Loading...
Task Order No PKS 09-002 STRATA 8th st parkTASK ORDER NO. PKS-09-002 CITY OF MERIDIAN (OWNER) AND STRATA (CONSULTANT) This Task Order Is issued by Owner and accepted by the Consultant pursuant to the mutual promises, covenants and conditions contained in the Master Agreement between the above named parties dated December 13th, 2006. CITY OF MERIDIAN 8s' Street Park Pedestrian Pathway B Box Culverts — Phase 1 PURPOSE The Consultants supe of services and compensation shall be as set forth herein. Services shall generally be described as testing and Inspections consulting services. TASK 1— Testing and Inspections Consulting Services Per the City's request, the Consultant will provide professional testing and inspections consulting services relating to the construction of the & Street park Pedestrian pathway & Box Culverts — Phase 1 project. These services are listed in STRATA's December 22. 2008 Cost Estimate (Attachment A). 11 COMPENSATION The Not-To-ExcmW amount for Task Order No. PKS-09-002 is One Thousand Seven Hundred Nine Two and 40/100 dollars ($1,792.40). CONSULT T ( thorized Representative) %-;' c9 Date Approved by City Council: 1- 2:z ^ 69 Date TASK ORDER NO. PKS-09-002 CITY OF MERIDIAN (OWNER) AND STRATA (CONSULTANT) CITY OF MERIDIAN Street park Pedestrian Pathway & Box Culverts — Phase 1 ATTACHMENT A 6 S T R ?_►T a .+.••�..n.n :u,•xmn rnaa.na�n :...a• �. v.�vp: ,�tfyfj• fio.. ya. �iwnd Yr TO: CITY OF MERIDIAN QUOTE DATE: IZ2=W8 MAX JENSEN PHONE: 888-4433 CITY OF MERIDIAN, PUBLIC WORKS DEPT. FAX: 887-4813 PROJECT.' 8th Street Park Pedestrian Pathway & box Culvert QUOTE NUMBER: BP08469 COST ESTIMATE ITEM DESCRIPTION EST QUAD UNIT PRICE ESTIMATED COST SOILS TESTING & INSPECTION• 1) Technician for subgrade & structural fill density, per hr. 24.0 43.00 1032.00 (8 Trips @ 3hr each) 2) Nuclear density gauge, per hour. 24.0 12.00 288.00 S_CELLANEOUS 6) Mileage, 8 trips @ 54 miles each, 432.0 0.70 302.40 7) Project Management 2.0 85.00 170.00 8) Overtime surcharge, if over, 8hrs/day, 40hrsMweek, 0.0 21.50 0.00 9) weekends or holidays, per hour. 0.0 0.00 8 0.00 The above listed services will be provided for the estimated fee of The services described above are based on our review of the plans. The cost shown are based upon the estimated quantities Indicated and dependent upon the contractor's schedule and performance. These fees represent the amount of testing required from our knowledge of the project document. If the quantities change, a corresponding change In cost will occur. All prices Include supervision and report. The above scope of services will be performed according to the terms and conditions described In the attached agreement for services. We will need at least 24 hours notice t6schedule our personnel. Brian Sheller, Project Manager IDAHO MONTANA NEVADA OREGON UTAH WASHINGTON WYOMING www.stratageotech.com 8653 W. Hackemore Drive Boise, Idaho 83709 P.208.378.8200 F.208.376.8201 81h st box culvert replacement PURPOSAL