Loading...
Executed Task Order 10122.b Storey Park Field SurveyTASK ORDER NO. 10122,b Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND CIVIL SURVEY CONSULTANTS, INC. (ENGINEER) This Task Order is made this 29th day of March, 2013 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by Civil Survey Consultants, Inc., hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (Category 9A) between the above mentioned parties dated ApriI13, 2010. The Project Name for this Task Order 10122.b is as follows: CITY OF MERIDIAN STORY PARK FIELD SURVEY PROJECT UNDERSTANDING This task order provides professional survey services to assist the City in preparation for submitting a short plat application to accomplish a land trade and satisfy the conversion requirements of the Land and Water Conservation Fund. The consultant will perform field survey services and prepare a preliminary plat drawing for short plat approval by the City Council and Mayor, set property corner pins and prepare a final plat drawing for agency approvals. The City will be responsible for circulating the final plat drawing to all agencies pursuant to finalizing the land trade. SCOPE OF WORK The following tasks will be performed to allow the City to process a short plat. Task 1 — Field Survey 1.1 Perform field surveys needed to locate and tie controlling corner monumentation required to determine the exterior boundaries of the total parcel (Ada County Parcel No. S1 1 1 222720). Task Order 10122.b Storey Park Field Survey Page 1 of 3 Civil Survey Consultants, Inc. 1.2 Perform office calculations needed to determine the positions of any missing corners on the exterior boundary and the new corner locations of the interior parcel lines. 1.3 Perform field surveys to set missing and new corner monuments. 1.4 Prepare a short plat in compliance with Section 11-66 of the City of Meridian Subdivision Ordinance. Deliverables 1. Preliminary Plat Drawing 2. Final Plat Drawing ASSUMPTIONS This Task Order does not include any engineering design that may be required by ACHD or others as a condition of approval. Should that situation arise, Engineer can provide additional services through a written task order change order. CITY RESPONSIBILITIES 1. Provide Engineer with a current title report with a boundary description and all the easements affecting the property. 2. Process the plat through the City and gather signatures. 3. Pay all fees associated with the plat to the various reviewing agencies. TIME OF COMPLETION and COMPENSATION SCHEDULE The following schedule is based on a Notice to Proceed (NTP) from the City by March 2013 and resulting completion of all tasks no later than May 2013. A NTP issued on a different date will change the schedule accordingly. COMPENSATION AND COMPLETION SCHEDULE Task Description Due Date Compensation 1 Field Survey Work May 2013 $5,480.00 TASK ORDER TOTAL $5,480.00 Task Order 10122.b Storey Park Field Survey Page 2 of 3 Civil Survey Consultants, Inc. The Not -To -Exceed amount to complete all services listed above for this Task Order No. 10122.b is five thousand, four hundred eighty dollars ($5,480.00). No compensation will be paid over the Not -to -Exceed amount without prior written approval by the City in the form of a Change Order. The hourly rates for services and direct expenses are per the Master Agreement (by this reference made a part hereof) and will be the basis for any additions and/or deletions in services rendered. Travel and meals are excluded from this Task Order unless explicitly listed in the Scope of Services AND Payment Schedule. CITY OF MERIDIAN BY: — �� Z6�� KEIT ATTS, Purchasing Manager Dated: 29 % Department roval BY: Jay GilibolKs Dated: 4 Task Order 10122.b Storey Park Field Survey Civil Survey Consultants, Inc. CIVIL SURVEY CONSULTANTS, INC BY: lK • r �'rr~5. Glenn K. Bennett, PLS Dated:, 3 r 3 Page 3 of 3