIT A) and an 81/2” x 11” map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. All easements must be submitted, reviewed, and approved prior to development plan approval. 21. Applicant shall be responsible for application and compliance with and NPDES permitting that may be required by the Environmental Protection Agency. 22. Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Engineering Department at (208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at (208)334-2190. 23. Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment procedures and inspections (208)375-5211. 24. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water (MCC 12-13-8.3). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single-point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to development plan approval. (Staff has approved a waiver to the pressurized irrigation requirement through a letter dated October 15, 2015 signed by the City Engineer as noted above) 25. All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways, intersecting, crossing or laying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11-3A-6. In performing such work, the applicant shall comply with Idaho Code 42-1207 and any other applicable law or regulation. IX. EXHIBITS A. Vicinity Map B. Approved Preliminary Plat (PP-08-006) C. Proposed Final Plat (dated: 3/4/2016) EXHIBIT A Shops at Victory Final Plat - H-2016-0029 PAGE 6 Exhibit A – Vicinity Map EXHIBIT A Shops at Victory Final Plat - H-2016-0029 PAGE 7 Exhibit B – Approved Preliminary Plat (PP-08-006) EXHIBIT A Shops at Victory Final Plat - H-2016-0029 PAGE 8 Exhibit C – Proposed Final Plat (dated: 3/4/2016) Machelle Hill From: C.Jay Coles Sent: Friday, April 01, 2016 9:33 AM To: JacyJones; Machelle Hill Subject: FW: Shops at Victory Final Plat Applicant is in agreement with the staff report for Shops at Victory final plat C.Jay From: Ken Lenz [klenz@white-leasure.com] Sent: Thursday, March 31, 2016 6:04 PM To: C.Jay Coles; Jason Densmer Cc:Jeff Huber Subject: RE: Shops at Victory Final Plat Hi C. Jay We are OK with the staff report. Jeff Huber will be at the hearing and discuss any issues that may arise. Ken Lenz White Leasure Development Company 8385 W. Emerald St. Boise, ID 83704 Office: (208) 345-1842 Direct: (208) 493-6305 Cell: (208) 724-6226 Fax: (208) 343-3143 Email: KLenz@White-Leasure.com I