Loading...
PZ - Agency Comments.. DISTRICT CENTRAL DISTRICT HEALTH DEPARTMENT Return to: HEALTH Environmental Health Division ❑ ACz DEPARTMENT ❑ Boise Ll Eagle Rezone # Zc�(� — �;a�f, ❑ Garden City Conditional Use # ❑ Kuna Preliminary / Final / Short Plat ,Meridian ❑ Star 11,1. We have No Objections to this Proposal. ❑ 2. We recommend Denial of this Proposal. ❑ 3. Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. ❑ 4. We will require more data concerning soil conditions on this Proposal before we can comment. ❑ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of: ❑ high seasonal ground water ❑ waste flow characteristics ❑ bedrock from original grade ❑ other ❑ 6. This office may require a study to assess the impact of nutrients and pathogens to receiving ground waters and surface waters. ❑ 7. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and water availability. ❑ 8. After written approval from appropriate entities are submitted, we can approve this proposal for: ❑ central sewage ❑ community sewage system ❑ community water well ❑ interim sewage ❑ central water ❑ individual sewage ❑ individual water ❑ 9. The following plan(s) must be submitted to and approved by the Idaho Department of Environmental Quality: ❑ central sewage ❑ community sewage system ❑ community water ❑ sewage dry lines ❑ central water ❑ 10. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. ❑ 11. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ❑ 12. We will require plans be submitted for a plan review for any: ❑ food establishment ❑ swimming pools or spas ❑ child care center ❑ beverage establishment ❑ grocery store ❑ 13. Infiltration beds for storm water disposal are considered shallow injection wells. An application and fee must be submitted to CDHD. ❑ 14. Reviewed By c Date: Review Sheet 15726-001EH1111 1 Machelle Hill From:Lauren Boehlke <laurenboehlke@yahoo.com> Sent:Monday, March 28, 2016 8:24 AM To:clerk Subject:Gibson property In response to your annexation of Parcel #S1131212652, this property has a valid water right through Boise-Kuna Irrigation District. Will you be retaining the water right on the property or are you planning to remove the water right permanently? If removing the water right, the owner must submit a letter addressed to the Board of Directors of Boise- Kuna Irrigation District requesting the removal. If you can get it to me before April 5th, I can have by Board act on it at my Board meeting that day. If you have any questions, please contact me either by email or you can call me at the number listed below. I am not always in the office, but you can leave a message with my clerk. Lauren S Boehlke Sec.-Treasurer Boise-Kuna Irrigation District Phone# 922-5608 Fax# 922-5659 March 31, 2016 Josh Beach City of Meridian 33 E. Broadway Avenue Meridian, Idaho 83642 VIA EMAIL RE: H-2016-0036 GIBSON AMITY PROPERTY The Idaho Transportation Department (ITD) has reviewed the referenced annexation and zoning application for the Gibson Amity Property at 357 E. Amity Road east of SH-69. ITD has the following comments: 1. ITD has no objection to this application and does not require any mitigation. 2. This property does not abut the State highway system. If you have any questions, you may contact Ken Couch at 332-7190 or me at 332-7191. Sincerely, James K. Morrison Development Services Manager jim.morrison@itd.idaho.gov 04/11/2016 09:16 RON PLATT CHAIRMAN DFTHE 30A?0 RICHARC3 MURGOITIO VICE CHAIRMAN OF THE ROARD TIMOTHY M, PAGE PROJECT MANAGER ROBERT D, r,ARTER A GISTaNT PROJECT MANAQF.R APRYL GARDNER SECRETARY-TREASURFR JERRIFLOYD ASSISTANT' SECRFTARY- TREASURER 2083441437 BOISE PROJECT 'BOISE PRO.JEC-f BOARD OF CONTROL City of Meridian City Clerk's Office 33 E. Broadway Avenue Meridian, Idaho 83642 (FORWRLY SOI•SG U.S. RP..CLAMATION PRO.ICCT) 2486 oVERLAND ROAD BOISE, IDAHO 8:;705-3155 RE: CLO, Inc. 357 E. Amity Rd. Boise -Duna Irrigation. District Farr Lateral 222+00 Watkins Drain Sec. 31, T3N, R,1. F-, BM. Jaycee Holman, City Clerk: 07 April 2016 File No: U-2016-0036 BK -61 PAGE 01/02 OPERATING AGFNry FOR 167,0nn ACRES FOR TI -IF FOLLOWING IRRIRATION DISTRICT'S NAMPA-MERIDIAN DISTRICT 901SE-KUNA DISTRICT WILDER DISTRICT NEW YORK gISTRICT BIG BEND DISTRICT TEL: (208) 344-1141 FAX: (7.08) 341.14,07 The United States' Watkins Drain lies within the boundaries of, the above-mentioned location. The easement for this facility is held in the name of the United States through. the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and maintain this facility. We assert this federal easement 50 feet frorn center both directions of the Watkins Drain. Whereas this area is for the operation and maintenance of our facilities, no activity should hinder our ability to do so. Project easements must be called out on any future preliminary and final plats, Fencing (as may be required) must be constructed, just off the Project facility easement. The Boise Project does not approve landscaping (other than grass) within its easements. Parking lots, curbing, Iight