2010-708 Pathways Master Plan AmendmentsCITY OF MERIDIAN RESOLUTION NO. ID - -70 b
BY THE CITY COUNCIL: BIRD, HOAGLUN, ROUNTREE, ZAREMBA
A RESOLUTION OF THE MAYOR AND THE CITY COUNCIL OF THE CITY OF
MERIDIAN, AMENDING THE PATHWAYS MASTER PLAN; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, Meridian City Code section 2-2-3(A)(11) charges the Meridian Parks and
Recreation Commission with reviewing and commenting on the City's comprehensive plan as it relates
to parks and recreation, and the Meridian comprehensive plan includes, by reference, the Pathways
Master Plan;
WHEREAS, City staff from both the Planning Department and the Parks and Recreation
Department reviewed and analyzed the Pathways Master Plan, compared the information contained
therein to on -the -ground conditions, determined that the Pathways Master Plan contains some outdated
and/or inaccurate information, and proposed amendments to the Pathways Master Plan;
WHEREAS, on January 13, 2010, by resolution, the Parks and Recreation Commission
directed the Parks and Recreation Director to request that the City of Meridian City Council implement
the amendments to the Pathways Master Plan as set forth in the staff report, attached to the
Commission's resolution as Attachment I thereto; and
•WHEREAS, the Mayor and City Council find that it is in the best interest of the health, safety,
and welfare of the people of Meridian to implement such amendments to the Pathways Master Plan;
NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF
THE CITY OF MERIDIAN CITY, IDAHO:
Section 1. That the amendments to the Pathways Master Plan as set forth in Attachment I to
the Commission's January 13, 2010 resolution, attached hereto as Exhibit A, are hereby accepted and
adopted by the Mayor and City Council of the City of Meridian.
Section 2. That this Resolution shall be in full force and effect immediately upon its adoption
and approval.
ADOPTED by the City Council of the City of Meridian, Idaho, this ZOO day of
2010.
APPROVED by the Mayor of the City of Meridian, Idaho, this qU day of
AAt-2010.
y OF M
r VKY de Weerd
ATTEST:
SEAL
S _
By: CO
o
aycee fJohnan, City Clerk
O TSS �•r �•
RESOLUTION ADOPTING PATHWAYS MASTER PLAN AMENDMENTS
U -f
Page 1 of 1
•
0
0
EXHIBIT A
MPR Commission Resolution — danuary 13, 2010
Attachment 1
UPDATE
Proposed Pathways Master Plan Amendments
December 9, 2009
The Parks & Recreation Commission recommends the following changes to the Meridian
Pathways Master Plan for consideration by the Mayor and City Council:
A. LINDER ROAD/EAGLE ISLAND
Revise the narrative description for the Linder Road/Eagle Island Connector Pathway,
Section A, as follows:
Providing a connection to Eagle Island and the Greenbelt is vitally important for
bicyclists of all skill levels. The recommended connection is a combination on -
street facility and separated pathway along Linder from south of I-84 to the Eagle
Island entrance off Linder. The pathway will begin on the west side of Linder
south of I-84, continue with a physically separated connection over the interstate
and proceed north to Franklin. From Franklin, to Chateau a striped, on -street bike
lane will extend north to Chateau on both sides of the roadway. tie-padyway-ean
-4ifine en either- side of T ia&r- Read. North of Chateau to Eagle Island the a
separated pathway will proceed along the east side of the roadway. Pending
roadway design, the bike lane will likely continue in addition to the separated
pathway north of Chateau.
A shei4 teFm selofieft is an on stfeet r-eute with marked bike lanes or- .
Revise the maps on page 4-3 ("Pathway Network Map") and 4-22 ("Linder Road/Eagle
Island Pathway") as shown in Exhibit 1.
B. LOCHSA FALLS/HEROES PARK
Revise the maps on page 4-3 ("Pathway Network Map") and 4-24 ("Meridian Loop
Pathway") as shown in Exhibit 2.
The narrative description of the Meridian Loop Pathway, Section C (Meridian — Linder),
states the following:
"This pathway segment is completed. There is a short on -street segment
connecting from Lochsa Falls to Heroes Park."
A revision to the narrative is therefore not necessary.
