Loading...
St. Luke's Chiller Plant UpgradeConditions Document 1 St. Luke’s Chiller Plant Upgrade - CZC - A-2016-0013 CERTIFICATE OF ZONING COMPLIANCE REPORT DATE: January 28, 2016 TO: Joe H. Bruce, Insight Architects FROM: Joshua Beach, Associate City Planner SUBJECT: St. Luke’s Chiller Plant Upgrade - CZC - A-2016-0013 OWNER: St Luke’s Regional Medical Center Ltd DESCRIPTION OF APPLICANT'S REQUEST The applicant, Joe H. Bruce, requests Certificate of Zoning Compliance (CZC) approval to add a roll-up service door to an existing mechanical building located on the St. Luke's Meridian Medical Center site, and the replacement of a cooling tower that is located in an exterior mechanical yard, on 57 acres of land in the L-O zoning district. The site is located at 520 S. Eagle Road. DECISION The applicant's request for Certificate of Zoning Compliance is approved with the conditions listed in this report. Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. Process Conditions of Approval 1. No signs are approved with this application. Prior to installing any signs on the property, the applicant shall submit a sign permit application consistent with the standards in UDC Chapter 3 Article D and receive approval for such signs. 2. The applicant shall complete all improvements related to public life, safety, and health as set forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in accord with UDC 11-5C-3C. 3. The site plan prepared by Insight Architects, P. A. on January 5, 2016, labeled A1.1, is approved by the City of Meridian Planning Division with no changes. 4. The elevations prepared by Insight Architects, P. A. on January 5, 2016, labeled A2.1, are approved by the City of Meridian Planning Division with no changes. 5. The approved site plan and elevations may not be altered without prior written approval of the City of Meridian Planning Division. 6. The applicant shall pay any applicable impact fees prior to the issuance of a building permit. 7. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. 8. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. Conditions Document 2 St. Luke’s Chiller Plant Upgrade - CZC - A-2016-0013 Ongoing Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-3B-5, UDC 11-3B-13 and UDC 11-3B-14. 2. The applicant shall comply with the outdoor storage as an accessory use standards as set forth in UDC 11-3A-14. 3. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (CZC-15-067). 4. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 5. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 6. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 7. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. 8. The applicant shall comply with the outdoor storage as an accessory use standards as set forth in UDC 11-3A-14. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before February 12, 2016, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-6B. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. EXPIRATION Certificates of Zoning Compliance issued in conjunction with a proposed use shall expire if the use has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. Certificates of Zoning Compliance issued in conjunction with construction or alteration of a structure shall expire if the construction or alteration has not commenced within one year of the date of issuance of the Certificate of Zoning Compliance. In accord with the above provisions, the subject Certificate of Zoning Compliance is valid until January 28, 2018. EXHIBITS A. Vicinity Map B. Site Plan (dated: January 5, 2016) C. Elevations (dated: January 5, 2016) Conditions Document 3 St. Luke’s Chiller Plant Upgrade - CZC - A-2016-0013 A. Vicinity Map Conditions Document 4 St. Luke’s Chiller Plant Upgrade - CZC - A-2016-0013 B. Site Plan (dated: January 5, 2016) Conditions Document 5 St. Luke’s Chiller Plant Upgrade - CZC - A-2016-0013 C. Elevations (dated: January 5, 2016) Conditions Document 6 St. Luke’s Chiller Plant Upgrade - CZC - A-2016-0013 Conditions Document 7 St. Luke’s Chiller Plant Upgrade - CZC - A-2016-0013 Conditions Document 8 St. Luke’s Chiller Plant Upgrade - CZC - A-2016-0013