poles, signs, etc. and the placing of asphalt and/or cement over Project facility easements must be approved by Boise Prgject Board of. Control prior to construction.. The construction of any roadway crossings must be conducted only during the non - irrigation season when the lateral is dewatered. In any case no work shall take place 04/11/2016 09:16 2083441437 BOISE PROJECT PAGE 02/02 within the easement before the proper, crossing agreements have been secured through the Bureau of Reclamation and the Boise Project Board of Control. Utilities planning to cross an -y project facility in order to service this development must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities_ In any case no work sba'11 take place within the easement before proper crossing agreements have been secured through, both the Bureau of Reclamation and the Boise Project Board of Control. Storm Drainage and/or. Street Runoff must be retained on site. ,Local irrigation/drainage ditches that cross this property, in order to serve neighboring properties, must remain unobstructed and protected by an appropriate easement. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the night to review plans and require changes when our casements and/or facilities are affected by unknown factors. If you have any further questions or comments regarding this matter., please do not hesitate to contact me at (208) 344-1141. Sincerely, Bob Carter ,Assistant Project Manager- BPBC bdc/bc cc: Clint McCormick Watermaster, Div; 2 BPBC Lauren Boehllce Secretary -Treasurer, BMD File ORGA1,11/1:1) 1904 6 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 FAX #208-463-0092 nmid.org OFFICE: Nampa 208-466-7861 16 SHOP: Nampa 208-466-0663 .e, Suite 102 619 Amity Property; 357 E. Amity Road Nampa & Meridian Irrigation District > (NMID) has no comment on the above -referenced application. All private laterals and waste ways must be protected. All municipal surface drainage must be retained on-site: If any surface drainage leaves the site, Nampa & Meridian Irrigation District (NMID) must review drainage plans. Sincerely, Greg G. Curtis Water Superintendent Nampa & Meridian Irrigation District GGC/gnf PC: Office/File RON PLATT CHAIRMAN OF THE BOARD RICHARD MURGOITIO VICE CHAIRMAN OF THE BOARD TIMOTHY M. PAGE PROJECT MANAGER ROBERT D. CARTER ASSISTANT PROJECT MANAGER APRYLGARDNER SECRETARY -TREASURER JERRIFLOYD ASSISTANT SECRETARY - TREASURER City of Meridian City Clerk's Office 33 E. Broadway Avenue Meridian, Idaho 83642 (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE, IDAHO 83705-3155 07 April 2016 RE: CLG, Inc. File No: H-2016-0036 357 E. Amity Rd. Boise-Kuna.Irrigation District BK -61 Farr Lateral 222+00 Watkins Drain Sec. 31,.T3N, R1 E, BM. Jaycee Holman, City Clerk: OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL: (208) 344-1141 FAX: (208) 344-1437 The United States' Watkins Drain lies within the boundaries of the above-mentioned location. The easement for this facility is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391;43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and maintain this facility. We assert this federal easement 50 feet from center both directions of the Watkins Drain. Whereas this area is for the operation and maintenance of our facilities, no activity should hinder our ability to do so. Project easements must be called out on any future preliminary and final plats. Fencing (as may be required) must be constructed just off the Project facility easement. The Boise Project does not approve landscaping (other than grass) within its easements. Parkinglots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Project facility easements must be approved by Boise Project Board of Control prior to construction. The construction of any roadway crossings must be conducted only during the non - irrigation season when the lateral is dewatered. In any case no work shall take place within the easement before the proper crossing agreements have been secured through the Bureau of Reclamation and the Boise Project Board of Control. Utilities planning to cross any project facility in order to service this development must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In any case no work shall take place within the easement before proper crossing agreements have been secured through both the Bureau of Reclamation and the Boise Project Board of Control. Storm Drainage and/or Street Runoff must be retained on site. Local irrigation/drainage ditches that cross this property, in order to serve neighboring properties, must remain unobstructed and protected by an appropriate easement. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right to review plans and require changes when our easements and/or facilities are affected by unknown factors. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Sincerely, �W_� Bob Carter Assistant Project Manager- BPBC bdc/bc cc: Clint McCormick Watermaster, Div; 2 BPBC Lauren Boehlke Secretary -Treasurer, BKID File