C. FULLER PARK TO TEN MILE
Revise the map on page 4-3 ("Pathway Network Map") as shown in Exhibit 3.
D. DOWNTOWN/E. 3RD STREET
Revise the map on page 4-3 ("Pathway Network Map") as shown in Exhibit 4.
E. RIVER PLANNING AREA
Revise the map on page 4-2 ("Pathway Network Map") as shown in Exhibit S.
RESOLUTION OF PARKS & REc. COMMISSION — AMEND PATHWAYS MASTER PLAN PAGE 2 OF 7
•
•
0 2,000 4,000 8,000
Feet @ ■ ■ a e Proposed Change N
Change proposed 10' pathway to on -street bike
lane from Cayuse Creek south to Franklin.
Exhibit 1
RESOLUTION OF PARKS & REC. COMMISSION — AMEND PATHWAYS MASTER PLAN PAGE 3 OF 7
CHINDEN
1
1
I
l _
I I
1 •
CM N
w
OI
w
J
`
J 0
U ICK
''
USTICK USTICK
j
1I
dHER
E
Z
I
I
U
Y
J a
it
w Z
FRANKLIN
Q
w
J
2
I
INTER
ATE 84 INTERSTATE 8
0 2,000 4,000 8,000
Feet @ ■ ■ a e Proposed Change N
Change proposed 10' pathway to on -street bike
lane from Cayuse Creek south to Franklin.
Exhibit 1
RESOLUTION OF PARKS & REC. COMMISSION — AMEND PATHWAYS MASTER PLAN PAGE 3 OF 7
0
•
0
OL
'o 0 0o<
�ao
�0IDID
roID ID
-o�i�
o
o
�D0c:
(D v
� m o
0) O�
$Zo
o q -(D
:3 (D
m
n (D
m
7
m
x
N
■
;.i
RESOLUTION OF PARKS & REC. COMMISSION - AMEND PATHWAYS MASTER PLAN PAGE 4 OF 7
•
oI
v o o v
ID
c>a�S3
(D OCD S
pl (� 3
CD �G (D
(D
cf) C
� (Q CD �'
C ,l 7
(D
O O (D C N
O (D 3
W D (D
N
O r -p 7c O
O O (D O
ICD (7N ?(
in O N_m X Q
(D -0
CID
O_ fD (3D -`
S
�7r�
A O
, a) 3
,0 0- C1 r
S
Nin
Q
N S 7
N
O (D O CD
O
O
D 0 lD
�- S X
(�D
!D 7 U1 -
T �
0 v 3
•
C S �_
CD
(D
(�D `� (D
•
m
x
07
w
RESOLUTION OF PARKS & REC. COMMISSION — AMEND PATHWAYS MASTER PLAN PAGE 5 OF 7
•
z
a
a
W
CHERRY
FAIRVIEW
■
■
■
■
■
■
■
■
■
■
■
■
■
■■.■.■■■■■•■■.■■.'
•
•
•
•
z
■
'
a
z
■ _
.
o
a
�
■
Uj
W
PINE ■
■
■
■
■
•
z
.
0 125 250
500 750 1,000
Feet
Extend E. 3rd St. On Street Route north to Fairveiw
along proposed roadway extension alignment. Add
on street connections on Fairview from Main St. to
Lakes Ave. crossing, and on Washington from
E. 3rd to Cathy and north to tie in with Five Mile
Creek Pathway Segment H.1 at Badly.
Exhibit 4
RESOLUTION OF PARKS & REC. COMMISSION - AMEND PATHWAYS MASTER PLAN
. • • ■ Proposed Change
Existing Pathway
- - Long -Term Route
Micro Path
On Street Route
Proposed Pathway
PAGE 6 OF 7
CL
■
m
■
cn 73
(D _
O
Z E3
a
O
C (D
()
n
Q
n
� �
m
x
Q) —
v O
CL
n
0
� o
0 Z
n�
0
m
x
zT
0
Ai
c
LACK CAT
a
a
■
lJ
♦
•
rr
■
♦ o
t
:i
s ,
■
•
A41P•
z
v •
Z LINDER
RESOLUTION OF PARKS & REC. COMMISSION -AMEND PATHWAYS MASTER PLAN PAGE 7 OF 7
EMMETT
PALMER
D
1 m
m